title: "How much does CBAM cost?\nWho pays, and from when?"
description: "In 2026, a tonne of Chinese steel coil pays about €179 of CBAM with default values, far from the 2.5% often quoted. Calculation, dates and ways to cut it."
canonical: https://projetcelsius.com/en/blog/cbam-cost-estimate/
author: "Sébastien Pierfederici"
datePublished: 2026-05-25
dateModified: 2026-10-31
language: en
translationOf: https://projetcelsius.com/blog/cbam-quels-couts/
---

# How much does CBAM cost? Who pays, and from when?

**Author**: Sébastien Pierfederici
**Published**: 2026-05-25
**Updated**: 2026-10-31
**Section**: Regulation
**Canonical URL**: https://projetcelsius.com/en/blog/cbam-cost-estimate/
**French original**: https://projetcelsius.com/blog/cbam-quels-couts/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> With the European Commission's default values, CBAM costs **about €179 per tonne** of imported Chinese steel coil in 2026, at a certificate price of €82.32. The cost depends on the gap between those values and the level of an efficient European producer, far more than on the **2.5%** in the timetable. An importer of more than 50 tonnes a year pays for its 2026 imports **between February and September 2027**, then every quarter.

## Key takeaways

- A Chinese steel coil costs **about €179 per tonne** in CBAM in 2026.
- All the carbon **above the European benchmark** is paid for in full from 2026.
- Imports made in 2026 are paid for **between February and September 2027**.
- **Verified actual data** removes the default-value mark-up, which reaches up to 30%.

Using the default values published by the European Commission, the **CBAM charge** (Carbon Border Adjustment Mechanism) comes to **about €179 per tonne** of hot-rolled steel coil imported from China in 2026, at the certificate price published for the third quarter. The same calculation gives **€33 for a tonne of Moroccan cement** and €278 for an Indian steel coil. The cost bears no relation to the 2.5% in the European timetable, because **all the carbon above the European level** is paid for from the first year.

The cost of an import depends on 4 elements: the emissions counted for the product, the share deducted for free allocation, the certificate price and the year. The sections below take each in turn, then say who pays, when, and how to reduce the bill.

## How is the cost of CBAM calculated?

The importer pays CBAM by buying **CBAM certificates**, 1 for each tonne of CO2 equivalent (tCO2e) to be covered ([what a tonne of CO2 represents](https://projetcelsius.com/en/blog/company-carbon-footprint-main-emission-sources/)). The number of certificates starts from the emissions generated in making the product, then subtracts what a European producer still receives in **free allowances**. The formula comes from the [importer's practical guide](https://www.ecologie.gouv.fr/sites/default/files/documents/20260119_DGEC_MACF-Guide-pratique-importateur_.pdf) published by the Directorate-General for Energy and Climate (DGEC), the **competent authority in France**.

> **What is CBAM?** The Carbon Border Adjustment Mechanism (CBAM, known as MACF in French) makes the European importer pay for the carbon emitted outside Europe to make steel, aluminium, cement, fertilisers, hydrogen or electricity. The principle and scope are set out in [our explanation of CBAM](https://projetcelsius.com/en/blog/what-is-cbam/).

### The emissions counted

Without verified data from the supplier, the importer applies the **default values** published by the Commission for each product and each country, in an implementing regulation corrected on 20 July 2026. For 1 tonne of hot-rolled coil, the value is **2.12 tCO2e for South Korea** and **4.28 for India**. These values carry a **mark-up** to push importers towards actual data:

- For steel, aluminium, cement and hydrogen, the mark-up is **10% in 2026**, 20% in 2027, then **30% from 2028**.
- For nitrogen fertilisers, it is **1% from 2026**, with no increase planned, whatever the country of origin.

For steel and aluminium, **only direct emissions** count, under Annex II of [Regulation (EU) 2023/956](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R0956). For cement and fertilisers, **the plant's electricity** is added. The calculation follows the logic of a [product carbon footprint](https://projetcelsius.com/en/blog/product-carbon-footprint-lca-pef-cfp/), over the scope set by the regulation.

### The share covered by free allocation

Each imported tonne benefits from a deduction equal to the product's **CBAM benchmark**, multiplied by the year's **CBAM factor**. The benchmark is the intensity of an efficient European producer: **1.37 tCO2e** for a coil made in a blast furnace, under [Implementing Regulation (EU) 2025/2620](https://eur-lex.europa.eu/eli/reg_impl/2025/2620/oj). For a given production route, it is **the same whatever the country** of origin. For steel and aluminium, the route depends on the country, as the next section explains.

The factor is **97.5% in 2026**: the deduction covers almost the whole benchmark, but **nothing above it**. A last coefficient, the cross-sectoral correction factor, could have reduced the deduction; the Commission set it at **100% for 2026 to 2030**, which makes it neutral.

### The certificate price

In 2026, the certificate price is **the quarterly average** of the auction prices on the carbon market for industry, weighted by the volumes sold. This market is separate from the [second market that will cover fuels and heating](https://projetcelsius.com/en/blog/ets2-carbon-price-fuel-heating/). The Commission publishes these prices on its [certificate price page](https://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/price-cbam-certificates_en):

- €75.36 for imports in the first quarter of 2026, price published on 7 April 2026.
- €75.28 for the second quarter, price published on 6 July 2026.
- **€82.32 for the third quarter**, price published on 5 October 2026; the fourth-quarter price is expected on 4 January 2027.

From 2027, the price becomes **weekly**. No official source publishes a trajectory for the following years, so the calculator at the top of the article lets you choose the assumption, **from €50 to €150 per tonne**.

### An example: 1 tonne of Chinese steel coil

For 1 tonne of hot-rolled coil made in China and imported in the third quarter of 2026, the calculation takes 4 lines:

- The emissions counted are the default value for China, 3.187 tCO2e, with a 10% mark-up, giving **3.506 tCO2e**.
- The deduction is the benchmark of 1.37 tCO2e multiplied by the 97.5% factor, giving **1.336 tCO2e**.
- The importer must therefore surrender 3.506 minus 1.336, or **2.17 certificates**, for this tonne.
- At €82.32 per certificate, the tonne costs **about €179** in CBAM.

The 2.5% in the timetable applies only to the benchmark. On this coil, the share of the benchmark that is no longer deducted weighs **0.03 certificate**; the gap between the marked-up default value and the benchmark weighs **2.14**, paid in full. This is the warning carried by the formula in the DGEC guide, reproduced above.

> In 2026, all the carbon above the level of an efficient European producer is already paid for in full.

## Why does the cost differ from one country to another?

The cost of a tonne depends mainly on **the gap between the default value** for its country and its benchmark. The Commission publishes a value for most product-country pairs and, for steel and aluminium, a **default production route** that sets the benchmark deducted. Between South Korea and India, 2 major suppliers, the cost of the same coil varies **by a factor of three**. Across all countries, the gap runs from a few euros to more than €600 per tonne.

In the graphic above, the bar spans the range of values published for the countries, and the line marks the benchmark: what lies beyond the line **is paid for in full**. The figures come from the [DGEC's CBAM calculator](https://www.ecologie.gouv.fr/politiques-publiques/mecanisme-dajustement-carbone-aux-frontieres-macf), updated in September 2026.

### Steel, by the country's production route

For hot-rolled coil, the Commission publishes a specific value for **32 countries**: 26 are assigned to the blast furnace route, 6 to the electric arc furnace fed with scrap. The route sets the benchmark deducted: **1.37 tCO2e** for the blast furnace, **0.072** for the electric arc furnace.

A country without a value of its own receives the value for "other countries and territories", **4.05 tCO2e** for these coils, higher than the figure for China. The same reasoning applies to **reinforcing bars (rebar)**, which weigh on the [footprint of a new building](https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/).

### Aluminium, primary or recycled

Of the 67 countries with a value for unwrought aluminium alloys, **37 are assigned to secondary aluminium**, made by remelting scrap, and 30 to primary. The benchmark falls from **1.423 tCO2e** for primary to **0.091** for secondary. The electricity used for electrolysis **is not part of the calculation**, since only direct emissions count.

### Cement and fertilisers, electricity included

For grey cement, default values range from **0.85 tCO2e in Ethiopia** to 1.49 in Mongolia, electricity included. The benchmark deducted is **0.666 tCO2e** per tonne. Türkiye has no value of its own for this cement: the DGEC calculator applies the one for other countries, **1.44 tCO2e**, close to the top of the range.

For urea, the most common nitrogen fertiliser, the benchmark is **0.902 tCO2e**, and the mark-up stays at 1%. A tonne of Egyptian urea thus costs **about €43** in 2026, and a tonne of Chinese urea **about €165**. For an agricultural trader, this cost goes into the purchase price as well as into the [Scope 3 of its Bilan Carbone® (the French carbon accounting method)](https://projetcelsius.com/en/blog/scope-3-emissions-guide/).

## How will the bill change up to 2034?

From one year to the next, 3 movements add up in the cost of an imported tonne:

- The CBAM factor falls: 95% in 2027, 90% in 2028 and 77.5% in 2029, then **51.5% in 2030**, 39% in 2031, 26.5% in 2032 and 14% in 2033, before **dropping to 0 in 2034**.
- The mark-up on default values rises: 20% in 2027, then **30% from 2028** for steel, aluminium and cement.
- The certificate price follows the European carbon market, with **no official trajectory** published.

In the chart above, the hatched share **triples between 2026 and 2028**, then stays put. After that, it is the fall in the factor, set by Article 10a of the [EU Emissions Trading System Directive](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02003L0087-20240301), that lengthens the bar up to 2034.

### The 2030 step

Between 2029 and 2030, the factor goes from 77.5% to 51.5%: **the deduction loses a third** of its value in one year. For a product well above its benchmark, most of the cost is already paid from 2026. For a product close to the benchmark, the cost is **multiplied by nearly 20** between 2026 and 2030.

A steel whose actual emissions equal the benchmark of 1.37 tCO2e would cost **less than €3 per tonne** in 2026, at the price of €82.32. The same steel would cost **about €55 in 2030**, then €113 in 2034, when nothing is deducted any more.

> The lower a supplier's emissions, the more the 2030 step weighs on the cost of its tonnes.

### European producers on the same timetable

European producers of steel, aluminium, cement and fertilisers lose their free allowances **at the same pace**, through the same factor. CBAM is designed so that the carbon in an imported tonne and in a tonne produced in Europe **costs the same**. The consequences for a European site, exports included, are set out in our [CBAM guide for producers](https://projetcelsius.com/en/blog/cbam-free-allowances-phase-out/). Cement makers respond in particular through [carbon capture](https://projetcelsius.com/en/blog/carbon-capture-storage-ccs-2026/), supported by [decarbonisation funding](https://projetcelsius.com/en/blog/climate-transition-funding-carbon-footprint-lca/).

### The reform proposed on 17 July 2026

On 17 July 2026, the Commission proposed a revision of the European carbon market. For the CBAM sectors, the text would **push back the end of free allowances from 2034 to 2038**, and so the full ramp-up of the mechanism: the factor would stay at 15% from 2034 to 2037. It would also be raised from 2028, with **59% in 2030** instead of 51.5%. The other exposed sectors would keep free allowances until 2040, provided they invest in decarbonisation in Europe. The environment ministers [discussed it on 12 October 2026](https://www.consilium.europa.eu/en/meetings/env/2026/10/12/), without a decision: the Council presidency is aiming for an agreement in December.

Until this text is adopted, **the timetable in force remains the one ending in 2034**, and the calculator follows it. For a company preparing for its [climate obligations in the coming years](https://projetcelsius.com/en/blog/snbc-3-business-obligations/), the prudent scenario remains that of the text in force.

## Who pays CBAM, and from when?

CBAM is payable by **the importer established in the Union**, or by its indirect customs representative. The foreign supplier pays nothing directly, but **its emissions data** decides its customer's bill.

### The importer, above 50 tonnes a year

An importer is exempt if the cumulative mass of steel, aluminium, cement and fertilisers it imports in the year **does not exceed 50 tonnes**, under [Regulation (EU) 2025/2083](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32025R2083). Above that, **all the year's imports** enter the calculation, including the first 50 tonnes. Electricity and hydrogen do not benefit from this threshold.

Above the threshold, the importer must hold **authorised CBAM declarant** status, processed in France by the DGEC. Applications filed before 31 March 2026 allow imports to continue while awaiting the reply; the others must **wait for approval**. A company established for less than 2 financial years also provides a **bank guarantee** equal to the estimated cost of its certificates.

### The payment timetable

Imports made in 2026 **are only paid for in 2027**, then the rhythm becomes quarterly. The timeline below sets the dates out to scale.

From 2027, at the end of each quarter, the importer's account must hold certificates covering **at least 50% of the emissions** imported since 1 January, net of free allocation. This calculation starts from default values without the mark-up, or from the certificates surrendered the previous year for the same products and countries. Surplus certificates **can be resold to the Commission**, on a request filed by 31 October at the latest and within a limit set by the regulation.

### Fines

A declarant that does not surrender its certificates by **30 September** pays, for each missing certificate, the fine of the European carbon market: **€100 per tonne**, adjusted for European inflation since 2013. It does not release the declarant from surrendering the certificates due.

An importer that exceeds the 50-tonne threshold without being an authorised declarant risks a fine of **3 to 5 times this amount** per certificate not surrendered. The authority calculates it on default values, net of free allocation.

## How can you reduce or anticipate the bill?

4 levers reduce the cost or smooth its effect. None removes the need to know first, **line by line**, the products, countries and tonnages imported, just as any [emissions reduction plan](https://projetcelsius.com/en/blog/how-to-reduce-company-carbon-footprint/) starts with the inventory.

### The supplier's actual data

A [declaration based on the plant's actual emissions](https://projetcelsius.com/en/blog/cbam-default-values-or-actual-emissions/) **removes the mark-up**. On the Chinese coil, the 30% mark-up planned from 2028 represents **0.96 certificate per tonne**, or about €79 at €82.32. These emissions must be **verified by an accredited verifier** ([how to choose your CBAM verifier](https://projetcelsius.com/en/blog/cbam-verifier-how-to-choose/)), as with a [Bilan Carbone® verified by a third party](https://projetcelsius.com/en/blog/in-house-carbon-footprint-third-party-verification/).

In France, [COFRAC (the French Accreditation Committee) opened accreditation](https://www.cofrac.fr/actualites/actualites-et-evenements/ouverture-de-laccreditation-pour-la-verification-des-declarations-demissions-intrinseques-des-marchandises-dans-le-cadre-du-mecanisme-dajustement-carbone-aux-frontieres-macf-cbam) on 20 August 2026. According to the [Commission](https://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/cbam-verification_en), accredited verifiers have been able to register in the CBAM registry since September 2026 and can issue their first reports in January 2027. As of 31 October 2026, **no list of verifiers** has been published, and the DGEC, which has not yet given a date for the first verifications, advises estimating the year's costs on default values. Actual data for the following years is prepared from now on, installation by installation, as with an [industrial site footprint](https://projetcelsius.com/en/blog/industrial-site-carbon-footprint/); its cost can be compared with that of a [life cycle assessment](https://projetcelsius.com/en/blog/lca-cost/).

### The carbon price paid at origin

If the producer has paid a carbon price in its country, the importer can **deduct it from its certificates**, supported by evidence certified by an independent person. With default values, the deduction goes through the **default carbon prices** that the Commission may publish by country from 2027.

### The supplier and its production route

For an identical product, **the bill follows the supplier**. With actual data, a plant that emits little per tonne pays little, since the cost is the gap between its emissions and its benchmark. With default values, the route assigned to the country can work against the buyer: Thailand is assigned to the electric arc furnace, with a benchmark of **0.072 tCO2e**, for a default value of 1.92.

A Thai coil thus costs **about €168 per tonne** in 2026, almost as much as a Chinese coil. Changing supplier is therefore decided on **the plant's actual emissions**, which the supplier must be able to provide and have verified, like the evidence required by the [regulation on imported deforestation](https://projetcelsius.com/en/blog/eudr-who-is-affected/).

### The contract and cash flow

The cost of CBAM is negotiated in the purchase contract and planned in the budget:

- The contract can require the supplier to **provide the emissions** for each delivery, in the reporting format published by the Commission, and to have them verified.
- It can also **share the cost of certificates** between buyer and seller, or index the price to the certificate price, quarterly in 2026 then weekly.
- The 2026 budget must provide for **a charge paid in 2027**, then, from 2027, a quarterly cash advance of 50% of emissions.

The same data feeds the company's [sustainability statement](https://projetcelsius.com/en/blog/csrd-2026-who-is-in-scope-after-omnibus/) and [climate transition plan](https://projetcelsius.com/en/blog/climate-transition-plan-requirements/), as well as its [reduction pathway](https://projetcelsius.com/en/blog/sbti-for-industrial-smes/), where imported purchases count as indirect emissions.

For us at Projet Celsius, the figure to calculate first is not the carbon price, which nobody knows for 2030, but **the gap to the benchmark** of the default value, for each product and each country imported. It tells you, from 2026, where actual data pays off, which supplier is expensive and which purchase line deserves a revised contract. Our cost simulations start with this calculation, based on the year's customs declarations, before helping suppliers produce verifiable [emissions data](https://projetcelsius.com/en/blog/lca-vs-carbon-footprint/).

## Key takeaways

- In 2026, with default values, a tonne of Chinese steel coil costs **about €179 in CBAM** at €82.32 per certificate, and for this same product the cost ranges from under €20 to over €600 per tonne depending on the country.
- The 97.5% factor applies only to the benchmark: **everything above it** is paid in full from 2026.
- Default values carry a 10% mark-up in 2026, then 30% from 2028 for steel, aluminium and cement; **verified actual data** removes this mark-up.
- Imports made in 2026 are paid for **between February and September 2027**, by 30 September at the latest; from 2027, certificates covering 50% of emissions must be held each quarter.
- Only importers of **more than 50 tonnes a year** of these products are affected, but then for all of their tonnes.

For European producers in the same sectors, the end of free allowances follows the same timetable: see our [CBAM guide for manufacturers](https://projetcelsius.com/en/blog/cbam-free-allowances-phase-out/).

## Frequently asked questions

## Frequently asked questions

### How much does CBAM cost per tonne?

It depends on the product and the country of origin. With default values and the €82.32 price published for the third quarter of 2026, a tonne of hot-rolled steel coil costs about €179 if it comes from China, €278 if it comes from India and €82 if it comes from South Korea. A tonne of Moroccan grey cement costs about €33, a tonne of Egyptian urea about €43.

### Does CBAM cost only 2.5% in 2026?

No. The 97.5% factor applied in 2026 reduces only the deduction, which equals the benchmark of an efficient European producer. Everything above that benchmark is paid for in full from 2026. The Directorate-General for Energy and Climate calls it a "common mistake" (our translation) to think that only 2.5% of the emissions imported in 2026 would be paid for.

### Which carbon price should I use to estimate CBAM?

For 2026 imports, the price for each quarter published by the Commission: €75.36 for the first quarter, €75.28 for the second and €82.32 for the third, with the fourth expected on 4 January 2027. From 2027, the price becomes weekly. No official trajectory exists for the following years, so it is better to test several assumptions.

### When do you have to pay CBAM?

Certificates for 2026 imports go on sale from 1 February 2027 and must be surrendered, with the annual declaration, by 30 September 2027 at the latest. From 2027, the declarant must also hold, at the end of each quarter, certificates covering at least 50% of the emissions imported since the start of the year.

### Who pays CBAM, the importer or the supplier?

The importer established in the Union, or its indirect customs representative, as soon as it imports more than 50 tonnes a year, cumulatively, of steel, aluminium, cement or fertilisers. The foreign supplier pays nothing directly, but its actual emissions, if it provides them and has them verified, can reduce the bill. The sharing of the cost is settled in the purchase contract.

### What happens if CBAM certificates are not surrendered?

A fine per missing certificate, equal to that of the European carbon market: €100 per tonne, adjusted for European inflation since 2013, with no release from the obligation to surrender the certificates. An importer that exceeds the 50-tonne threshold without being an authorised declarant risks 3 to 5 times this amount per certificate not surrendered.

## Sources

- European Parliament and Council, [Regulation (EU) 2023/956 establishing CBAM](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R0956), 10 May 2023, Articles 22, 26 and 31 and Annex II, EUR-Lex.
- European Parliament and Council, [Regulation (EU) 2025/2083 simplifying CBAM](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32025R2083), 8 October 2025 (50-tonne threshold, timetable, guarantee, fines), EUR-Lex.
- European Commission, [Implementing Regulation (EU) 2025/2620](https://eur-lex.europa.eu/eli/reg_impl/2025/2620/oj) on the free allocation adjustment and CBAM benchmarks, 16 December 2025.
- European Commission, Implementing Regulation (EU) 2025/2621 on default values, corrected by Implementing Regulation (EU) 2026/1740 of 20 July 2026, and [default values file](https://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/cbam-legislation-and-guidance_en) of 10 August 2026.
- European Commission, [Implementing Decision (EU) 2026/1862](https://eur-lex.europa.eu/eli/dec_impl/2026/1862/oj) setting the cross-sectoral correction factor at 100% for 2026-2030, 23 July 2026.
- European Parliament and Council, [Directive 2003/87/EC, consolidated version](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02003L0087-20240301), Article 10a (CBAM factor) and Article 16 (fine on excess emissions).
- European Commission, [CBAM certificate prices](https://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/price-cbam-certificates_en), accessed on 17 October 2026, and [Implementing Regulation (EU) 2025/2548](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32025R2548) on the price calculation, 10 December 2025.
- European Commission, Guidance No. 4, calculation of the free allocation adjustment, 14 August 2026 (table 2-1), on the [CBAM legislation and guidance page](https://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/cbam-legislation-and-guidance_en).
- Directorate-General for Energy and Climate, [CBAM page and CBAM charge calculator](https://www.ecologie.gouv.fr/politiques-publiques/mecanisme-dajustement-carbone-aux-frontieres-macf), version of 4 September 2026, page updated on 16 October 2026 (in French).
- Directorate-General for Energy and Climate and Directorate-General for Customs, [importer's practical guide](https://www.ecologie.gouv.fr/sites/default/files/documents/20260119_DGEC_MACF-Guide-pratique-importateur_.pdf), 19 January 2026 (PDF, in French).
- European Commission, [proposal to revise the European carbon market, COM(2026) 616](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=COM:2026:616:FIN), 17 July 2026 (proposed CBAM factor, Article 10a).
- Council of the European Union, [note 13435/26 on the revision of the carbon market](https://data.consilium.europa.eu/doc/document/ST-13435-2026-INIT/en/pdf), 25 September 2026 (PDF), and [outcome of the Environment Council of 12 October 2026](https://www.consilium.europa.eu/en/meetings/env/2026/10/12/).