---
title: "Climate transition plan: what BEGES, the CSRD and EmpCo require"
description: "Transition plan: BEGES requires a quantified action plan, CSRD a 1.5°C-compatible strategy and EmpCo a verified plan behind a \"net zero\" claim."
canonical: https://projetcelsius.com/en/blog/climate-transition-plan-requirements/
author: "Guillaume Pakula"
datePublished: 2026-09-28
dateModified: 2026-10-24
language: en
translationOf: https://projetcelsius.com/blog/plan-de-transition-climat-entreprise/
---

# Climate transition plan: what BEGES, the CSRD and EmpCo require

**Author**: Guillaume Pakula
**Published**: 2026-09-28
**Updated**: 2026-10-24
**Section**: Practical guide
**Canonical URL**: https://projetcelsius.com/en/blog/climate-transition-plan-requirements/
**French original**: https://projetcelsius.com/blog/plan-de-transition-climat-entreprise/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> The **transition plan** has become a regulatory document: attached to [BEGES](https://projetcelsius.com/en/blog/beges-france-mandatory-ghg-report/) (France's mandatory greenhouse gas emissions report), described in the CSRD report under **standards published on 21 September 2026**, required behind every "net zero" target shown to consumers. The 3 texts expect different content, and **a plan written solely for the platform of ADEME (the French Agency for Ecological Transition)** covers only part of the European requirements. Only **quantification measure by measure** meets all 3 at once.

## Key takeaways

- **The emissions report (BEGES), CSRD and EmpCo** require 3 different transition plans.
- **BEGES expects a 4-year plan**, CSRD a 1.5°C strategy.
- **A quarter of BEGES plans published since 2023** specify no expected reduction volume.
- **One plan, quantified measure by measure**, can serve all 3 texts.

If your company published its French greenhouse gas emissions report (BEGES) in 2022 or 2023, it must renew it in 2026 or 2027, **including the transition plan**. This plan is required by 3 texts, in different forms. BEGES expects **an action plan until the next report**, with a quantified reduction volume. The CSRD (Corporate Sustainability Reporting Directive) climate standard, whose revised version appeared in the EU Official Journal on 21 September 2026, calls for **a strategy compatible with 1.5°C**. The EmpCo Directive requires **a plan verified by an independent expert** behind every "net zero" target displayed to consumers.

Companies renewing their BEGES generally have a plan written for the platform run by ADEME, which meets **only part of a CSRD auditor’s expectations**. Our analysis of **1,644 plans published since 2023** shows what they most often lack. **A quantified case of a mid-cap industrial company (ETI in French)** shows how to move from an assessment to a plan that stands up.

## What is a climate transition plan?

A transition plan describes **the path between today’s emissions and a time-bound target**: selected measures, the reduction each brings, its cost, timetable and the person accountable for it.

### An assessment, a target, a plan

The assessment, target and plan are often confused, although they answer 3 distinct questions. The [emissions assessment](https://projetcelsius.com/en/blog/bilan-carbone-method-explained/) says **where we start**, source by source. The target says **where we want to go**, for example an absolute emissions reduction by 2030 aligned with [a pathway validated by the Science Based Targets initiative (SBTi)](https://projetcelsius.com/en/blog/sbti-for-industrial-smes/). The plan says **how we get there**: which measures, how many tCO2e each, with what budget and by what date.

The European climate reporting standard provides a useful definition: a plan showing how the undertaking intends to transform its strategy and business model to make them compatible with a low-carbon economy. It therefore commits to **investment and business model choices**, far beyond a list of small environmental actions, explaining why the CSRD asks for details of **its approval by administrative and management bodies**.

### SNBC 3 as the reference pathway

For a French company, the public reference is the [third National Low-Carbon Strategy](https://projetcelsius.com/en/blog/snbc-3-business-obligations/) (SNBC), adopted by decree on 16 July 2026. It sets **276 MtCO2e in 2030** for the whole country, compared with 359 in 2025. That is **-23% in 5 years**, around 5% a year. It **does not apply directly to companies**, but the official BEGES method recommends positioning plan targets against it.

This method, published in 2022, still cites the previous strategy’s benchmarks, **-40% between 1990 and 2030**. SNBC 3 represents -49.5% between 1990 and 2030, from 547 to 276 MtCO2e. **A plan written in 2026 would do well to refer to the new figure**, and to its sector’s pathway, or to the [CRREM pathway](https://projetcelsius.com/en/blog/crrem-pathway-stranding-risk/) for its buildings.

## What does BEGES require for the transition plan?

Since the 2019 French Energy and Climate Law, BEGES has been more than a snapshot of emissions. Companies with more than 500 employees, 250 overseas, **attach a transition plan to the report**, made public with it and updated every 4 years.

### What the French Environmental Code says

[Article L. 229-25](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000051559662) requires a plan presenting **the objectives, resources and actions envisaged**, as well as actions carried out since the previous report. Article R. 229-47 sets its content:

- **A review of past actions**, that is, what has been implemented since the previous report, and the results achieved.
- **Actions and resources envisaged** until the next report, presented separately for direct and indirect emissions.
- **The overall expected reduction volume**, for direct and indirect emissions.

The mandatory horizon is therefore short: **4 years**, until the next report. For a company not subject to the CSRD, mandatory indirect emissions also **extend only to purchased electricity, heat and steam**. In that case, [scope 3 is not required](https://projetcelsius.com/en/blog/is-scope-3-reporting-mandatory/), and a compliant plan may ignore purchasing, even though it is often [the largest footprint source](https://projetcelsius.com/en/blog/company-carbon-footprint-main-emission-sources/). Companies publishing their assessment and plan in their CSRD sustainability report are **exempt from BEGES**, provided they describe their activities in France.

### What the official method additionally expects

The [regulatory method of the French Ministry of Ecological Transition](https://www.ecologie.gouv.fr/sites/default/files/documents/methodo_BEGES_decli_07.pdf), version 5, specifies expectations. It requires **quantified targets over 2 horizons**, the next report and the long term, for example 2030 and 2050. For every action, it requires **at least the human and financial resources** committed. It recommends estimating the effect of the costliest actions using **ADEME’s quantification method**, adding actions that improve carbon accounting itself, and distinguishing changes in the assessment arising from actions from those arising from activity.

Our calculation compares these expectations with published plans, using [ADEME’s open dataset](https://data.ademe.fr/datasets/bilan-ges). Of the **1,644 BEGES reports** submitted under version 5 of the method by companies subject to the requirement between February 2023 and September 2026, **26% announce no reduction volume**, although the Code requires one. Almost half of these reports have **no quantified target for 2030**, and their "actions and resources" section mentions **a euro amount in 3% of cases**.

### Inspection and penalties

**No third party verifies BEGES**: the regional prefect, together with the regional council president, identifies published reports and checks compliance, including the plan. In case of a breach, the prefect serves the company with **formal notice**, then may impose a fine **of up to €50,000, €100,000 for a repeat offence**, and make it public. Since the 2023 French Green Industry Law, a public buyer has also been able to exclude a company that has not prepared its report from a contract, in addition to [the environmental criterion now scored in every procurement](https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/).

## What does the CSRD require for the transition plan?

In the sustainability report required by the CSRD, the transition plan is the subject of the first requirement of the European Sustainability Reporting Standards (ESRS) on climate, **ESRS E1-1**. Its ambition is different: showing that the company’s strategy is compatible with **the Paris Agreement’s 1.5°C limit** and EU climate neutrality in 2050. Consistency between this plan, its actions and its targets is one of the [enforcement priorities set by the European Securities and Markets Authority (ESMA) for the 2026 financial year](https://projetcelsius.com/en/blog/csrd-sustainability-report-2026-mistakes/).

### Who publishes, and for which financial year

The [Omnibus Directive of 24 February 2026](https://eur-lex.europa.eu/eli/dir/2026/470/oj) restricts the CSRD to companies with **more than 1,000 employees and €450 million in turnover**, once transposed, by 19 March 2027 at the latest. As of 28 September 2026, **French law has not changed**. The revised standards, published on **21 September 2026** by [Delegated Regulation (EU) 2026/1563](https://eur-lex.europa.eu/eli/reg_del/2026/1563/oj), apply to financial years beginning **from 1 January 2027**, and optionally from 2026. Our articles on [CSRD after Omnibus](https://projetcelsius.com/en/blog/csrd-2026-who-is-in-scope-after-omnibus/) and [corporate social responsibility (CSR) requirements by size](https://projetcelsius.com/en/blog/csr-legal-requirements-france/) detail the scope.

### The 5 required elements

The revised standard requires publication of:

- **The plan’s main characteristics**, that is, its reduction targets, decarbonisation measures, key actions, investments and funding, approval by administrative and management bodies, and consistency with strategy.
- **The financial year’s investments relating to coal, oil and gas**, if any.
- **The main assumptions and dependencies** underpinning the plan.
- **A qualitative assessment of locked-in emissions**, those committed for years by existing equipment or products.
- **Progress made** in its implementation.

The company also states whether its targets are **compatible with 1.5°C**, explaining any gap if they are not. It provides the financial resources allocated to the plan, with **an indicative range for coming years**. The standard does not require adoption of a plan: a company without one declares this and **states whether it intends to adopt one, and by when**. The climate section is **certified by a statutory auditor or an independent third-party body**, alongside the rest of the report, and [a Bilan Carbone®, the French carbon accounting method, can underpin its quantification](https://projetcelsius.com/en/blog/esrs-e1-ghg-inventory-after-omnibus/).

### What changes compared with 2023

The 2023 version listed **10 elements**; the revision retains 5. The alignment plan with the **EU taxonomy** and mention of exclusion from "Paris Agreement" benchmarks disappear. **Assumptions and dependencies** appear: deployment of a technology, available workforce, ability to change the value chain or expected regulatory developments, all conditions for success that the company does not control alone.

> **What about the due diligence directive?** The Corporate Sustainability Due Diligence Directive (CSDDD) required the largest companies to adopt a transition plan (Article 22). The Omnibus Directive of 24 February 2026 **deleted this article**, considering these provisions disproportionate: only the CSRD publication requirement remains.

## What does EmpCo require to back up a "net zero" target?

[Directive (EU) 2024/825](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32024L0825), known as EmpCo for "Empowering Consumers", governs commercial communication to consumers. It is aimed in particular at **any claim about future environmental performance**, whether relating to a product or the company: "net zero in 2040", "-50% by 2030", "carbon neutral in 2050".

### What the directive says

It considers such a claim misleading if it is not supported by "clear, objective, publicly available and verifiable" commitments set out in **a detailed and realistic implementation plan**. This plan includes **measurable, time-bound targets** and the elements needed to achieve it, such as resource allocation. The plan is **regularly verified by an independent third-party expert**, whose findings are made public.

Assessment is **case by case**, because a future commitment is not on the blacklist of practices prohibited in all circumstances. That list includes product neutrality achieved through offsetting, detailed in [our carbon neutrality article](https://projetcelsius.com/en/blog/carbon-neutral-claims-what-companies-can-say/). The [Commission FAQ](https://commission.europa.eu/document/download/3c257883-bb2a-4dd9-a6dc-501d587bb34f_en?filename=faq-empowerting-consumers-gtd.pdf), September 2026 version, confirms that the rule also applies **at company level**, including for a pathway towards neutrality.

### Who may verify the plan

The directive does not specify a verifier: according to the Commission, **a private auditor or consultancy** may fill the role if independent, free of conflicts of interest and environmentally competent. The frequency is not fixed, with **an annual review or one every 2 years** cited as good practice. **A QR code** may link to the plan and findings. SBTi target validation attests to the targets’ ambition when issued; the directive additionally expects **regular progress monitoring**.

### In France, before transposition

France, which was due to apply EmpCo on 27 September 2026, has not yet transposed it. The [bill adopted by the Senate on 18 February 2026](https://www.assemblee-nationale.fr/dyn/17/dossiers/DLR5L17N53140), which reproduces this rule almost word for word, **still awaits plenary examination** in the National Assembly. Current French law already penalises a misleading practice concerning **the extent of the advertiser’s commitments, particularly in environmental matters**. A company engaging in such a practice faces a fine of up to **€1.5 million**, which may be raised to 10% of turnover or **80% of advertising expenditure**.

The Paris Judicial Court relied on this legislation, **without waiting for transposition**, to find misleading at first instance on 23 October 2025 the way TotalEnergies presented its **ambition of carbon neutrality in 2050** on its website. The [EmpCo application timetable](https://projetcelsius.com/en/blog/empco-application-dates/) tracks legislative progress, and our article on [banned environmental claims](https://projetcelsius.com/en/blog/banned-environmental-claims-eu/) details risky wording.

## The 7 elements of a plan that stands up before an auditor

Combining the 3 texts, a credible plan brings together **7 elements**. Each answers a question a statutory auditor, independent expert or state service will ultimately ask.

### A starting point that can be recalculated

The plan starts from an assessment with a documented **base year**, scope and method, whether Bilan Carbone® or the [GHG Protocol](https://projetcelsius.com/en/blog/bilan-carbone-vs-ghg-protocol/). When the scope changes through an acquisition or disposal, or an emission factor is revised, the base year is recalculated. Without this, **a displayed decrease may simply reflect a disposal**.

### Measures quantified in tCO2e

Every measure is quantified through the same operation: **activity data multiplied by the difference in emission factor** between the current and target situations. The sum of measures gives the reduction volume BEGES requires. In the plans we review, 2 errors recur: counting **the decrease in the national electricity emission factor** as an action, and adding **2 measures addressing the same consumption**, insulation and a heat pump for example. [Reduction measures](https://projetcelsius.com/en/blog/how-to-reduce-company-carbon-footprint/) are then ranked by their footprint contribution.

### Approved resources and governance

The plan assigns each action **an investment or expenditure, an owner and a date**, or the measure remains an intention. Management or the board then approves the plan, a step the CSRD report must describe. The budget need not be final: the European standard accepts **a range for coming years**, and [public grants](https://projetcelsius.com/en/blog/climate-transition-funding-carbon-footprint-lca/) may cover part of it.

> Only 3% of the transition plans published since 2023 by companies subject to the requirement mention a euro amount in their actions and resources, although the official method requires financial resources for each action.

### Assumptions, dependencies and locked-in emissions

An honest plan states **what must happen outside the company** for it to succeed: a reinforced electricity connection, a supplier able to deliver recycled steel or a change in [carbon prices](https://projetcelsius.com/en/blog/ets2-carbon-price-fuel-heating/). It also identifies **locked-in emissions**, those a furnace, boiler or recent fleet commits until replacement, and states when they can fall.

## From assessment to plan: a quantified case of a mid-cap industrial company

To show the method, take a fictional company with the profile of an industrial mid-cap subject to BEGES: **a metal shelving manufacturer with 650 employees**, with one site in France. This company is below the 1,000-employee threshold adopted by Omnibus for the CSRD. Its products consume no energy in use, and all calculations use emission factors from **ADEME’s Base Empreinte**.

### Rank before quantifying

Its 2025 footprint is **17,700 tCO2e**. Purchased steel accounts for **62%**: 5,000 tonnes at 2,211 kgCO2e per tonne, or **11,055 tCO2e**. Next come gas for furnaces and heating, 9 GWh and 2,151 tCO2e including upstream emissions, electricity at 311 tCO2e and the fleet at 186 tCO2e. Other sources (other purchasing, freight, travel, waste, capital goods) are fixed at 4,000 tCO2e. The mandatory BEGES scope, combustion on site and in vehicles and production of purchased electricity, or 2,168 tCO2e, accounts for only **12% of the total**, with upstream energy emissions falling under scope 3.

### What is a plan limited to the mandatory scope worth?

The 3 energy measures, furnace heat recovery, a heat pump for heating and an electric fleet, remove 871 tCO2e by 2030, including 733 within the mandatory scope. That represents **-34% within that scope**, a flattering result on ADEME’s platform, but **only -5% of the complete footprint**. The 2 purchasing measures, 40% recycled steel and 10% less steel per product, remove 3,397. The plan then reaches **-24% across the complete footprint**, in line with the -23% SNBC 3 sets for the country between 2025 and 2030.

### What remains locked in

Even after this plan, gas furnaces still emit **1,422 tCO2e a year**, including 1,196 from combustion, locked in until replacement with electric furnaces. This replacement requires **a more powerful electricity connection**, the assumption and dependency the plan must spell out. The electric fleet also shifts some emissions to vehicle manufacturing, counted in capital goods.

For us at Projet Celsius, the costliest mistake is **building the plan solely on the mandatory scope**. Such a plan displays a large percentage decrease and leaves aside **88% of emissions**, the ones major clients ask their suppliers about for their own [scope 3](https://projetcelsius.com/en/blog/scope-3-emissions-guide/). Our article on [an industrial site’s Bilan Carbone®](https://projetcelsius.com/en/blog/industrial-site-carbon-footprint/) shows where opportunities lie in other activities.

## Where to start if your BEGES is due for renewal in 2026 or 2027

One plan, built once on the complete footprint, can feed the 3 texts, provided it is designed from the outset for **the most demanding of them**.

- **Review the previous plan**, the first section the French Environmental Code requires, with the actions carried out, the reductions achieved and the gaps explained.
- **Recalculate the footprint over a complete scope**, including scope 3 even if it is not mandatory for you, and [at a frequency suited](https://projetcelsius.com/en/blog/annual-carbon-footprint-assessment/) to plan monitoring.
- **Quantify each measure in tCO2e and euros**, with an owner and a date, and derive the expected reduction volume.
- **Set targets** for the next report, 2030 and 2050, position them against SNBC 3 and have management approve the plan.
- **Adapt the plan** to the [sections of ADEME’s platform](https://projetcelsius.com/en/blog/beges-filing-ademe-platform/) for BEGES, to section E1-1 if you are subject to the CSRD and to a verified public page if you display a future target.

Companies structuring their first approach can use [Diag Décarbon'Action](https://projetcelsius.com/en/blog/diag-decarbonaction-complete-guide/) (a carbon footprint programme for companies in France, subsidised by Bpifrance, the French public investment bank) or the ACT method, launched in 2015 with ADEME, which helps **build and then assess a climate strategy**. If you prefer to delegate, [our regulatory BEGES support](https://projetcelsius.com/en/services/beges-ghg-report/) covers the assessment, plan and publication.

## Key takeaways

- **BEGES requires an action plan until the next report**, with past actions and their results, actions and resources separated by emission type and the expected reduction volume.
- **The CSRD calls for a strategy compatible with 1.5°C**, described in 5 elements in the revised ESRS E1-1, applicable to 2027 financial years, or a declaration of having no plan.
- **EmpCo makes every future target displayed to consumers conditional** on a detailed plan, resourced and [regularly verified by an independent expert](https://projetcelsius.com/en/blog/climate-commitments-third-party-verification/).
- **The CSDDD has not required a plan** since the Omnibus Directive of 24 February 2026.
- **A quarter of BEGES plans published since 2023** omit the expected reduction volume, although the Code requires it. Quantification measure by measure, across the complete footprint, makes the difference.

For each text, [our mandatory BEGES guide](https://projetcelsius.com/en/blog/beges-france-mandatory-ghg-report/) details **thresholds and timetable**, [our EmpCo explanation](https://projetcelsius.com/en/blog/what-is-empco-directive/) sets out the rule on future commitments, and [our method for proving a claim](https://projetcelsius.com/en/blog/green-claims-what-empco-bans/) helps formulate a climate target that stands up.

## Frequently asked questions

### Is a transition plan mandatory?

Not for all companies: it is for those subject to BEGES, more than 500 employees in mainland France and 250 overseas, which attach it to their report every 4 years. Companies subject to the CSRD describe their plan in their sustainability report, or declare they have none and state whether they intend to adopt one. EmpCo requires it for every company displaying a future environmental target in consumer communication, a rule France has not yet transposed. The European due diligence directive has not required one since the Omnibus Directive of February 2026.

### What must a BEGES transition plan contain?

Article R. 229-47 of the French Environmental Code requires 3 elements: the actions carried out since the previous report and their results, the actions and resources envisaged until the next report, and the overall expected reduction volume. The actions and resources envisaged must be presented separately for direct and indirect emissions. The ministry’s official method additionally recommends medium- and long-term targets and quantifying each action’s human and financial resources.

### Can a company subject to the CSRD have no transition plan?

Yes: ESRS E1-1 does not require adoption of a plan, but description of it if one exists. Without a plan meeting the required characteristics, the company declares this and states whether it intends to adopt one, and by when. This declaration is certified alongside the rest of the sustainability report.

### Can you still display a "net zero 2050" target?

Yes, provided you can substantiate it: under EmpCo, a future target must rest on a detailed, realistic implementation plan with measurable, time-bound targets and allocated resources. The plan must be regularly verified by an independent expert whose findings are public. In France, current law already penalises misleading environmental commitments, as shown by the first-instance judgment against TotalEnergies on 23 October 2025.

### Must the transition plan be validated by SBTi?

No: no legislation requires SBTi. The CSRD asks whether targets are science-based and compatible with 1.5°C, and SBTi validation is a recognised way to establish this. SBTi has published version 2 of its net zero standard. Under its timetable, validations using this version begin in the first quarter of 2027, version 1.3.1 remains usable until 31 January 2028 and version 2 will apply to every new submission from 1 February 2028.

### Where can you find examples of transition plans?

Plans attached to BEGES reports are public: bilans-ges.ademe.fr and ADEME’s open dataset list almost 12,000 reports published since 2015, including recent plans. Sustainability reports from companies subject to the CSRD include an E1-1 section. This article’s quantified case applies the method to a fictional mid-cap industrial company.

## Sources

- **BEGES**: French Environmental Code, [Article L. 229-25](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000051559662) (Law No. 2025-391 of 30 April 2025), Articles R. 229-46, [R. 229-47](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000048878409) (Decree No. 2023-1394 of 30 December 2023), R. 229-49, R. 229-50 and R. 229-50-1; French Public Procurement Code, Article L. 2141-7-2; French Ministry of Ecological Transition, [method for carrying out greenhouse gas emissions reports, version 5](https://www.ecologie.gouv.fr/sites/default/files/documents/methodo_BEGES_decli_07.pdf), categories 1 and 2 and chapter 7. The pages of Légifrance (the French government's official legal database) are in French.
- **Analysis of published plans**: ADEME, ["Bilan GES" dataset](https://data.ademe.fr/datasets/bilan-ges), export of 20 September 2026 (11,869 reports), downloaded on 27 September 2026. Projet Celsius calculation on 1,644 reports published from 24 February 2023 to 17 September 2026 by companies subject to the requirement, under method v5; reduction volume: direct or indirect emissions "expected reduction" fields greater than 0; quantified 2030 target: percentage or tonnage in the section; amount: "€" or "euros" in "actions and resources".
- **CSRD**: [Directive (EU) 2026/470 of 24 February 2026](https://eur-lex.europa.eu/eli/dir/2026/470/oj); [Delegated Regulation (EU) 2026/1563 of 3 July 2026](https://eur-lex.europa.eu/eli/reg_del/2026/1563/oj), EU Official Journal of 21 September 2026, ESRS E1, paragraphs 11 to 13 and application requirements AR 1 to AR 5; Delegated Regulation (EU) 2023/2772, ESRS E1, paragraphs 14 to 17; French Commercial Code, Article L. 232-6-3.
- **CSDDD**: [Directive (EU) 2026/470](https://eur-lex.europa.eu/eli/dir/2026/470/oj), Article 4, point 16 (deletion of Article 22 of Directive (EU) 2024/1760) and recital 47.
- **EmpCo**: [Directive (EU) 2024/825 of 28 February 2024](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32024L0825), Article 1, point 2 b), Article 4 and recital 4; [European Commission questions and answers, September 2026](https://commission.europa.eu/document/download/3c257883-bb2a-4dd9-a6dc-501d587bb34f_en?filename=faq-empowerting-consumers-gtd.pdf), questions 6 and 12; [Bill No. 2518](https://www.assemblee-nationale.fr/dyn/17/dossiers/DLR5L17N53140); French Consumer Code, Articles L. 121-2 and L. 132-2; Paris Judicial Court, 23 October 2025, case No. 22/02955 (press release).
- **Pathway and emission factors**: [Decree No. 2026-636 of 16 July 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000054440907) on carbon budgets and SNBC, Articles 3 and 6; ADEME, [Base Empreinte](https://data.ademe.fr/datasets/base-carboner): natural gas 2022 (0.239 kgCO2e/kWh NCV, including 0.201 from combustion), electricity 2024 (0.0519 kgCO2e/kWh, including 0.035 from production), road diesel B7 (3.1 kgCO2e/l, including 2.49 from combustion), new steel (2,211 kgCO2e/t) and recycled steel (938 kgCO2e/t).
- **Voluntary frameworks**: SBTi, [Corporate Net-Zero Standard](https://sciencebasedtargets.org/net-zero), versions 1.3.1 and 2.0; [ACT initiative](https://actinitiative.org/).
