---
title: "2027 presidential election: which obligations could change"
description: "2027 presidential election: regulation, directive, law or decree, an obligation's legal basis shows what an election can undo, from CSRD to low-emission zones."
canonical: https://projetcelsius.com/en/blog/france-2027-election-environmental-obligations/
author: "Sébastien Pierfederici"
datePublished: 2026-09-03
dateModified: 2026-09-03
language: en
translationOf: https://projetcelsius.com/blog/obligations-environnementales-presidentielle-2027/
---

# 2027 presidential election: which obligations could change

**Author**: Sébastien Pierfederici
**Published**: 2026-09-03
**Section**: Regulation
**Canonical URL**: https://projetcelsius.com/en/blog/france-2027-election-environmental-obligations/
**French original**: https://projetcelsius.com/blog/obligations-environnementales-presidentielle-2027/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> An EU regulation applies whatever the outcome of a national election, whereas a budget-funded grant can be removed in a single Finance Act. PPWR, CSRD, the [BEGES](https://projetcelsius.com/en/blog/beges-france-mandatory-ghg-report/) (France's regulatory greenhouse gas emissions report) and environmental labelling (currently voluntary) therefore do not have the same durability, because **the text underpinning them** is not the same.

## Key takeaways

- **An EU regulation** cannot be undone by a national election
- **CSRD must be transposed before 19 March 2027**, during the election campaign
- **A grant dies without being repealed**: it only needs to go unfunded
- **ETS2 has been postponed to 2028**: EU timelines can slip too

## 4 levels, from the most solid to the most fragile

A text's legal basis shows **what a government can undo and how quickly**. Neither election programmes nor polls tell you this.

### 1. EU regulation: beyond the reach of a national election

A regulation **applies directly in all 27 Member States**, without a transposing law. No French government can suspend it alone: it would have to convince the European Parliament and the Council.

This level includes the [Packaging and Packaging Waste Regulation (PPWR)](https://projetcelsius.com/en/blog/ppwr-timeline-deadlines/), the [Carbon Border Adjustment Mechanism (CBAM)](https://projetcelsius.com/en/blog/cbam-free-allowances-phase-out/), [eco-design under the Ecodesign for Sustainable Products Regulation (ESPR) and its digital passport](https://projetcelsius.com/en/blog/espr-ecodesign-regulation-guide/) and the [Batteries Regulation](https://projetcelsius.com/en/blog/eu-battery-regulation-2023-1542/), which requires a carbon footprint declaration. For these texts, **the EU timetable is your timetable**, whatever the election result.

### 2. Directive: the objective holds, the arrangements are negotiated

A directive sets a result and leaves each Member State to write its own law. National discretion covers **thresholds, penalties and the timetable**.

The [Corporate Sustainability Reporting Directive (CSRD) after the Omnibus](https://projetcelsius.com/en/blog/csrd-2026-who-is-in-scope-after-omnibus/) shows the 2 ends of this discretion. The EU itself raised the thresholds to **1,000 employees and €450 million in turnover**, removing around **80% of the companies** initially covered. And France must transpose it **before 19 March 2027**, a month before the first round.

> **Good to know: an awkward deadline** The government has set the first round for 18 April 2027 and the second for 2 May. The Omnibus must be transposed by 19 March, a month before the first round, during the campaign. Until the French Commercial Code is amended, the new thresholds do not take full effect in French law: a company that has dropped out of the EU scope may remain bound by national law for several months.

### 3. French law: changeable, but not with a stroke of a pen

A law is undone by another law, therefore **by a parliamentary majority**. This is the level at which an election matters most, and the episode involving **low-emission zones** shows that it is still not instantaneous.

Their abolition was approved in April 2026 in the French Law on Simplifying Economic Life, then **struck down on 21 May** by the French Constitutional Council (Decision No 2026-903 DC). The Council considered it a legislative rider unrelated to the text. The relaxation of ZAN (France's zero net land take objective) fell for the same reason, and **25 of the law's 84 articles** were struck down in whole or in part.

No low-emission zone has therefore disappeared. Repeal will require dedicated legislation, which takes parliamentary time.

The ban on renting out energy-inefficient homes belongs to the same level. It targets homes rated **F from 1 January 2028**, after G-rated homes, which have been covered since 2025. It is already the subject of a bill introduced in April 2026, which proposes allowing rentals beyond 2028 in exchange for a commitment to carry out renovation work. It has not been adopted, and **the current rule therefore applies in full**.

### 4. Decree, ministerial order, budget line: the level that changes without warning

This is the most fragile level. A decree is replaced by a decree, and **a grant disappears with the budget funding it**, without going through a dedicated debate.

**MaPrimeRénov' (France's home renovation grant) demonstrated this.** Applications closed on 1 January 2026 because no budget had been approved, then reopened on **23 February**, after the French Finance Act was enacted. For 7 weeks, no application could be submitted, and **not a single line of legislation was repealed**. The scheme still existed, but it was no longer funded.

**The National Low-Carbon Strategy rests on the same legal basis**, with far heavier consequences than a renovation grant. [SNBC-3](https://projetcelsius.com/en/blog/snbc-3-business-obligations/), the third edition of the strategy, was adopted by **Decree No 2026-636 of 16 July 2026**, published in the Journal officiel (the French official gazette) 2 days later. It sets France's carbon budgets in 5-year periods through to 2038, aims to cut territorial emissions by a factor of 2 by 2030 and targets neutrality in 2050.

In other words, **France's climate roadmap rests on a decree**. Another decree can revise it, without going before Parliament. France's Multiannual Energy Programme, published in the Journal officiel in February 2026, falls under the same legal basis. So does the TRACC adaptation pathway (the French reference warming trajectory for climate change adaptation), written into the French Environmental Code by a decree and a ministerial order of 23 January 2026.

> A grant ceases to exist as soon as it goes unfunded, without any text needing to repeal it.

## Where do carbon footprint and life cycle assessment (LCA) obligations fit?

The texts requiring [life cycle assessments and carbon footprints](https://projetcelsius.com/en/blog/lca-vs-carbon-footprint/) span all 4 levels, but differently depending on whether they target a product or a company.

### For products, almost everything is European

A product's footprint is governed by **regulations**, therefore by the first level. [ESPR and the digital passport](https://projetcelsius.com/en/blog/digital-product-passport-explained/) will require environmental data per product. The [Batteries Regulation](https://projetcelsius.com/en/blog/lithium-ion-battery-carbon-footprint/) already requires a carbon footprint declaration. [PPWR](https://projetcelsius.com/en/blog/ppwr-who-is-affected/) sets recycled-content rates, [CBAM](https://projetcelsius.com/en/blog/what-is-cbam/) a price at the border.

There are 2 exceptions that fall under French law: [environmental labelling](https://projetcelsius.com/en/blog/mandatory-environmental-labelling-sectors-dates/), underpinned by France's Climate and Resilience Act and implemented sector by sector, and [building-sector FDES](https://projetcelsius.com/en/blog/fdes-vs-epd-vs-pep/) (the French format of environmental product declaration), linked to RE2020 (France's environmental regulation for new buildings). **These two are the most exposed** points in a product framework that is otherwise very solid.

### For companies, the split is less favourable

The [greenhouse gas emissions report (BEGES)](https://projetcelsius.com/en/blog/beges-france-mandatory-ghg-report/) is a French obligation, included in the Environmental Code and specified by decree. It covers companies with **more than 500 employees**, every 4 years, with [mandatory scope 3](https://projetcelsius.com/en/blog/is-scope-3-reporting-mandatory/) only for companies subject to sustainability reporting, and a fine raised to **€50,000** by France's Green Industry Law. The threshold, reporting frequency and amount can all be changed through Parliament.

Alongside this, [CSRD](https://projetcelsius.com/en/blog/esrs-e1-ghg-inventory-after-omnibus/) and the taxonomy are European. The Low-Carbon Strategy, meanwhile, rests on a decree: it creates no direct obligation for a company, but governs the sectoral policies on which grants, standards and tenders depend.

> A company's obligations also depend on French law, which can change faster than the EU regulations governing products.

## Can the EU timetable shift too?

EU rules are not immutable either, as shown by **ETS2, the EU emissions trading system for buildings and road transport**.

This second carbon market extends **the CO₂ price to building heating and road fuel**. The 2023 directive scheduled it for 2027. The Member States **postponed it by a year**, and the Commission now says it will be fully operational **in 2028**. An EU text is therefore beyond the reach of a national election, but it remains subject to political trade-offs.

In practice, this shifts monitoring: for an EU text, **watch revisions rather than elections**. For a French text, it is the other way round.

## How can you invest without betting on the election?

Before asking whether an obligation will survive, ask **what happens to your investment if it disappears**.

Equipment sized to withstand a summer at +2.7 °C remains useful even if the [adaptation pathway](https://projetcelsius.com/en/blog/pnacc-3-business-adaptation/) changes its name, because **the climate does not vote**. Conversely, a project whose entire profitability depends on a grant renewable each year carries political risk.

These habits hold whatever the 2027 result:

- **Distinguish the obligation from the reason for acting.** A [carbon footprint](https://projetcelsius.com/en/blog/bilan-carbone-method-explained/) helps you decide, as well as declare: its value does not depend on the threshold making it mandatory.
- **Schedule commitments around the most solid level** in the chain. If your plan relies on EU regulation, it stands on solid ground. If it relies on a budget-funded grant, plan an alternative without it.
- **Do not confuse postponement with abandonment.** ETS2 delayed by a year remains a cost to factor in, and postponed [environmental labelling](https://projetcelsius.com/en/blog/france-environmental-labelling-guide/) usually ends up arriving.

Regulatory pressure is only part of the constraint. Clients, banks and insurers require climate data that no election will make optional, particularly on [indirect emissions](https://projetcelsius.com/en/blog/scope-3-emissions-guide/).

## Key takeaways

**Classify your obligations by legal level** before classifying them by deadline. An EU regulation calls for planning, a directive for monitoring at transposition, a law depends on a majority, a grant on a budget.

And keep in mind what the legal basis cannot settle: what a government will want to do. It only tells you what a government **could** do, and how quickly. For the rest, the [obligations arising from the Low-Carbon Strategy](https://projetcelsius.com/en/blog/snbc-3-business-obligations/) and [existing grants](https://projetcelsius.com/en/blog/climate-transition-funding-carbon-footprint-lca/) show the current landscape, to be reviewed after the election.

## Frequently asked questions

### Can an election cancel CSRD for my company?

Not directly. CSRD is an EU directive: a national government can neither repeal it nor withdraw from it alone. A majority can transpose the minimum requirements, delay transposition or reduce penalties. It was the EU itself that reduced the scope most, through the Omnibus.

### Can France suspend PPWR or CBAM?

No. These are directly applicable EU regulations. Their timetable does not depend on French law. Only an EU-level revision can amend them, requiring agreement between the European Parliament and the Council.

### Should you wait until 2027 before committing to renovation work?

Waiting exposes you to 2 opposing risks: losing a grant still open, or committing to work designed around a scheme that changes. The suspension of MaPrimeRénov' while awaiting the 2026 budget shows that uncertainty works both ways. A project that remains profitable without the grant has no reason to wait.

### Have low-emission zones been abolished?

No. Their abolition was approved in April 2026, then struck down in May by the Constitutional Council on procedural grounds. Existing zones remain in force, and repeal would require dedicated legislation.

### How can you tell which level an obligation affecting you belongs to?

Look at the source text cited by your administration or trade association: EU regulation, EU directive, law, decree or order. The word always appears in the reference. It is the best indicator of its lifespan, far more than its stated ambition.

## Sources

- [Decree No 2026-23 of 23 January 2026 on the reference warming trajectory](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000053399130)
- [Decision No 2026-903 DC of 21 May 2026, Constitutional Council](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000054131862)
- [MaPrimeRénov' applications reopen, info.gouv.fr](https://www.info.gouv.fr/actualite/reouverture-de-maprimerenov)
- [Omnibus Directive, thresholds and transposition timetable](https://portail-rse.beta.gouv.fr/csrd/seuils-csrd-omnibus-criteres-d-application/)
- [ETS2, buildings and road transport, European Commission](https://climate.ec.europa.eu/areas-action/carbon-markets/ets2-buildings-road-transport-and-additional-sectors_en)
- [Ban on renting F- and G-rated homes, public service](https://www.service-public.fr/particuliers/vosdroits/F35604)
- [Dates of the 2027 presidential election](https://www.info.gouv.fr/actualite/presidentielle-2027-date-a-retenir-et-informations-cles)
- [SNBC-3 adopted, Ministry of Ecological Transition](https://www.ecologie.gouv.fr/presse/france-adopte-sa-troisieme-strategie-nationale-bas-carbone-feuille-route-ambitieuse)
