---
title: "How do you read an FDES for the RE2020 calculation?\nModules, default data, service life"
description: "Modules A1 to D, default data uplifted by 30 to 100%, service life and replacement, configurators, validity: how to read an FDES for the Ic construction."
canonical: https://projetcelsius.com/en/blog/how-to-read-fdes-re2020/
author: "Sébastien Pierfederici"
datePublished: 2026-05-27
dateModified: 2026-10-17
language: en
translationOf: https://projetcelsius.com/blog/lire-fdes-calcul-re2020-ic-construction-bureau-etudes/
---

# How do you read an FDES for the RE2020 calculation? Modules, default data, service life

**Author**: Sébastien Pierfederici
**Published**: 2026-05-27
**Updated**: 2026-10-17
**Section**: Practical guide
**Canonical URL**: https://projetcelsius.com/en/blog/how-to-read-fdes-re2020/
**French original**: https://projetcelsius.com/blog/lire-fdes-calcul-re2020-ic-construction-bureau-etudes/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> To calculate the **Ic construction**, the carbon indicator of RE2020 (France's environmental regulation for new buildings), an FDES is read through its functional unit, its **reference service life**, its modules A1 to D and its validity date. The RE2020 engine adds up production, installation, maintenance, end of life and module D, then **counts every replacement** over 50 years. Without a declaration, it uses **default data uplifted by 30 to 100%**, and the weight of that data can lower the ceiling from 2028.

## Key takeaways

- **The manufacturer's declaration always takes priority over default data** in the RE2020 calculation.
- **Module D counts** in the carbon indicator for construction (Ic construction) under RE2020.
- **A 25-year service life** doubles the production counted over a 50-year study period.
- **Request the declarations before the contractors are consulted**, and date the list you use.

To insulate an unconverted loft to R = 10, the default data for blown glass wool weighs **10.7 kgCO2e per m²** over its life cycle, excluding module D. The [declaration for a real product](https://base-inies.fr/infos-produit/48917), verified in 2025, states **6.0**. Over 100 m² of loft, **the gap exceeds 470 kgCO2e**, for a single work package.

The gap comes down to how **the calculation engine** reads each declaration: which data it must use, which modules it adds up, how many times it counts a product that is replaced, and what a missing declaration costs. This is what **an engineering consultancy or a quantity surveyor** checks before entering an FDES (the French format of environmental product declaration for construction products) in software for RE2020 (France's environmental regulation for new buildings).

## Which environmental data must the software use?

The [ministerial order of 4 August 2021](https://www.legifrance.gouv.fr/loda/article_lc/LEGIARTI000045581711) sets the rule in its Article 16. Each product enters through **its manufacturer's environmental declaration**, based on a [life cycle assessment](https://projetcelsius.com/en/blog/lca-vs-carbon-footprint/) (LCA): an FDES for a construction product, a PEP (Product Environmental Profile) for an item of equipment. Failing that, the calculation uses **default environmental data** (DED), made available by the Ministry of Ecological Transition. The acronyms are explained in our [guide to EPD, FDES, PEP and LCA](https://projetcelsius.com/en/blog/epd-fdes-pep-lca-differences/).

[Annex II of the order](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/annexeii_arrete_4_aout_2021.pdf) sets out the calculation method and derives from it an **order of priority**:

- Product-specific data for the specified product always takes priority over default data, whether it is an individual declaration, a collective one or one from a configurator.
- **Conservative** product-specific data may cover a product in the same range: the declaration for a 15 mm board applies to the same board in 12 mm, never to 16 mm.
- Without product-specific data, the **default data** must be used, and certain work packages may be entered with the flat-rate values listed in Annex XI of the order.
- Without any data, the component remains described with information flagged as **empty**, and a request to create default data must be filed.

FDES, PEP and default data are found in the INIES database, France's national reference database. It is **free** and listed **5,660 FDES and 1,888 PEP** on 17 October 2026, according to the counter on its website. Each declaration is published there as a PDF, sometimes with **an XML file** that LCA software reads directly, according to the [ministry's FAQ on carbon data](https://rt-re-batiment.developpement-durable.gouv.fr/faq-re2020-112-donnees-carbone-fdes-pep-ded-lots-a780.html).

## What does the calculation do with each module of an FDES?

An FDES in the NF EN 15804+A2 format declares its impacts **module by module**, from A1 to D, for its functional unit. The graphic below shows the table of a real declaration, a 465 mm blown glass wool for unconverted lofts. The RE2020 engine groups these modules into **5 terms**:

- **Production**, modules A1 to A3, often the heaviest: 5.40 kgCO2e of the 5.98 over the life cycle of the declaration shown, as it is for the concrete and steel of a [new building](https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/).
- **The construction process**, modules A4 and A5, meaning transport to the site and installation, including offcuts.
- **The use stage**, modules B1 to B4. Modules B6 and B7, energy and water use, fall under other indicators, and if a declaration does not separate B1 to B4 from B6 and B7, the product's use stage is counted as zero.
- **End of life**, modules C1 to C4, from deconstruction to waste disposal, which is also financed by the [EPR scheme for construction products](https://projetcelsius.com/en/blog/france-epr-construction-products-pmcb/).
- **Module D**, loads and benefits beyond the life cycle, which enters the Ic construction (the RE2020 indicator of the carbon impact of construction products) according to the definition of the indicator.

Annex II of the order adds it to the 4 other terms of the components indicator, and the [annex to Article R. 172-4 of the Construction and Housing Code](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000045292850) confirms it: the assessment of the Ic construction takes into account **the loads and benefits** linked to the recovery of components at end of life. The calculation is then **dynamic**: an emission weighs less the later it occurs. For products still in place at the end of the study period, end of life and module D are **deemed to be emitted at 50 years**.

Only refrigerants are an exception to the use-stage rule. Their leaks keep **a separate calculation**, even where an item of equipment does not separate its B modules, a point that ties in with the [European timetable for refrigerants](https://projetcelsius.com/en/blog/f-gas-regulation-2027-bans/).

## How does the reference service life change the result?

Each declaration states a **reference service life**: 50 years for the glass wool shown above. Annex II compares it with the building's **50-year study period** to calculate a renewal factor, Rp, equal to 50 divided by the service life and never below 1.

- A product with a service life of 50 years or more is installed once: Rp is 1 and its use stage is counted pro rata to the study period.
- A **25-year** product is installed and then replaced once: Rp is 2, and its production, installation and end of life count 2 times, the second installation being lightened by the dynamic calculation.
- A 15-year product gives an Rp of 3.3, unrounded: the calculation adds 2.3 times the production, installation and end of life to the use stage.

By default, the method takes **the service life stated in the declaration**. It prohibits lengthening it and requires any reduction to be justified. This matters for an [eco-design process](https://projetcelsius.com/en/blog/eco-design-process-7-steps/) that relies on durability. A floor covering with a 10-year service life therefore weighs **5 times its production** over the study period, a gap that shows before any comparison between 2 declarations.

> A missing declaration costs more than a mediocre one, because default data is built to overstate.

## Why does default data weigh more?

### A safety coefficient that is always applied

The [procedure for developing default data](https://mdegd.dimn-cstb.fr/reports), published in January 2026 and cited in the ministry's FAQ, **always applies a safety coefficient**. Its level depends on the **data available** for the product family:

- With **a single FDES or PEP** available, the default data takes its values, scaled to the target functional unit, then uplifts them by **100%**.
- With several declarations, it starts from the mean plus 2 or 3 standard deviations, or from the maximum of the sample, then adds **30%**.
- With no declaration at all, it is calculated from generic databases such as ecoinvent, then uplifted by **30%**, and its module D is set to zero.

### Unfavourable service lives and ranges

The service life used is **the shortest in the sample**, and a negative module D is brought back to zero. Default data **covering a range**, for example loose-fill glass wool from R = 5 to R = 10, is calculated for the top of the range. In INIES, the default data for an insulated plasterboard lining in polyurethane from R = 2.5 to 5 is therefore worth **twice** that of the same lining at R = 2.5.

### A penalty from 2028

The annex to Article R. 172-4 tracks this weight in the **Icded indicator**, excluding foundations, roads and photovoltaics. For building permits from 2028, the part of it above a threshold, **370 kgCO2e/m² for a single-family home**, **lowers the ceiling by 30% of the excess**, as our article on the [2028 threshold under RE2020](https://projetcelsius.com/en/blog/re2020-2028-thresholds/) sets out.

## When should you use a configurator or a collective FDES?

A configurator is an online tool that **parameterises an FDES** according to the dimensions or composition of the product ordered. Each model is valid within **a defined scope of validity**. The ministry's [FAQ 112](https://rt-re-batiment.developpement-durable.gouv.fr/faq-re2020-112-donnees-carbone-fdes-pep-ded-lots-a780.html), updated on 6 October 2026, lists those that can be used under RE2020, for example:

- **BETie**, from the ready-mixed concrete trade association, for structural concrete, and several configurators from cement producers or precast manufacturers, limited to their own products.
- **DE-BOIS**, run by CODIFAB (the French timber and furniture industry body), for framed walls, roof structures, cross-laminated timber panels and timber floors, and DE-BoisDeFrance for a list of timber products, from cladding to parquet flooring.
- **BANKIZ**, from URSA, for its glass wool in boards, rolls and blown form, **DE-Baie** and Config'Alu for windows, doors and facades, and about ten tools for external thermal insulation renders, insulation not included.

A **collective FDES** covers the products of several manufacturers in a trade. Since 2022, it must declare **the minimum and maximum values** of its reference indicators, according to the ministry's explanatory notice on environmental declarations. It remains **product-specific data**, with priority over default data. A manufacturer that wants its own declaration, even on a [small budget](https://projetcelsius.com/en/blog/lca-on-a-small-budget/), starts from a [first product LCA](https://projetcelsius.com/en/blog/first-product-lca-steps-cost-mistakes/), published as an [individual FDES](https://projetcelsius.com/en/blog/fdes-vs-epd-vs-pep/) after checking by an [authorised verifier](https://projetcelsius.com/en/blog/fdes-pep-choose-accredited-verifier/), at a cost set out in our article on the [price of an LCA](https://projetcelsius.com/en/blog/lca-cost/).

## Which declaration remains usable until the end of the works?

### The end-of-validity date

Each declaration carries **an end-of-validity date**. The one for the glass wool shown above, verified on 12 June 2025, states **a validity period of 5 years**, to 31 December 2030. The calculation uses only the data **available on the date it is carried out**, under **Article 16** of the order of 4 August 2021.

### Archived data

Archived data is **not necessarily lost** for a project:

- An LCA carried out at the design stage, even before the building permit is filed, may keep until completion the data it used, including data archived or updated since.
- This is **the only case** in which archived data remains usable, states the ministry's [FAQ 222](https://rt-re-batiment.developpement-durable.gouv.fr/faq-re2020-222-puis-je-utiliser-des-donnees-a1247.html), published on 24 September 2026, provided it matches the product installed.
- A study started again from scratch at the end of the works must, by contrast, start from the declarations online on that day, so a product may fall back to its default data.

This is why it pays to **date every calculation** and to archive the list of declarations used. It also helps when dealing with a public buyer that applies an [environmental award criterion](https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/). The [completion certificate](https://projetcelsius.com/en/blog/re2020-which-buildings/) checks that at least 10 input values of the calculation are consistent with what was installed. A reviewer who reopens the model, as in a [critical review](https://projetcelsius.com/en/blog/lca-critical-review-independent-expert/), follows the same [checks as for an LCA calculated in software](https://projetcelsius.com/en/blog/lca-software-verify-results/).

For us at Projet Celsius, the surest gain comes **before the contractors are consulted**: spotting **the work packages entered by default**, asking suppliers for their FDES and freezing the dated list of declarations. We [carry out and review building LCAs](https://projetcelsius.com/en/services/life-cycle-assessment/) on this principle, and the [LCA training course](https://projetcelsius.com/en/training/lca/) that we co-deliver covers the basics, among the [courses on the market](https://projetcelsius.com/en/blog/lca-training-courses-how-to-choose/).

## Key takeaways

- An **FDES or a PEP** always takes priority over default data, which is used only when there is no product-specific data.
- The calculation adds up production, the construction process, the use stage excluding energy and water, end of life and **module D**.
- A reference service life of 25 years makes a product's production **count 2 times** over 50 years.
- Default data is **uplifted by 30% or 100%**, and from 2028 its weight can lower the ceiling.
- A study carried out at the design stage keeps its data, even if archived since, provided you have **dated them**.

To find the threshold that applies to a building, and whether it is covered, see our guide [Which buildings does RE2020 cover?](https://projetcelsius.com/en/blog/re2020-which-buildings/).

## Frequently asked questions

## Frequently asked questions

### Which FDES modules count towards the Ic construction?

Production (A1 to A3), the construction process (A4 and A5), the use stage (B1 to B4), end of life (C1 to C4) and **module D**, under Annex II of the order of 4 August 2021 and the definition of the indicator. Modules B6 and B7, energy and water use, fall under other indicators. The calculation is dynamic: a late emission weighs less.

### What happens if a product has no FDES?

The calculation uses the **default environmental data** for its product family, uplifted by 30% or 100% depending on the declarations available. If no default data exists, the component is declared empty and a request to create it is filed with the ministry. From 2028, a high weight of default data lowers the Ic construction ceiling.

### Does a collective FDES carry the same weight as an individual one?

Both are **product-specific data**, with priority over default data. The collective declaration covers several manufacturers and declares minimum and maximum values. The individual declaration describes a specific product, which may rank better than the average for its trade.

### Can an expired or archived FDES be used?

**Only** if the LCA was carried out at the upstream stage, before or after the permit was filed, with the data available at that time, and if the data match the product installed. This is the only case provided for in the ministry's FAQ 222, published on 24 September 2026. Otherwise the calculation starts again from the declarations online on the day it is carried out.

### How does a product's service life change the Ic construction?

The calculation divides the **50-year** study period by the reference service life in the declaration, with a minimum of 1. A 25-year product therefore counts 2 times its production, installation and end of life. The method prohibits lengthening this service life and requires any reduction to be justified.

### What is an FDES configurator?

An online tool, recognised by the ministry, that produces an **FDES adapted** to the dimensions or composition of a product, within a defined scope of validity. BETie for ready-mixed concrete, DE-BOIS for timber products and DE-Baie for windows and doors are examples. The up-to-date list is in the ministry's FAQ 112.

## Sources

- Order of 4 August 2021 on the energy and environmental performance requirements for building construction in metropolitan France, [consolidated version, Légifrance](https://www.legifrance.gouv.fr/loda/id/JORFTEXT000043936431) (the French government's official legal database), Article 16. The Légifrance pages are in French.
- Ministry of Ecological Transition, RT-RE portal, [Annex II of the order of 4 August 2021, calculation method](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/annexeii_arrete_4_aout_2021.pdf), sections 2.5, 2.6, 4.2.1 and 5.3.
- Construction and Housing Code, [annex to Article R. 172-4](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000045292850), Chapter I (definition of the Ic construction and the Icded) and Chapter III (Mided coefficient).
- Ministry, [RE2020 FAQ 112, carbon data: FDES, PEP, DED, flat-rate work packages](https://rt-re-batiment.developpement-durable.gouv.fr/faq-re2020-112-donnees-carbone-fdes-pep-ded-lots-a780.html), updated on 6 October 2026, and [RE2020 FAQ 222, archived data](https://rt-re-batiment.developpement-durable.gouv.fr/faq-re2020-222-puis-je-utiliser-des-donnees-a1247.html), 24 September 2026.
- CSTB (the French Scientific and Technical Centre for Building) for the ministry, Procedure for developing default environmental data, January 2026, sections 5.4, 5.8 to 5.10, [MLab platform](https://mdegd.dimn-cstb.fr/reports).
- INIES database, [Isolène 4 465 mm FDES, Saint-Gobain Isover](https://base-inies.fr/infos-produit/48917), verified on 12 June 2025, and default data no. 28087, loose-fill glass wool from R = 5 to 10, accessed on 17 October 2026 through the public interface of the database.
- INIES, "Les configurateurs" page (the configurators) and database counter, inies.fr, accessed on 17 October 2026. Ministry, explanatory notice on the texts on environmental data ("Données environnementales"), November 2022.
- Cover photo: Aarni Salomaa, timber and steel structure of the Katajanokan Laituri building in Helsinki, June 2023, Wikimedia Commons, CC BY 4.0.
