---
title: "What is the carbon footprint of a new building?\nDoes renovating emit less?"
description: "New building carbon footprint: a house emits 650 kgCO2e/m² over 50 years under France's RE2020 data. What weighs most, why concrete, renovate or rebuild."
canonical: https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/
author: "Guillaume Pakula"
datePublished: 2026-03-19
dateModified: 2026-10-17
language: en
translationOf: https://projetcelsius.com/blog/cout-carbone-batiment-neuf-re2020/
---

# What is the carbon footprint of a new building? Does renovating emit less?

**Author**: Guillaume Pakula
**Published**: 2026-03-19
**Updated**: 2026-10-17
**Section**: Explained
**Canonical URL**: https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/
**French original**: https://projetcelsius.com/blog/cout-carbone-batiment-neuf-re2020/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> Over 50 years, a new building delivered since 2022 emits a median of **650 kgCO2e per m²** for a house, 880 for an apartment building and **1,030 for offices**, according to the observatory of RE2020, France's environmental regulation for new buildings. Construction accounts for more than 80% of this, far ahead of heating. Concrete weighs heavily because of its cement, and a **low-carbon renovation** can do 30% better than a standard rebuild.

## Key takeaways

- **A new house emits about 650 kgCO2e per m²** over 50 years, of which 9 tenths come from its construction.
- **Structural work, fit-out and equipment** each account for 20 to 41% of construction.
- **Cement accounts for most of the weight of concrete**, and limestone chemistry for most of the weight of cement.
- **A low-carbon renovation beats a standard rebuild**, if it moves away from gas.

Over 50 years, a new house delivered since 2022 emits a median of **650 kgCO2e per m²**, according to the observatory of RE2020 (France's environmental regulation for new buildings). An apartment building emits **880**, an office building **1,030**. For a house of 100 m², that is **65 tonnes**, of which more than 9 in 10 come from its construction rather than its heating.

These figures are no longer expert estimates: since summer 2026, the ministry has been publishing data on more than 100,000 completed buildings. It makes it possible to quantify, item by item, what weighs most in a new building. The regulatory thresholds and the timetable of the [RE2020 life cycle assessment (LCA)](https://projetcelsius.com/en/blog/re2020-which-buildings/) are detailed in our dedicated guide.

## How much does a new building emit over 50 years?

Over 50 years, a new building emits a median of **roughly 600 to 950 kgCO2e per m²** for its construction, depending on use, and **50 to 120 kgCO2e per m²** for its energy. These values come from the Ic construction and Ic energy indicators (the construction and energy carbon impact indicators) of [RE2020](https://projetcelsius.com/en/glossary/re2020/), measured on the buildings as delivered:

- A single-family house emits a median of **596 kgCO2e/m²** for its construction and 54 for its energy, based on 103,657 houses delivered.
- An apartment building emits **682 kgCO2e/m²** for its construction and 118 for its energy, based on 1,927 buildings.
- An office building emits **945 kgCO2e/m²** for its construction and 87 for its energy, based on 1,232 buildings.
- A primary or secondary school emits **902 kgCO2e/m²** for its construction and 80 for its energy, based on 195 buildings.

These medians cannot be added together: in apartment buildings, the total footprint reaches a median of **883 kgCO2e/m²**, because the third of buildings heated by gas pulls the total upwards.

### What the RE2020 observatory counts

The ministry responsible for housing opened this data in summer 2026 together with the CSTB (the French scientific and technical centre for building), and presented it on 3 September 2026. The [observatory dataset](https://www.data.gouv.fr/datasets/opee-observatoire-des-performances-energetiques-et-environnementales-des-batiments-neufs) covers the studies filed **at completion of works**, for permits from 2022 to 2025, extracted on 1 January 2026. We kept the **107,011 new buildings** that meet the observatory's 20 consistency rules, and calculated medians by use.

The figure follows a full [life cycle assessment](https://projetcelsius.com/en/glossary/lca/): product manufacturing, transport, the construction site, maintenance, replacements and end of life, over a **50-year reference period**. It is expressed per m² of living area for housing, and per m² of useful floor area for other uses. Converted into tonnes, the footprint of a 65 m² dwelling heated by a heat pump comes to around **49 tonnes**.

### What the figure leaves out

The regulatory indicator is not the whole [carbon footprint](https://projetcelsius.com/en/glossary/carbon-footprint/) of the building. It excludes the water consumed and discharged, which RE2020 calculates separately, and the share relating to the plot's common developments. It also follows a **simplified dynamic method**: the later an emission occurs in the building's life, the less it counts.

Part of the calculation, finally, rests on **default values** rather than on the declarations of the products as installed. In the observatory data, they account on average for **39% of Ic construction** in housing and 50% in offices. A building's actual figure can therefore differ from its regulatory value, in either direction.

## Why does construction weigh more than heating?

Because a new building uses little energy, and energy that is already low in carbon. In half of the houses delivered, **construction accounts for more than 91%** of the 50-year footprint, excluding water. The share is a median of 83% in apartment buildings and 92% in offices. Cerema (the French public agency for expertise on risks, the environment, mobility and planning) reaches the same order of magnitude, **80% for materials and equipment**, in its [2024 factsheet on the carbon impact of buildings](https://doc.cerema.fr/default/digitalCollection/DigitalCollectionAttachmentDownloadHandler.ashx?documentId=599997&skipWatermark=true&skipCopyright=true).

### A heat pump in 8 out of 10 houses

More than 8 in 10 new houses delivered are heated by a **heat pump**, and their median Ic energy does not exceed 52 kgCO2e/m² over 50 years. Gas heating changes the balance: in apartment buildings delivered, it brings Ic energy to **484 kgCO2e/m²**, against 76 with a heat pump, more than 6 times as much.

A third of the apartment buildings delivered since 2022 are still heated by gas, which the 2022 ceilings tolerated. Their total footprint reaches a median of **1,174 kgCO2e/m²**, more than an office building. Since 2025, the Ic energy ceiling for apartment buildings has effectively ruled out the gas boiler as main heating. Gas then leaves new housing, even as back-up heating, for permits filed from 2027, as our article on [the RE2020 2028 threshold](https://projetcelsius.com/en/blog/re2020-2028-thresholds/) explains. Its price will also rise with the [second European carbon market](https://projetcelsius.com/en/blog/ets2-carbon-price-fuel-heating/).

### A method that counts the present more heavily

Ic construction adds up emissions that occur mostly at the start: extraction, manufacturing and the construction site weigh in from delivery, whereas energy is spread over 50 years. The dynamic weighting of RE2020 widens this gap, since **a tonne emitted in 2070 counts for less** than a tonne emitted at delivery.

> In a new house heated by a heat pump, 50 years of heating weigh less than the facades and windows.

## What weighs most in construction?

No single item dominates. Ic construction is split between **3 groups of similar weight**: structural work, fit-out with the facades, and technical equipment. The Hub des prescripteurs bas carbone (low-carbon specifiers hub) of the IFPEB (the French institute for building performance) speaks of a 1/3 rule for new buildings. Houses delivered follow it closely (34, 28 and 36%); in apartment buildings and offices, structural work weighs slightly more, at around 40%.

The **13 work packages of the method**, whose names appear in the [observatory glossary](https://re-batiment2020.cstb.fr/opee/glossaire), are grouped as follows. Structural work combines roads, foundations, superstructure and roofing. Fit-out combines partitions, facades and joinery, and floor and wall coverings. Equipment ranges from heating to lifts, via electricity.

### Structural work, the largest item in apartment buildings

In apartment buildings, structural work accounts for **41% of Ic construction**, and foundations with superstructure alone for 33%. Foundations weigh more heavily than in a house: 78 kgCO2e/m² on average, against 53, and structural work in the house falls to 34%. The choice of structural material, concrete, timber or mixed, is detailed package by package in our article on [the 2028 tier](https://projetcelsius.com/en/blog/re2020-2028-thresholds/).

Timber brings a second effect, which the carbon stock indicator measures separately. In houses with a solid timber structure, it reaches a median of **49 kg of carbon per m²**, against 11 for a concrete structure. Converted into CO2, that is around 180 kg per m² held in the walls for the life of the building.

### Equipment, as heavy as structural work

In a new house, equipment accounts for **36% of Ic construction**, slightly more than structural work. The reason lies partly in the calculation: the electrical package is worth a median of 98 kgCO2e/m² there, its flat-rate value, for lack of a product declaration. Replacing these flat-rate values with the [Product Environmental Profile (PEP) declarations for the equipment](https://projetcelsius.com/en/blog/epd-fdes-pep-lca-differences/) gives a more accurate footprint, and a lower one when the product does better than the flat rate.

In offices, equipment also rises to **37%**, driven by heating, ventilation and air conditioning. Their refrigerant matters: its choice follows the [European timetable for fluorinated gases](https://projetcelsius.com/en/blog/f-gas-regulation-2027-bans/), and the [impact of air conditioning](https://projetcelsius.com/en/blog/air-conditioning-environmental-impact/) does not stop at its electricity.

## Why does concrete weigh so heavily?

Because of the cement it contains, and more precisely the clinker, the component of cement obtained by firing limestone. According to a [June 2025 note from the Académie des technologies](https://www.academie-technologies.fr/wp-content/uploads/2025/10/062025_ciment_decarbone.pdf) (the French Academy of Technologies), **98% of a concrete's emissions** come from its cement. About two thirds of the houses and apartment buildings that report their structural material, an optional field, are built in concrete.

### Limestone chemistry, before kiln energy

The same note splits cement emissions into 2 sources. Firing the clinker at 1,450 °C produces **40%**, and the decarbonation of limestone, which releases the CO2 contained in the rock, **60%**. This chemical share does not disappear with an electric kiln or with recovered fuels: it is inherent to the material itself.

In France, according to the [May 2023 roadmap of France Ciment](https://www.franceindustrie.org/app/uploads/2023/05/05-2023_CP-FDR-DECARBONATION-ET-NOUVELLE-DENO_VDEF.pdf) (the French cement industry association), the sector emits **10 million tonnes of CO2** a year, two thirds of which are inherent to clinker production. The industry aims for a 50% cut in its emissions as early as 2030. It plans to reduce the clinker content of its cements from 75% in 2021 to 68% in 2030, and to capture 2.4 million tonnes of CO2 a year from 2030.

### Levers for a concrete project

- **Reduce quantities** from the sketch stage, by adjusting slab thickness, the structural grid and the number of basement parking spaces.
- **Specify cements with a lower clinker content**, which standard NF EN 197-5 widened in October 2021.
- **Ask for the declaration of the concrete as delivered**, for example through the BETie configurator of the ready-mixed concrete trade association (SNBPE), listed in the ministry's [RE2020 FAQ no. 112](https://rt-re-batiment.developpement-durable.gouv.fr/donnees-carbone-fdes-pep-ded-lots-a780.html).
- **Combine other materials** where they are structurally viable, timber or mixed timber-concrete, with their carbon storage.

Concrete declarations, known in France as FDES (the French format of environmental product declaration for construction products), are read like those of any product: our guide to [reading an FDES in an engineering consultancy](https://projetcelsius.com/en/blog/how-to-read-fdes-re2020/) shows where to find the impact per m³ and how it enters the calculation. A manufacturer of concrete or precast elements who wants to publish its own, then have it checked by an [approved verifier](https://projetcelsius.com/en/blog/fdes-pep-choose-accredited-verifier/), will find the steps in our guide [FDES, EPD or PEP: which one to publish](https://projetcelsius.com/en/blog/fdes-vs-epd-vs-pep/).

## Is it better to renovate or rebuild?

Renovate, if 3 conditions are met: a **low-carbon renovation** then emits around 30% less than demolition followed by a rebuild to the 2022 standard. Against a rebuild at the 2031 level, the 2 options are within 13% of each other, in favour of renovation for housing and of rebuilding for offices. In a building poorly suited to its new use, rebuilding clearly comes out ahead. This is the conclusion of the [Hub des prescripteurs bas carbone](https://www.ifpeb.fr/wp-content/uploads/2024/05/240528_CP-HUB-BC_Reno-vs-Demol-Reconstruction_Vfinale_V2.pdf), which brings together 90 project owners and project managers, published on 31 May 2024.

The Hub compared, on **3 real buildings**, 4 scenarios cumulated over 50 years: an energy renovation, a low-carbon renovation, and a demolition and rebuild at the 2022 and 2031 levels of RE2020. Its [detailed results](https://www.ifpeb.fr/wp-content/uploads/2024/05/240530_HUB-BC_Renovation_S3_demolition_web.pdf) show the gap case by case:

- For housing, the low-carbon renovation emits **478 kgCO2e/m²**, against 779 for a rebuild at the 2022 level and 552 at the 2031 level.
- For offices, it emits **715 kgCO2e/m²**, against 1,025 and 639 for the 2 rebuilds.
- For heritage offices converted into a retirement residence, it emits **1,208 kgCO2e/m²**, more than the 1,004 of a rebuild at the 2022 level.

### The 3 conditions for a low-carbon renovation

The Hub lists 3. The renovation must cut energy consumption **by at least around 40%**, move away from fossil fuels, and keep as much as possible of the existing building, structure, partitions and utility networks. Without a switch away from gas, the energy renovation of the housing studied reaches 1,150 kgCO2e/m², well above any rebuild. Cutting energy use and moving off gas also bring a building closer to [its CRREM (Carbon Risk Real Estate Monitor) pathway](https://projetcelsius.com/en/blog/crrem-pathway-stranding-risk/), for both energy and carbon.

Renovation keeps an advantage that carbon does not measure: it uses **about half the new materials**, aggregates and sand included. Cerema adds, in its 2024 factsheet, that an optimised renovation can pay back the carbon of its materials **in under 10 years** of avoided consumption.

### When a rebuild makes sense

A building in poor condition, not compact or poorly suited to its new use needs almost as many materials as a new building. This is the case of the retirement residence studied, where a rebuild at the 2031 level emits 37% less than the low-carbon renovation. The Hub recommends **backing every demolition and rebuild request with a comparative LCA**, before the project brief is fixed.

At national level, the stakes show in the use of materials. According to the building decarbonisation roadmap cited by Cerema, **80% of the carbon impact** of construction products came in 2019 from new construction and 20% from renovation.

## How can these figures be used in a project?

The observatory medians serve as a **benchmark before the sketch stage**, step 1 of an [eco-design process](https://projetcelsius.com/en/blog/eco-design-process-7-steps/): they show where an ordinary project stands, and what gap to aim for. For a project owner, the steps are as follows:

- **Place the project** against the medians for its use and the [thresholds for its permit year](https://projetcelsius.com/en/blog/re2020-which-buildings/).
- **Compare renovation and rebuild** before deciding, as soon as a building stands on the site.
- **Settle structure and heating first**, since they make the biggest differences.
- **Replace default values** with the declarations of the products and equipment as specified, in the [INIES database](https://projetcelsius.com/en/glossary/inies/) (the French reference database of environmental declarations for construction products).

For a company, a new building enters its [Bilan Carbone®](https://projetcelsius.com/en/blog/bilan-carbone-method-explained/) (the French carbon accounting method) **under capital goods**, and the [Scope 3](https://projetcelsius.com/en/blog/scope-3-emissions-guide/) of those who build it. Ic construction gives an order of magnitude, calculated with different rules from an organisation-level footprint, as our comparison [LCA or Bilan Carbone®](https://projetcelsius.com/en/blog/lca-vs-carbon-footprint/) explains. A public-sector client can also make it a [criterion in its procurement](https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/), and an owner of tertiary buildings can link it to its obligations under the [Tertiary Decree (Décret Tertiaire)](https://projetcelsius.com/en/blog/france-tertiary-decree-bacs-obligations/) once the building is delivered.

For us at Projet Celsius, the figure that matters most is the one you do not see on the attestation: **the share of default values**. A project showing 650 kgCO2e/m² with 40% of flat-rate values is not managed like a project calculated product by product. We carry out [building LCAs](https://projetcelsius.com/en/services/life-cycle-assessment/) to the EN 15978 standard, to compare a renovation and a rebuild or structural variants, using the [FDES](https://projetcelsius.com/en/glossary/fdes/) of the products under consideration, before the project brief is fixed.

## Key takeaways

- **A new house emits about 650 kgCO2e/m²** over 50 years, an apartment building 880 and an office building 1,030, as medians.
- **Construction accounts for more than 80%** of this footprint: materials and the construction site weigh more than 50 years of electric heating.
- **Structural work, fit-out and equipment** share construction in similar proportions, with no dominant item.
- **Cement accounts for most of the weight of concrete**, and limestone chemistry for most of the weight of cement.
- **A low-carbon renovation does better** than a standard rebuild, if it moves away from gas and keeps the existing structure.

For the obligations that frame these calculations, see our guide to the [RE2020 LCA](https://projetcelsius.com/en/blog/re2020-which-buildings/); for the rest of the timetable, our article on [the 2028 threshold](https://projetcelsius.com/en/blog/re2020-2028-thresholds/).

## Frequently asked questions

## Frequently asked questions

### What is the carbon footprint of a new house?

About 650 kgCO2e per m² over 50 years, as a median, for houses delivered since 2022: 596 for construction and 54 for energy, according to the RE2020 observatory. For a 100 m² house heated by a heat pump, that is about 65 tonnes of CO2e, of which 60 for construction.

### What is the carbon difference between renovating an old building and building a new one?

In 3 real cases studied in 2024 by the Hub des prescripteurs bas carbone, a low-carbon renovation emits around 30% less than demolition and rebuild at the 2022 standard, and about as much as a rebuild at the 2031 level, within 13% depending on the case. To achieve this, it must cut consumption by at least 40%, move away from gas and keep the existing structure. In a building poorly suited to its new use, rebuilding can emit less.

### Why does concrete emit so much CO2?

Because 98% of its emissions come from cement, according to the Académie des technologies. The clinker in cement is obtained by firing limestone at 1,450 °C: firing produces 40% of emissions, and the decarbonation of limestone, which releases the CO2 in the rock, 60%. Cements with a lower clinker content reduce this share.

### Does heating account for much of a new building's footprint?

Little, when it is electric: in a new house heated by a heat pump, energy accounts for around 8% of the 50-year footprint. Gas changes the picture: in apartment buildings delivered since 2022, it brings Ic energy to 484 kgCO2e per m², against 76 with a heat pump. RE2020 has effectively ruled out the gas boiler as main heating in apartment buildings since 2025, and gas is excluded, even as back-up heating, from housing whose permit is filed from 2027.

### What is Ic construction in RE2020?

It is the indicator of the climate change impact of the products, equipment and construction site of a new building, over 50 years, in kgCO2e per m² of living or useful floor area. It covers manufacturing, transport, installation, replacements and end of life. RE2020 sets a ceiling for it that falls in 2025, 2028 and 2031.

### Where can I find the RE2020 observatory data?

On data.gouv.fr (France's open data platform), in the dataset of the observatory of the energy and environmental performance of new buildings (OPEE), opened by the ministry responsible for housing in summer 2026. Version 1.0 covers completed buildings in 4 uses: houses, apartment buildings, offices and education. The CSTB's observatory site also provides statistics.

## Sources

- Ministry of Cities and Housing and CSTB, [observatory of the energy and environmental performance of new buildings, open data v1.0](https://www.data.gouv.fr/datasets/opee-observatoire-des-performances-energetiques-et-environnementales-des-batiments-neufs) (in French), extracted on 1 January 2026, published on 6 August 2026, and main documentation; Projet Celsius processing: completed new buildings meeting the global validation rule, medians and averages by use, by main heating system and by group of work packages.
- Ministry of Cities and Housing, [press release of 3 September 2026](https://www.ecologie.gouv.fr/presse/ministere-ville-du-logement-rend-publiques-donnees-re2020-accompagner-transition) (in French); CSTB, [observatory glossary](https://re-batiment2020.cstb.fr/opee/glossaire) (in French), accessed on 16 October 2026.
- Cerema, [Reducing the carbon impact of buildings](https://doc.cerema.fr/default/digitalCollection/DigitalCollectionAttachmentDownloadHandler.ashx?documentId=599997&skipWatermark=true&skipCopyright=true) (in French), Les essentiels collection, August 2024.
- Hub des prescripteurs bas carbone (IFPEB, with Carbone 4), [press release of 31 May 2024](https://www.ifpeb.fr/wp-content/uploads/2024/05/240528_CP-HUB-BC_Reno-vs-Demol-Reconstruction_Vfinale_V2.pdf) and [slides of the webinar of 30 May 2024](https://www.ifpeb.fr/wp-content/uploads/2024/05/240530_HUB-BC_Renovation_S3_demolition_web.pdf) (in French), scenario 3: renovate and/or demolish and rebuild.
- France Ciment, [press release of 25 May 2023 on the decarbonisation roadmap](https://www.franceindustrie.org/app/uploads/2023/05/05-2023_CP-FDR-DECARBONATION-ET-NOUVELLE-DENO_VDEF.pdf) (in French).
- Académie des technologies, [Is a 100% decarbonised cement possible?](https://www.academie-technologies.fr/wp-content/uploads/2025/10/062025_ciment_decarbone.pdf) (in French), 11 June 2025.
- Ministry of Ecological Transition, [RE2020 FAQ no. 112, carbon data, FDES, PEP, default environmental data (DED) and flat-rate packages](https://rt-re-batiment.developpement-durable.gouv.fr/donnees-carbone-fdes-pep-ded-lots-a780.html) (in French), updated on 6 October 2026.
- Dezeen, [deFlat Kleiburg, Mies van der Rohe Award 2017](https://www.dezeen.com/2017/05/12/mies-van-der-rohe-award-nl-architects-xvw-architectuur-deflat-kleiburg-apartment-block-renovation-housing-estate-amsterdam-netherlands/), 12 May 2017; Wikipedia, [Mjøstårnet](https://en.wikipedia.org/wiki/Mj%C3%B8st%C3%A5rnet), accessed on 17 October 2026.
- Cover photo: Benoît Prieur, construction site on rue de Rossan, Lyon, April 2023, [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Chantier_Rue_de_Rossan_en_avril_2023.JPG), CC0.
