title: "Public contracts: how to meet the environmental criterion"
description: "Since 21 August 2026, a public contract must include an environmental clause and, if scored, a criterion. Bercy recommends weighting it at 10% of the score."
canonical: https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/
author: "Sébastien Pierfederici"
datePublished: 2026-08-20
dateModified: 2026-10-24
language: en
translationOf: https://projetcelsius.com/blog/marche-public-critere-environnemental-repondre/
---

# Public contracts: how to meet the environmental criterion

**Author**: Sébastien Pierfederici
**Published**: 2026-08-20
**Updated**: 2026-10-24
**Section**: Regulation
**Canonical URL**: https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/
**French original**: https://projetcelsius.com/blog/marche-public-critere-environnemental-repondre/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> Since 21 August 2026, the date set by decree for applying Article 35 of France's Climate and Resilience Act, responding to the environmental criterion of a public contract has required bidders to produce verifiable data. Bercy's Legal Affairs Directorate (DAJ) published a practical sheet in July stating what a buyer must require, and above all what it refuses to consider environmental. This article reads it from the perspective of a company bidding for contracts.

## Key takeaways

- Since **21 August 2026**, every public contract includes an environmental clause, and a criterion if scored.
- **Price as the sole criterion is ruled out**: only overall cost incorporating environmental considerations remains.
- **An encouragement clause does not count**: DAJ requires a precise, measurable objective.
- Bercy considers that a weighting of **at least 10% of the score** may be appropriate, to be adapted to the contract.

When the state, a local authority or a hospital buys, it chooses its supplier. The [Climate and Resilience Act](https://www.legifrance.gouv.fr/jorf/article_jo/JORFARTI000043957012) of 22 August 2021 requires that choice to consider the environment. Its **Article 35** writes this into the Public Procurement Code.

Since **21 August 2026**, every tender launched by a public buyer must include an environmental requirement in 2 places: what the contractor must do during the contract, and how bids are scored. If your company sells to a municipality, hospital, region, ministry or social housing provider, your bids are no longer assessed as before.

In July 2026, Bercy, the French Ministry of the Economy, [published a practical sheet](https://www.economie.gouv.fr/daj/considerations-environnementales-et-sociales-dans-les-marches-publics-publication-de-fiches-pratiques-pour-repondre-aux-nouvelles-exigences-de-la) for buyers, deciding case by case what satisfies the obligation and what does not. For a bidding company, it indicates **where points are gained and lost**.

## Clause and criterion: what are the 2 obligations?

> **The vocabulary, in 5 terms** **The tender documents** are the package the buyer publishes to launch its contract. **The bid** is what you propose in response, and **the technical statement** the document explaining how you will deliver the service. **The contractor** is the company winning the contract. Finally, **the concession-granting authority** plays the buyer's role in concession contracts, where the company earns revenue from operating the service rather than from a price paid.

The first is an **environmental performance condition**, under Article L. 2112-2 of the Public Procurement Code. It binds the contractor throughout the contract. The second, the **award criterion**, concerns the bid's environmental characteristics and is used to **score and rank bids**, under Article L. 2152-7. Concessions fall under Articles L. 3114-2 and L. 3124-5.

Confusing the 2 loses you points. "The contractor delivers using electric vehicles" is a **performance condition**. It applies to whoever wins the contract, and therefore distinguishes no one. "The share of the delivery fleet made up of electric vehicles", used to score bids, is an **award criterion**, and determines your ranking. The clause **earns nothing in scoring**; only the criterion **enters the score**.

First check whether the tender documents refer to **general administrative conditions**, a template document the buyer can adopt as it stands. 2 of its clauses can cover part of the obligation: packaging and social inclusion, provided the specific documents detail them. Note that **the packaging clause does not exist in the template for works**: in a works contract, referring to the template covers nothing on the environment. Then examine the specific conditions, where the buyer may depart from the template.

### 3 regimes according to contract value

There are 3 regimes by value, detailed below. The foundation is the **environmental clause**. The **award criterion** is added from the adapted procedure upwards, and the **social clause** appears only above the **EU thresholds**, the amounts from which EU law requires stronger procedures and publicity. In a contract divided into lots, this threshold is **assessed lot by lot**: check your lot's regime, rather than the entire tender's. Thresholds appear in Annex 2 of the Public Procurement Code and are revised every 2 years, so check the value in force on the tender date.

A contract awarded **without publicity or competition** must still include an environmental clause, in 3 forms depending on the case. Below **€25,000 excluding VAT** and without a written document, the buyer must **make every effort** to ensure the service incorporates these objectives, particularly through **overall cost**, which takes account of what the purchase will also cost in use and at end of life. If a quote is drawn up, the clause must appear in the general terms. In all other cases, a written document is mandatory and the clause must be in the contract.

> **Scope** **Defence and security** contracts and concessions are excluded from Article 35. All others are covered, **including intellectual service contracts**, long considered difficult to green.

## Price as the sole criterion has disappeared

Since every contract must include an environmental criterion, **a buyer can no longer award solely on price**. Bercy states this directly. With a sole criterion, **only overall cost** incorporating environmental considerations, or based on life-cycle cost, may be retained: a price extending beyond the invoice amount.

For a company winning contracts by being cheapest, the equation changes. Life-cycle cost includes acquisition, operation, maintenance and end of life. Cheap but energy-intensive equipment **loses out**; a durable, repairable product **can overcome an initial price difference**.

> If the buyer retains only one criterion, it will be overall cost incorporating environmental considerations, or life-cycle cost.

Bercy primarily recommends a **sufficiently high** weighting for the criterion to remain meaningful, and considers that a weighting of **at least 10% of the total score** may be appropriate, to be adapted to the subject of the contract. The practice it discourages places environmental merit as a technical merit sub-criterion at **5%**. The recommended practice makes it a **standalone criterion at 10%**.

## What does not count as an environmental criterion

The document reviews actual wording and determines whether each satisfies Article 35. Several common formulations fail. For a bidder, relying on them means believing it has answered the criterion while **scoring nothing**.

### Encouragement wording is ruled out

A clause stating that "the contractor will favour", "as far as possible" or "if possible" **does not meet the obligation** if it sets neither an objective nor monitoring. The visual below compares wording Bercy **rules out** with wording it **accepts**, clause by clause.

The same reasoning applies to criteria: wording referring generally to the technical statement is ruled out as **too imprecise**. Wording that passes **names the assessment elements** and states **a weighting**.

### Complying with existing regulation is insufficient

Regulation already applying to certain products or operators, independently of the purchasing process, **cannot underpin** a qualifying performance condition. Bercy cites waste sorting rules and rules on plant protection product use. However, **going beyond the legislation** qualifies again, and certain purchasing obligations can be used, such as those in the EGAlim Act for institutional catering or Article 58 of France's AGEC Anti-Waste and Circular Economy Act.

## What evidence can a buyer accept?

An environmental criterion requires **verifiable data**, rather than an intention. The question is what a buyer accepts as evidence.

**Labels recommended by ADEME** (the French Agency for Ecological Transition), including the EU Ecolabel, and their associated evidence meet Article 35 conditions for clauses. Outside these cases, **simply referring to a label is not necessarily sufficient**. The buyer must then check the required label, an equivalent, or evidence attesting to the expected characteristics.

Beyond labels, the data answering an environmental performance criterion most directly remains **life cycle assessment** (LCA). Its form depends on your sector. It may be a [product LCA](https://projetcelsius.com/en/blog/first-product-lca-steps-cost-mistakes/), an [environmental and health declaration or product environmental profile](https://projetcelsius.com/en/blog/fdes-vs-epd-vs-pep/) in construction and equipment, or an [emission factor per product reference](https://projetcelsius.com/en/blog/product-carbon-footprint-lca-pef-cfp/). An organisation's [Bilan Carbone®](https://projetcelsius.com/en/blog/bilan-carbone-method-explained/) (the French carbon accounting method) answers criteria concerning the company rather than the product.

In construction, knowing how to [read an FDES](https://projetcelsius.com/en/blog/how-to-read-fdes-re2020/), the French format of environmental product declaration for construction products, becomes a prerequisite for bidding for a works contract.

A final, rarer route lies in **the contract's subject itself**. When the contract directly targets environmental protection, this qualifies under Article 35 for clauses, with **soil remediation** and [**low-carbon construction**](https://projetcelsius.com/en/blog/re2020-which-buildings/) as examples.

### The improvement plan, provided it is quantified

The **improvement plan** is also recognised as a valid response to the clause obligation, provided implementation and monitoring arrangements are precise. It must set **measurable, realistic** objectives, with indicators such as the share of refurbished products or reduced greenhouse gas emissions.

The benefit for an SME is direct: the improvement plan **does not require data when submitting the bid**. It commits to monitored improvement during performance and becomes contractual. It is an entry route for a company not yet holding an LCA.

### Where to start

Useful work concentrates on 3 points, from least costly to most foundational.

- **Reread your latest technical statements**, separating what answers a performance condition from what answers a scored criterion.
- **Inventory the data you can produce today**: equipment energy consumption, recycled material share, sourcing distance, waste recovery rate. Quantified data is worth more than a general commitment.
- **Decide whether you need a product LCA.** It also serves [environmental labelling](https://projetcelsius.com/en/blog/france-environmental-labelling-guide/), your [customers' scope 3](https://projetcelsius.com/en/blog/scope-3-emissions-guide/) and your clients' [CSRD](https://projetcelsius.com/en/blog/csrd-2026-who-is-in-scope-after-omnibus/) sustainability reporting.

For the budget, the cost of a first [product LCA](https://projetcelsius.com/en/blog/lca-cost/) depends on chain complexity. [Bpifrance's Diag Éco-conception](https://projetcelsius.com/en/blog/climate-transition-funding-carbon-footprint-lca/), an eco-design diagnostic from the French public investment bank, funds **60 to 70%** of it for companies with fewer than 250 employees, including microbusinesses, in all sectors. The amount payable falls to **€5,400 excluding VAT** below 50 employees, **€7,200 excluding VAT** between 50 and 249. For a [Bilan Carbone®](https://projetcelsius.com/en/blog/bilan-carbone-cost-france/), [Diag Décarbon'Action](https://projetcelsius.com/en/blog/diag-decarbonaction-complete-guide/), a Bpifrance-subsidised carbon footprint programme for companies established in France, reduces a fixed price of €10,000 excluding VAT to **€6,000 excluding VAT**. A [low-budget LCA](https://projetcelsius.com/en/blog/lca-on-a-small-budget/) remains possible with a limited scope.

> **Healthcare sector** If you supply healthcare institutions, the regime is identical but volumes are concentrated among a few buyers. The subject is detailed in our [medical device LCA guide](https://projetcelsius.com/en/blog/medical-device-carbon-footprint-lca/) and in [a university hospital's climate strategy](https://projetcelsius.com/en/blog/hospital-carbon-footprint/).

## Key takeaways

Article 35 shifts part of the score from price to environmental data, across **all public contracts** outside defence and security. [SNBC 3](https://projetcelsius.com/en/blog/snbc-3-business-obligations/), France's national low-carbon strategy, creates no direct obligation for companies, but public procurement is one channel through which the national pathway reaches them.

- Article 35 creates **2 distinct obligations**: a performance clause, which is not scored, and an award criterion, which is.
- **Price alone no longer suffices**, and a buyer that retains only one criterion can choose only overall cost or life-cycle cost.
- **Vague commitments are ruled out**, as a clause without a quantified objective or monitoring does not satisfy Article 35.
- **Evidence is prepared beforehand**, whether a recognised label, a life cycle assessment, a product environmental declaration or a quantified improvement plan.

For an industrial SME, this work substantially overlaps with a [decarbonisation diagnostic](https://projetcelsius.com/en/blog/industrial-sme-carbon-footprint-six-months/) or a [greenhouse gas emissions report](https://projetcelsius.com/en/blog/beges-france-mandatory-ghg-report/) if you are subject to one, so data collected once is used several times.

## Frequently asked questions

### From when does Article 35 apply to my bid?

The new obligations cover contracts where a tender has been initiated, or a contract notice sent for publication, since 21 August 2026. A tender launched before this date remains governed by earlier rules until its conclusion. Check the date the notice was sent, rather than the bid submission date.

### Are all contracts covered, even intellectual services?

Yes. The Legal Affairs Directorate specifies that all contracts and concessions are covered, including intellectual services. Only defence and security contracts and concessions are outside the scope. Other situations have a lighter regime, however, particularly purchases without publicity or competition. For intellectual services, the State Purchasing Directorate provides tool sheets with examples of suitable clauses and criteria.

### Does ISO 14001 certification suffice to meet the criterion?

Not automatically. Management system certification concerns the organisation, rather than the bid's environmental performance. It can serve as evidence if the buyer has provided for it, but a criterion concerning a product's environmental characteristics calls for product data. Read the tender rules before assuming general certification will count.

### What if I have no environmental data on my products?

An improvement plan is the fastest route. It meets the environmental clause obligation without requiring data at bid submission, provided it sets precise, measurable objectives monitored during performance. In parallel, begin collecting data on your best-selling product references. Our article on [low-budget LCA](https://projetcelsius.com/en/blog/lca-on-a-small-budget/) details limited scopes that remain admissible.

### Can the buyer still choose the lowest-priced bid?

It can retain price as a criterion, but no longer as the sole criterion, since every contract must now include an environmental criterion. If it wants only one criterion, the Legal Affairs Directorate's sheet states that only overall cost incorporating environmental considerations, or based on life-cycle cost, may be retained.

### What weighting should you expect for the environmental criterion?

There is no regulatory threshold. The Legal Affairs Directorate recommends a sufficiently high weighting for the criterion to remain meaningful, and considers that a minimum of 10% of the total score may be appropriate, to be adapted to the subject of the contract. It also advises separating it from technical merit rather than making it a low-weight sub-criterion. Weighting is not mandatory in the adapted procedure, but displaying it is good practice.

### I have never bid for a public contract. Does that close the door?

No. The environmental criterion concerns what you propose, rather than your public contract history. A first-time bidder starts with the same points as another company on this criterion, provided it supplies quantified, verifiable data rather than a general commitment. Start by reading the tender rules, which state the criteria and weightings, then see what data you can already produce for the product or service concerned.

## Sources

- Legal Affairs Directorate and National Public Procurement Council, July 2026 · Yes/no sheets, Article 35 of the Climate and Resilience Act · [link](https://www.economie.gouv.fr/files/files/directions_services/daj/media-document/Fiches_oui_non_article_35_loi_climat_resilience.pdf)
- Ministry of the Economy, 23 July 2026 · Environmental and social considerations in public contracts and concessions · [link](https://www.economie.gouv.fr/daj/considerations-environnementales-et-sociales-dans-les-marches-publics-publication-de-fiches-pratiques-pour-repondre-aux-nouvelles-exigences-de-la)
- Légifrance (the French government's official legal database) · Article 35 of Act No 2021-1104 of 22 August 2021 on combating climate disruption · [link](https://www.legifrance.gouv.fr/jorf/article_jo/JORFARTI000043957012)
- Légifrance · Public Procurement Code, Articles L. 2111-1, L. 2112-2, L. 2112-2-1 and L. 2152-7 · [link](https://www.legifrance.gouv.fr/codes/texte_lc/LEGITEXT000037701019/)
- State Purchasing Directorate · Tool sheets for environmentally responsible purchasing · [link](https://www.economie.gouv.fr/daj/commande-publique/achats-publics-durables-et-dinnovation/cadre-juridique-et-pratique-de-lachat-durable-pour-tout-type-dachat)