# Which buildings does RE2020 cover? What does its LCA calculate, and when should you do it?

**Author**: Guillaume Pakula
**Published**: 2026-04-20
**Updated**: 2026-10-17
**Section**: Practical guide
**Canonical URL**: https://projetcelsius.com/en/blog/re2020-which-buildings/
**French original**: https://projetcelsius.com/blog/eco-conception-batiment-guide-complet-2026/
**Source**: Projet Celsius (https://projetcelsius.com/en/), a climate strategy consultancy of engineers and PhDs based in Paris and Marseille.

> RE2020, France’s environmental regulation for new buildings, and its **life cycle assessment (LCA)** have applied to new housing since 2022, to offices and schools since July 2022, and since **1 May 2026** to 13 other uses: hotels, shops, restaurants, healthcare, nurseries, universities and industrial buildings. The LCA caps the carbon of materials and energy over **50 years**, with a threshold set by **the year the building permit application is filed**. It is decided at concept design and checked at completion.

## Key takeaways

- **13 tertiary and industrial uses** have been subject to RE2020 since May 2026.
- **The year the permit application is filed** sets the threshold, whatever the date of delivery.
- The life cycle assessment caps only **1 indicator out of 36**, climate.
- **Calculating carbon from concept design** avoids a structure that will not pass.

A block of apartments whose building permit application is filed in 2026 must stay under **650 kgCO2e/m²** on average for its construction, and a hotel under **820 kgCO2e/m²**. This ceiling covers materials, equipment and the building site, over 50 years. The project owner commits to it when the permit application is filed, and a professional checks it at completion.

The **threshold to meet** depends on **the use of the building** and on **the year the permit application is filed**. The following sections cover these 2 criteria, then the calculation itself and the 2 certificates that check it.

## Which buildings does RE2020 cover?

RE2020 targets **new buildings in mainland France**, in **successive waves**. The date that counts is that of the **filing of the building permit application**, or of the prior declaration, whatever the date of the works or of delivery.

### Housing, offices and schools since 2022

[Decree No. 2021-1004 of 29 July 2021](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000043877196), as amended since, brought the first uses into scope **in 4 stages**, according to the [Ministry of Ecological Transition](https://www.ecologie.gouv.fr/politiques-publiques/reglementation-environnementale-re2020) and the RE2020 guide from Cerema, the French public technical expertise body:

- Detached houses and apartment buildings are subject to it for permit applications filed from **1 January 2022**, the regulation’s first wave.
- Offices and primary and secondary education buildings follow for permit applications filed from **1 July 2022**, with their own thresholds.
- Small-area constructions and extensions of these uses come in on **1 January 2023**, with requirements adapted to their small size.
- Temporary constructions of housing, offices or schools, which are exempt from a building permit, come in on **1 July 2023**.

### The 13 uses that came in on 1 May 2026

[Decree No. 2026-16 of 15 January 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000053378848) extends RE2020 to buildings for specific tertiary activities and to buildings for industrial and craft use whose permit application is filed from **1 May 2026**. These 13 uses fall into 4 families:

- **Accommodation and catering** cover hotels of every category and restaurants, including school canteens.
- **Commerce and activity** cover shops, airport terminals, and industrial and craft buildings, whether work there is done in the daytime or in three-shift working (3x8).
- **Health and early childhood** cover healthcare facilities, establishments with accommodation such as medicalised nursing homes, and nurseries.
- **Culture, higher education and sport** cover media libraries, universities, atypical educational buildings, sports facilities and standalone changing rooms.

For a hospital, hotel or factory whose permit application was filed before 1 May 2026, **the RT2012 thermal regulation continues to apply**.

### What remains outside the scope

For these 13 uses, the decree excludes **4 situations**, which the Cerema guide also lists:

- Buildings that must guarantee particular temperature, humidity or air-quality conditions because of their use, such as some process premises.
- Temporary constructions, set up for a period of 2 years or less.
- New constructions and extensions of less than **50 m²**.
- Extensions of less than **150 m²** that also represent less than 30% of the floor area of the existing premises.

**Courthouses and law courts** remain subject to RT2012, as do small extensions of these 13 uses. The **overseas departments** have their own regulation, RTAA DOM. For a project outside the scope, a [voluntary LCA](https://projetcelsius.com/en/services/life-cycle-assessment/) remains possible, with no enforceable threshold.

## What does the RE2020 LCA calculate?

The RE2020 study combines a thermal calculation with an LCA. Under [Article R. 172-4 of the Construction and Housing Code](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000043890801), it checks **6 indicators**, each of them capped:

- The bioclimatic design requirement, known as Bbio, measures in points the heating, cooling and lighting needs that stem from the design of the building fabric.
- Primary energy consumption, total and non-renewable, covers heating, cooling, hot water, lighting, ventilation and lifts.
- [Summer comfort](https://projetcelsius.com/en/blog/air-conditioning-alternatives/) is measured in **degree-hours of discomfort**, the cumulative gap between indoor temperature and a comfort temperature of 26 to 28 °C.
- Ic énergie measures in kgCO2e per m² the climate impact of the energy the building consumes over 50 years.
- Ic construction measures, over the same period, the climate impact of the products, equipment and construction site.

### Ic construction, the core of the LCA

The LCA calculates the impact of **5 contributions**: building components, energy, water, the building site and the plot. The software assesses **36 environmental indicators**, but RE2020 regulates only one, **climate change**. Ic construction adds up **components and the building site**.

According to the [Cerema RE2020 guide](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/2026-09-11_guide-re2020-cerema.pdf) updated in September 2026, components and energy, the 2 together, often account for **around 90% of the impact** of a project. The landscaping of the plot is calculated for information only, except for car parks, which count in Ic construction.

### A dynamic LCA over 50 years

The study period is **50 years** for all buildings. The calculation is described as **dynamic**: an emission weighs less the later it occurs, and the carbon stored in bio-based materials is taken into account. The indicator corresponds to the **cumulative radiative forcing** 100 years after construction. Stored biogenic carbon is shown in addition, for information, in kgC per m².

### Data drawn from the INIES database

Each product enters the calculation through its environmental data: an **FDES** (the French format of environmental product declaration for construction products) for a construction product, a **PEP** (Product Environmental Profile) for an item of equipment, both verified by a third party and available **free of charge in the INIES database** (the French national database of construction product environmental declarations). Failing that, the software uses **default data** supplied by the ministry, whose weight is tracked by a dedicated indicator. Our [guide to reading FDES for the RE2020 calculation](https://projetcelsius.com/en/blog/how-to-read-fdes-re2020/) details what to look for in a declaration.

## Which thresholds must Ic construction respect?

Each use has an **average threshold**, adjusted to the project through modulations: size of dwellings, climate zone, altitude, foundations, roads or photovoltaics. For Ic construction, it falls in tiers according to **the year the permit application is filed**, based on the [consolidated annex to Article R. 172-4](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/chapitre1a3_annexe_r172-4_post-rivaton-i.pdf):

- For detached houses, the threshold goes from **640 kgCO2e/m²** until 2024 to 530 from 2025 to 2027, then 475 from 2028 to 2030 and 415 from 2031.
- For **apartment buildings**, it goes from 740 to 650, then 580 and finally **490 kgCO2e/m²** in 2031, a third lower than in 2022.
- For **offices**, it goes from 980 to 810, then 710 and **600 kgCO2e/m²** in 2031, the steepest fall among the original uses.
- For the uses that came in during 2026, the starting threshold ranges from **800 kgCO2e/m²** for a shop or restaurant to 1,120 for an airport terminal.

High-rise buildings obtained a relaxed tier under [Decree No. 2026-200 of 18 March 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000053703809): **95% of the 2025 threshold** in 2028, then 95% of that value in 2031. The 2028 tier and the gap shown by buildings already delivered are covered in our article on [the RE2020 2028 threshold](https://projetcelsius.com/en/blog/re2020-2028-thresholds/). Like any threshold set by decree, this timetable can still be changed, a risk examined in our article on [the obligations exposed by the 2027 election](https://projetcelsius.com/en/blog/france-2027-election-environmental-obligations/).

### The modulations that adjust the threshold

Some modulations neutralise items that depend mainly on the site. For detached houses, whatever the **foundations** exceed above **40 kgCO2e/m²** is added to the ceiling, as is whatever site roads exceed above 20 and photovoltaics above 20. Default data works the other way: from 2028, when it weighs too much, the ceiling is **lowered by 30% of the excess**.

### The Ic énergie thresholds

Excluding heat networks, Ic énergie has already reached **its final level** for most uses. For apartment buildings, its threshold has fallen from 560 kgCO2e/m² to **260 in 2025**, and it has stayed at 160 for detached houses since 2022. A building connected to a **classified heat network** keeps the 2022 values for a permit application filed before 31 December 2027.

## Who carries out the RE2020 study, and when?

The calculation is entrusted to a **thermal and environmental engineering consultancy**, which uses **software assessed by the ministry**: the energy calculation produces a standardised summary, which the LCA software then takes up to produce its own. These 2 files are then used to generate the certificates on the ministry’s portal.

### At permit application, a first certificate

Drawn up by the project owner, or by the project manager (maître d’œuvre) in charge of design, it is **attached to the building permit application**, under [Articles R. 122-24-1 to R. 122-25 of the Construction and Housing Code](https://www.legifrance.gouv.fr/codes/section_lc/LEGITEXT000006074096/LEGISCTA000043818465/). It certifies compliance with the **Bbio and summer comfort** thresholds and access to natural light. The project owner **undertakes in it to justify a compliant LCA**, on request from the inspection officers, after the works have started.

### At completion, a checked certificate

The second certificate is attached to the **declaration of completion of works**. It is drawn up, **after a site visit**, by one of these professionals:

- A technical inspector or an engineering consultancy approved by the ministry responsible for construction, for all types of building.
- An architect, for all types of building, on the same footing as the technical inspector.
- A body that certifies energy performance and has signed an agreement with the ministry, where the building is being certified.
- An energy performance assessor, qualified to carry out housing diagnostics, but only for detached or attached houses.

This time it checks **all 6 indicators**, on an updated study that must stay under the ceilings for the year the permit application was filed. The professional also checks the consistency of **10 environmental data items** used in the LCA and, depending on the building, the airtightness of the envelope.

### How much does an RE2020 study cost?

**No public price list** exists. For a standard study, the order of magnitude observed in 2026 is **between €3,000 and €10,000 excl. VAT**, varying with the provider and with the size and complexity of the project. The price rises with **the number of work packages** to be entered as specific data rather than flat-rate values, and with design iterations. The cost of a product LCA, on the manufacturer’s side, is detailed in our article on the [price of an LCA](https://projetcelsius.com/en/blog/lca-cost/).

## How can you meet the thresholds from concept design?

The certificate filed with the permit commits the project owner before the LCA is fixed, and the end-of-works study must confirm the thresholds. The choices that matter are therefore made **at concept design**, before **the permit application is filed**, when structure and energy are still open.

**6 levers** can be read directly from the calculation method:

- Decide **the structure first**: this is the work package where the gap between concrete, mixed and timber is widest, according to the observatory analysed in [our article on the 2028 threshold](https://projetcelsius.com/en/blog/re2020-2028-thresholds/).
- Specify [concretes with a reduced clinker content](https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/) and bio-based insulation, whose stored carbon is taken into account by the dynamic LCA.
- Replace **default data** with the FDES and PEP of the products specified, which avoids the 2028 penalty and rewards products that perform better than average.
- Include **reused materials**, which RE2020 counts as having **no impact**, only the products needed to install them still being counted.
- Choose the energy early: the [decree of 12 September 2026](https://projetcelsius.com/en/blog/re2020-2028-thresholds/) excludes gas, even as back-up, except via a heat network, from new housing whose permit application is filed from **1 January 2027**. Public buildings follow in 2028, the others in 2030.
- For a heat pump, factor in the [European timetable for refrigerants](https://projetcelsius.com/en/blog/f-gas-regulation-2027-bans/), which governs the permitted fluids, as soon as the equipment is chosen.

These choices fit with a standard [eco-design approach](https://projetcelsius.com/en/blog/eco-design-process-7-steps/) applied to buildings. They require building material manufacturers to supply **verified data**: an [FDES](https://projetcelsius.com/en/blog/fdes-vs-epd-vs-pep/) checked by an [authorised verifier](https://projetcelsius.com/en/blog/fdes-pep-choose-accredited-verifier/). The acronyms are explained in our [guide to EPD, FDES, PEP and LCA](https://projetcelsius.com/en/blog/epd-fdes-pep-lca-differences/).

> An RE2020 LCA carried out after the permit application is filed can no longer change the structure of the building.

## What if the project falls outside RE2020?

A process building, an overseas project or an extension that is too small have **no enforceable carbon threshold**. Their carbon nonetheless counts in **the project owner’s carbon footprint assessment**, and 3 situations justify a voluntary LCA:

- An industrial company whose process building falls outside RE2020 finds these emissions under capital goods in its [Bilan Carbone®](https://projetcelsius.com/en/blog/industrial-site-carbon-footprint/) (the French carbon accounting method), and can compare 2 variants before choosing.
- A developer or property company must document the footprint of its projects in its [Scope 3](https://projetcelsius.com/en/blog/scope-3-emissions-guide/) and in its [transition plan](https://projetcelsius.com/en/blog/climate-transition-plan-requirements/).
- A public project owner may ask for an LCA as an [environmental award criterion in a public contract](https://projetcelsius.com/en/blog/public-procurement-environmental-criterion-how-to-respond/), including for a building outside the scope.

A voluntary LCA follows the **European standard EN 15978** for assessing buildings, with the same INIES data. It differs from a [company carbon footprint assessment](https://projetcelsius.com/en/blog/lca-vs-carbon-footprint/), which counts the emissions of one year and not those of a structure over its life. Once delivered, a tertiary building of at least 1,000 m² comes within the scope of the [Tertiary Decree](https://projetcelsius.com/en/blog/france-tertiary-decree-bacs-obligations/) (Décret Tertiaire), which tracks its actual consumption, and its future demolition waste falls within the [EPR scheme for construction](https://projetcelsius.com/en/blog/france-epr-construction-products-pmcb/).

For us at Projet Celsius, a common mistake is to treat the RE2020 study as an administrative document for the permit. The certificate filed with the permit application **requires neither Ic construction nor Ic énergie** to be quantified, so a project can start with a structure that will not pass at completion. We recommend calculating **Ic construction from concept design**, against the threshold of the likely filing year, and requesting the FDES for products before the contractor tender.

## Key takeaways

- RE2020 has covered housing since 2022, offices and schools since July 2022, and **13 tertiary and industrial uses** since 1 May 2026.
- **The year the permit application is filed** sets the applicable thresholds, whatever the date of the works or of delivery of the building.
- The regulatory LCA calculates 36 indicators but **caps only one**, climate, through Ic construction and Ic énergie over 50 years.
- For apartment buildings, the Ic construction threshold goes from **740 kgCO2e/m² in 2022 to 490 in 2031**, with a tier every 3 years.
- A certificate **at permit application** and another **at completion**, drawn up by a professional after a site visit, frame the study.

To place the footprint of a new building and the weight of its materials in context, see our article on [the carbon footprint of a new building](https://projetcelsius.com/en/blog/new-building-carbon-footprint-re2020/).

## Frequently asked questions

## Frequently asked questions

### Which buildings does RE2020 apply to?

New buildings in mainland France: housing from **1 January 2022**, offices and schools from **1 July 2022**, and from **1 May 2026** 13 other uses, including hotels, shops, restaurants, healthcare facilities, nurseries, universities and industrial buildings. For these 13 uses, buildings with particular temperature or humidity conditions, constructions lasting 2 years or less and floor areas of less than 50 m² are excluded.

### Is the RE2020 LCA mandatory?

**Yes, for every new building** subject to RE2020. When the permit application is filed, the project owner **undertakes** to be able to justify a compliant life cycle assessment. At completion, a professional certifies, after a site visit, that Ic construction and Ic énergie meet the thresholds for the year the permit application was filed.

### What is Ic construction?

It is the climate change impact **of the products, equipment and construction site** of a building, calculated **over 50 years** by a dynamic LCA and expressed in kgCO2e per m². It must stay under a threshold that depends on the use and the year of the permit, for example **650 kgCO2e/m²** for apartment buildings from 2025 to 2027.

### Who carries out the RE2020 study?

**A thermal and environmental engineering consultancy**, using software assessed by the ministry. The final certificate is drawn up **after a site visit** by a technical inspector, an approved engineering consultancy, an architect, a certification body or, for a house, an energy performance assessor.

### How much does an RE2020 LCA study cost?

**No public price list** exists. For a standard study, the order of magnitude observed in 2026 is **between €3,000 and €10,000 excl. VAT**, varying with the provider, the size of the project and the number of design iterations. Entering specific data rather than flat-rate values takes more time, but often improves the result.

### Does a permit application filed at the end of 2027 fall under the 2028 threshold?

**No.** It is **the year of filing** of the building permit application, or of the prior declaration, that sets the tier. A permit application filed on 31 December 2027 is still judged against the thresholds for 2025 to 2027, even if the building is delivered later. A new permit application filed in 2028, however, is subject to the new tier.

## Sources

- Légifrance (the French government's official legal database), [Decree No. 2026-16 of 15 January 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000053378848), construction of buildings for specific tertiary activities and for industrial and craft use. Consulted on 16 October 2026. The Légifrance pages are in French.
- Légifrance, [Decree No. 2021-1004 of 29 July 2021](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000043877196), energy and environmental performance requirements for the construction of buildings.
- Légifrance, [Decree No. 2026-200 of 18 March 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000053703809), amendment of the requirements, including high-rise buildings.
- Légifrance, [Article R. 172-4](https://www.legifrance.gouv.fr/codes/article_lc/LEGIARTI000043890801) and [Articles R. 122-24-1 to R. 122-25](https://www.legifrance.gouv.fr/codes/section_lc/LEGITEXT000006074096/LEGISCTA000043818465/) of the Construction and Housing Code. Consulted on 16 October 2026.
- Ministry of Ecological Transition, RT-RE portal, [chapters I to III of the annex to Article R. 172-4, consolidated version](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/chapitre1a3_annexe_r172-4_post-rivaton-i.pdf), applicable since 1 July 2026.
- Cerema, [RE 2020 guide, September 2026 version](https://rt-re-batiment.developpement-durable.gouv.fr/IMG/pdf/2026-09-11_guide-re2020-cerema.pdf).
- Légifrance, [Decree No. 2026-863 of 12 September 2026](https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000054834875), environmental performance requirements for heating, cooling and hot water equipment, Article R. 172-14 of the Construction and Housing Code. Consulted on 16 October 2026.
- Ministry of Ecological Transition, [RE2020 environmental regulation](https://www.ecologie.gouv.fr/politiques-publiques/reglementation-environnementale-re2020), page updated on 18 September 2026.
- Cover photo: Sebleouf, building under construction in Dardilly (Rhône), August 2018, [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Dardilly_-_Grue_Liebherr_et_immeuble_en_construction_(ao%C3%BBt_2018).jpg), CC BY-SA 4.0.