As early as possible, ideally at concept design, before detailed design. This is where the major trade-offs (construction system, envelope, energy systems) are made, locking in 70 to 80% of the footprint. After the planning application, room for manoeuvre becomes limited.
Read the source article: RE2020 since May 2026: which buildings are covered?
