When should you engage an eco-design consultancy?

1111 questions from 157 articles available in English.

As early as possible, ideally at concept design, before detailed design. This is where the major trade-offs (construction system, envelope, energy systems) are made, locking in 70 to 80% of the footprint. After the planning application, room for manoeuvre becomes limited.