Database entryUsesLevel 2 of 6 machine operationMachine operation, level 2 of 6Used to calculate 4 entries, level 3Calculated with 1 entry, level 1Database structure

Generate an image

The electricity of an image produced by an open generator, measured on the server's GPU, processor and memory.

  • Selected reference: Standard image, from 512 to 1,024 pixels per side, source Luccioni et al.
  • The electricity range goes from 1.4 Wh to 11 Wh, within the scope of this entry.
  • CO2e is calculated from electricity and the worldwide grid; it is not a direct measurement of carbon.
  • Out of scope: data centre cooling, server manufacturing and model training.
Calculated with
Used to calculate

Origin of the value

The database distinguishes 2 sizes: the standard image, the average of 8 open generators from 2022 and 2023, from 512 to 1,024 pixels per side, and the large image of 4 megapixels, about 4 times more costly.

Comparison with the other machine operations

See the full list
Generate an imagethis entry1.3 gCO2e

Logarithmic axis: each tick is 10 times the previous one.

Characteristics

Unit1 image
Default locationworld, 458 gCO2e/kWh (Ember 2025, life cycle); 11 other locations to choose from
Countedthe server's GPU, processor and memory
Not counteddata centre cooling, server manufacturing and model training
Statusmeasured, 1 reading with the same scope
All the characteristics identifier, version, rule for the value, sources, licence
IdentifierIA-0013, projetcelsius.com/en/ai/database/IA-0013/
Version0.3 of 2 November 2026
CategoryMachine operations, what the server computes
Model sizeStandard image, from 512 to 1,024 pixels per side (1.3 gCO2e), Large image, about 4 megapixels (5.3 gCO2e)
Choice of the selected valuevalue taken as it stands from its source, without calculation
SourcesLuccioni et al., 2024
LicenceCC BY 4.0
Projet Celsius, environmental strategy consultancy

We support companies that account for AI in their Bilan Carbone®