Data centres in France, 2024-2035

Electricity consumed on dedicated sites, RTE range, in TWh per year

Data centres in France, 2024-2035

010203020244 to 5 TWh203010 to 15 TWh203521 to 32 TWh
Source: RTE, Bilan prévisionnel 2025; share: calculation by Projet Celsius. projetcelsius.com/en/ai · CC BY 4.0AI Impact, by Projet Celsius

The analysis

  • In 2035, the high assumption would represent 7% of French consumption in 2025.
  • Projects reserved 18 GW of grid connection in May 2026; at full load all year, that would be 158 TWh, but data centres connected for 2 to 3 years only draw about 20% of the requested power.

The figures

  • The dark part of each bar goes up to RTE's low assumption, the light part up to the high assumption.
  • 2024 : 4 to 5 TWh.
  • 2030 : 10 to 15 TWh.
  • 2035 : 21 to 32 TWh.

Assumptions

  • Data centres on dedicated sites, mainland France.
  • The trajectories depend on the actual pace of grid connections, which RTE revises every year.
  • The shares are calculated on 2025 consumption, so that the 3 years remain comparable; French consumption will have changed by then.

Published on 20 October 2026MethodologyAll sourcesLicence CC BY 4.0

A question about a figure?

An error, a source to add, a methodology question, a press request: write to us. Guillaume Pakula, Clément Reynaud, Sébastien Pierfederici and Alexandre Veilly will reply.

Write to us →

Projet Celsius, which runs this hub, also helps companies measure and reduce the footprint of their AI use.

Accounting for AI in your Bilan Carbone® ↗
Projet Celsius, environmental strategy consultancy

We support companies that account for AI in their Bilan Carbone®

Visiter Projet Celsius ↗