Key figureElectricityUpdated on 20 October 2026

945TWh

Data centre electricity in 2030, baseline scenario

World · 2030 · IEA base case scenario

It is a scenario, not a forecast, and it covers all data centre uses.

See the source
An Azure data centre campus in Washington State, with plots being levelled, seen from the air
An Azure data centre campus under construction, in Washington State. Photo Tedder, Wikimedia Commons, CC BY 4.0

Definition and scope

Electricity that data centres worldwide would consume in 2030 in the IEA base case scenario, a little more than Japan's current consumption.

What is included

  • All data centres, all uses
  • Servers, cooling and site equipment

What is excluded

  • Devices and telecommunication networks
  • Equipment manufacturing

How the value is obtained

IEA projection based on expected demand for accelerated servers, their efficiency and announced projects.

Limits and uncertainties

  • The IEA also publishes higher and lower scenarios.
  • The share of AI in the 945 TWh is not a single value.

945 TWh, worldwide

All figures
All electricity consumed worldwide, 2030 forecast33,594 TWh
The same bar, from 0 to 1,000 TWh
Data centres, in 2024IEA estimate415All of France, over a yearRTE, Bilan électrique 2025451Data centres, in 2030this figure, base case scenario (IEA)945
In TWh. World: IEA, Electricity 2026, forecast; data centres: IEA, Energy and AI, 2025; France: RTE, 2025

The other published estimates

The chart and its sources

The chart "Electricity use of data centres in 2030, according to 3 studies" compares 3 estimates of the same quantity. This entry uses 945 TWh (status: base case scenario). The differences stem first from what each one counts.

  1. IEAAll data centres, excluding cryptocurrencies945 TWhSelected value
  2. GreenITAI infrastructure alone (servers, storage, network)1,169 TWh1.2 times more
  3. The Shift ProjectAll data centres, including cryptocurrencies1,250 to 1,500 TWh1.2 to 1.5 times more

Electricity use of data centres in 2030, according to 3 studies

Data centre electricity consumption in 2030, in TWh per year, projection published by each study

2023 to 2030

The 3 projections do not count the same thing: the IEA takes all data centres excluding cryptocurrencies, The Shift Project adds them, GreenIT keeps only AI.

05001,0001,500TWh per year, in 2030IEAall data centres,excluding cryptocurrencies945 TWhrange: 833 to 1,008The Shift Projectdata centres andcryptocurrencies1,250 to 1,500 TWhrange, no central value1.3 to 1.6 timesthe Shift Project also counts cryptocurrenciesGreenITthe AI server fleet1,169 TWhAI alone (GreenIT) aboveall data centres (IEA)servers assumed to run at 69% all yearIn 2025: 485 TWha little more than France
Source: IEA, 2026; The Shift Project, 2025; GreenIT, 2026 · projetcelsius.com/en/ai · CC BY 4.0AI Impactby Projet Celsius

Update history

The hub changelog
First version of the entry

A question about a figure?

An error, a source to add, a methodology question, a press request: write to us. Guillaume Pakula, Clément Reynaud, Sébastien Pierfederici and Alexandre Veilly will reply.

Write to us →

Projet Celsius, which runs this hub, also helps companies measure and reduce the footprint of their AI use.

Accounting for AI in your Bilan Carbone® ↗
Projet Celsius, environmental strategy consultancy

We support companies that account for AI in their Bilan Carbone®

Visiter Projet Celsius ↗