Database entryElectricitypublished as isOutside the levels infrastructureInfrastructure, outside the levelsInfrastructure18 entriesFigures published by others, reproduced as they are; they cut across the territories without adding to them.Database structure

AI in data centres, world

The share of data centre electricity used to train and run AI models.

  • Selected reference: In 2025, source Projet Celsius.
  • The electricity range runs from 100 TWh to 170 TWh, within the scope of this entry.
  • Out of scope: the rest of the data centres and hardware manufacturing.

Origin of the value

A range, because each estimate draws the boundary of AI in a different place and operators do not publish theirs.

Characteristics

Unit1 year
Locationnot applicable: a published total does not depend on the location of the servers
Countedthe servers that train and run models, with their share of storage, network and cooling
Not countedthe rest of the data centres and hardware manufacturing
Statuspublished, 3 readings of the same scope, 2 other published values
All the characteristics identifier, version, rule for the value, sources, licence
IdentifierIA-0102, projetcelsius.com/en/ai/database/IA-0102/
Version0.3 of 2 November 2026
CategoryInfrastructure, published as is
Year2025 (100 to 174 TWh)
Choice of the selected valuevalue taken as it stands from its source, without calculation
SourcesProjet Celsius, The Shift Project, GreenIT, 2025 to 2026
LicenceCC BY 4.0