Electricitypublished as isOutside the levels infrastructureInfrastructure, outside the levelsInfrastructure18 entriesFigures published by others, reproduced as they are; they cut across the territories without adding to them.Database structure Data centres, France
The electricity of data centres installed in France on dedicated sites, and RTE's projections.
- Selected reference: In 2024, source Projet Celsius.
- The electricity range runs from 4 TWh to 5 TWh, within the scope of this entry.
- This total covers all uses of data centres; it does not measure AI's share alone.
- Out of scope: companies' internal server rooms, devices and telecommunication networks.
Sentence to citeData centres, France: from 4 TWh to 5 TWh of electricity.
Origin of the value
In 2035, consumption would be 5 to 7 times that of 2024, depending on the scenario.
Characteristics
| Unit | 1 year : in 2024 |
|---|---|
| Location | not applicable: a published total does not depend on the location of the servers |
| Counted | data centres on dedicated sites, connected to the grid |
| Not counted | companies' internal server rooms, devices and telecommunication networks |
| Status | published, 4 readings of the same scope |
All the characteristics
| Identifier | IA-0101, projetcelsius.com/en/ai/database/IA-0101/ |
|---|---|
| Version | 0.3 of 2 November 2026 |
| Category | Infrastructure, published as is |
| Year | 2024 (4 to 5 TWh), 2030, projection (10 to 15 TWh), 2035, projection (21 to 32 TWh) |
| Choice of the selected value | value taken as it stands from its source, without calculation |
| Sources | Projet Celsius, RTE, 2025 to 2026 |
| Licence | CC BY 4.0 |
Result for the chosen case
Sources of the calculation
1 publication, for this entry and those used to calculate it, with the chosen parameters.
Energy and factors
The references of the selected values and of the entries used in this calculation.
Projet Celsius · October 2026
Les centres de données en France, 2024 à 2035
Role and limits : Projet Celsius
Author. Projet Celsius, synthesis of public sources
Reading by the database. Published ranges
synthesis of the estimates published by RTE, Schneider Electric and GreenIT, taken up in the entry's records
Reference of the variant "In 2024"
Scope of the figure used. France, 2024, then projections 2030 and 2035
Limit. A range, for lack of a published national measurement
Published values
5 figures for the same quantity, each in its own scope.
Electricity
| Source | Date | Electricity | What the figure measures | Scope | Status |
|---|---|---|---|---|---|
| RTE, Bilan prévisionnel 2025 ↗Bilan prévisionnel 2025, consumption | Dec. 2025 | 4 TWh to 5 TWh | France, 2024, data centres on dedicated sites, excluding internal server rooms | same scope | estimated |
| RTE, Bilan prévisionnel 2025 ↗Bilan prévisionnel 2025, consumption | Dec. 2025 | 10 TWh to 15 TWh | France, projection for 2030, dedicated sites: 10 TWh if 30% of projects are completed, 15 TWh if 60% are completed | same scope | estimated |
| RTE, Bilan prévisionnel 2025 ↗Bilan prévisionnel 2025, consumption | Dec. 2025 | 21 TWh to 32 TWh | France, projection for 2035, dedicated sites, according to RTE's two decarbonisation scenarios | same scope | estimated |
| Database checks and calculations | |||||
| Projet Celsius, synthesis of published estimatesLes centres de données en France, 2024 à 2035 | 2026 | 4 TWh to 5 TWh | France, 2024, then projections 2030 and 2035 | same scope | estimated |
Water
| Source | Date | Water | What the figure measures | Scope | Status |
|---|---|---|---|---|---|
| Arcep ↗Intelligence artificielle et environnement | May 2026 | 6,500 Mm³ | France, 2024, water withdrawn or consumed by the data centres of the operators surveyed by Arcep | other scope | published |
The published figures do not all count the same scope; the scope of each figure is written next to it. Why do the estimates diverge?
Methodology conventions
With their alternatives
| The rule | a published total is reproduced as is, with its year and scope; it is not converted with an average factor and does not add to the database's calculations |
|---|---|
| Calculate a case without an entry | The formula, the default values and a step-by-step example |
Uses in the hub
Charts, figures, analyses and articles that cite this entry
History
Entry in version 0.3 of 2 November 2026, in the database in version 0.4
- 2 November 2026Designation : Data centres in France becomes Data centres, France, 2024.More precise designation: the object first, the specification after the comma, the quantity or period at the end; the former title remains searchable.
- 2 November 2026Designation : Data centres, France, 2024 becomes Data centres, France.The year becomes a variant, and leaves the name.
- 2 November 2026Address : centres-de-donnees-france-2024 becomes centres-de-donnees-france.The year leaves the address; keep the old one in the redirects.
- 31 October 2026Creation of the database, in its first version (0.1).

6Territories
5Organisations
4Occupations and activities
3Uses
2Machine operations
1Calculation factors














