Data centre overhead (PUE)

What the building adds to the electricity of the servers.

  • For each kilowatt-hour consumed by the servers, the data centre consumes 1.1 in total.
  • The factor covers the cooling and the electrical losses of the building.
  • Out of scope: the construction of the building and the manufacturing of the machines.
Used to calculate

Origin of the value

Cooling, power supply, losses. The database selects × 1.10, the Watershed default for a large operator; for an unknown operator, Watershed selects × 1.56. The readings range from 1.08 to 1.52.

Characteristics

Unitfactor
Countedthe cooling and the electrical losses of the building
Not countedthe construction of the building and the manufacturing of the machines
Statusconvention, 7 readings of the same scope, 1 other published value
All the characteristics identifier, version, rule for the value, sources, licence
IdentifierIA-0003, projetcelsius.com/en/ai/database/IA-0003/
Version0.3 of 2 November 2026
CategoryCalculation factors, the foundation of the calculation
Choice of the selected valuewritten convention, with its alternatives (methodology)
SourcesWatershed, Uptime Institute, IEA, Google, Microsoft, Meta and 1 other, 2025 to 2026
LicenceCC BY 4.0
Projet Celsius, environmental strategy consultancy

We support companies that account for AI in their Bilan Carbone®

Visiter Projet Celsius ↗