AnalysisElectricity19 November 2026

Does bitcoin use more electricity than AI?

The 2 curves in terawatt-hours per year, from 2023 to 2030, with what each one counts, and the mining sites leased to AI

By Guillaume Pakula and Clément Reynaud
Published on 19 November 2026 · 12 min read
A narrow aisle between 2 walls of bitcoin mining machines stacked on shelves, bristling with yellow cables and fans

Argo Blockchain mining machines in Mirabel, Quebec, in August 2018. Photo MikeBogosian, CC BY-SA 4.0, cropped, via Wikimedia Commons.

In 2024, bitcoin mining consumed 2 to 3 times more electricity than AI: from 137 to 183 TWh per year according to the University of Cambridge, against about 62 TWh for AI servers. In 2025, the 2 figures are of the same order, with AI at 100 to 174 TWh according to published estimates, and the curves cross in 2025 or 2026, by our reading. For 2030, the International Energy Agency sees AI-focused data centres at 465 TWh, about 2.5 times bitcoin at the end of 2024. Part of this growth is settling on former mining sites.

Contents

Put in the same unit, the terawatt-hour (TWh) per year, the 2 curves read as follows. The bitcoin network consumed about 120 TWh in 2023, then from 137 to 183 TWh per year over the course of 2024, according to the University of Cambridge index. AI, which no statistic separates from the rest of data centres, would have consumed about 62 TWh in 2024 and 100 to 174 TWh in 2025, according to the estimates the hub uses. The next chart shows where they meet: in 2025 or in 2026, depending on the AI estimate used.

Infographic titled "Does bitcoin use more electricity than AI?", in TWh per year, worldwide, from 2023 to 2030. Answer: yes in 2024, 2 to 3 times more; the curves cross in 2025 or 2026, because AI follows the chips shipped, which keep multiplying, and bitcoin the profitability of mining. Bitcoin, in green, with a photo of an aisle of mining machines: 120 TWh in 2023 (range 67 to 240), 137 in mid-2024, 183 at the end of 2024, then a grey line with no value, "2025 value not verified". AI, in yellow, with a photo of a GPU server board: about 62 TWh in 2024 for AI servers, 100 to 174 in 2025 according to estimates, then a hatched cone up to 465 TWh in 2030, a projection for AI data centres; chip shipments multiplied by 2.2 by 2030. A dotted line marks all of France, 451 TWh in 2025, and a pale band the crossover period, 2025 and 2026.
Bitcoin is the central estimate of the Cambridge index: 120 TWh in 2023 (range 67 to 240), then the network's annualised rate on 30 June and 31 December 2024; no 2025 value has been checked against its source. AI in 2024 is our calculation from the IEA: accelerated servers, 15% of 415 TWh, excluding cooling. 2025 is the range of published estimates; 2030, the IEA projection for AI-focused data centres. The hatched cone has no intermediate value.Sources: University of Cambridge, 2025; EIA, 2024; IEA, 2025 and 2026; Schneider Electric and Shift Project, 2025; GreenIT, 2026; RTE, 2026; Projet Celsius calculation. Photos: Argo Blockchain mining machines in Mirabel (Quebec), MikeBogosian, CC BY-SA 4.0, cropped; Nvidia HGX B200 board, Pokiiri, CC BY-SA 4.0, cropped; via Wikimedia Commons. Infographic by Projet Celsius, CC BY 4.0, except the photos, which keep their own licence.
1.

In 2024, bitcoin mining consumed 2 to 3 times more than AI

The Cambridge index (CBECI) serves as the reference for bitcoin; the IEA and the US Energy Information Administration take it up. For 2023, it estimates 120 TWh, within a range of 67 to 240 TWh, or 0.2 to 0.9% of world electricity demand (EIA). On 30 June 2024, the network was running at 137 TWh per year, and a survey of 49 mining companies, which account for nearly half of the network's computing power, gave 138 TWh, about 0.54% of the world's electricity (Cambridge report, April 2025). At the end of December, the network's computing power had grown by a further 42% and consumption reached 183 TWh per year, despite more efficient machines.

For AI, no statistic exists. The IEA takes accelerated servers as its indicator, those that carry graphics cards (GPUs) or equivalent chips: they made up 15% of data centre consumption in 2024, out of 415 TWh (Energy and AI). That makes environ 62 TWh (our calculation), 2 to 3 times less than bitcoin in the same year. The next table brings together the values of the 2 curves with what each one counts; the carbon footprint of bitcoin per euro invested is covered on our blog.

ScopeValueDateSource
Bitcoin, whole network, sites included120 TWh (67 to 240)2023Cambridge, taken up by the EIA
Bitcoin, annualised network rate137 TWh30 June 2024Cambridge
Bitcoin, annualised network rate183 TWh31 December 2024Cambridge
All cryptocurrencies110 TWh, then about 125 TWh2022, 2023IEA
AI, accelerated servers onlyenviron 62 TWh2024our calculation from the IEA
AI, published estimates100 to 174 TWh2025Schneider Electric, GreenIT
AI-focused data centres, projection465 TWh2030IEA

An annualised rate is the consumption of a year at the level of the day indicated, not the average of the calendar year. The IEA figures for cryptocurrencies include bitcoin and the other mined currencies.

2.

The 2 curves cross in 2025 or 2026

In 2025, AI consumed 100 to 174 TWh according to published estimates: the lowest comes from Schneider Electric, taken up by the Shift Project, the highest from GreenIT. The IEA does not publish a value for AI alone in 2025, but it writes that the consumption of AI-focused data centres rose by 50% over the year (Key Questions on Energy and AI).

For bitcoin, we could not check a 2025 value at its source. The last point published by Cambridge, 183 TWh per year at the end of 2024, is enough to locate the crossover: with the low estimate, AI stays below bitcoin in 2025; with the high one, 174 TWh, it comes within 5% of it. The curves therefore cross in 2025 or in 2026, depending on the AI estimate used (our deduction). At this scale, the 2 each consume about a third of the electricity of France, 451 TWh in 2025.

In 2030, AI would consume about 2.5 times bitcoin at the end of 2024

For 2030, the IEA projects 465 TWh for AI-focused data centres, in its base case, half of the 945 TWh of all data centres. That is about 2.5 times the bitcoin rate at the end of 2024 (our calculation). For bitcoin, the only projection checked is the IEA's, published in January 2024: about 160 TWh in 2026 for all cryptocurrencies (Electricity 2024). Bitcoin alone had already exceeded it at the end of 2024. The IEA reports of 2026 no longer cover cryptocurrencies.

Electricity per year: bitcoin at the end of 2024 and AI-focused data centres in 2030
Bitcoin, end of 2024183 TWhper year, network rate on 31 December 2024
  • whole network, mining sites included
  • University of Cambridge estimate
× 2.5
AI-focused data centres, 2030465 TWhper year, projection
  • IEA base case
  • data centres dominated by accelerator servers
3.

The 2 figures do not measure the same thing

The bitcoin figure comes from a model. Its methodology starts from the network's computing power, known at all times, and assumes that miners use only machines that are profitable at the electricity price. The low bound takes the most efficient machines and sites with almost no losses (power usage effectiveness, or PUE, of 1.01); the high bound, the least efficient machines that are still profitable and a PUE of 1.20. The figure covers the whole network, including the cooling of the sites.

The AI figure has no equivalent. Operators do not publish what their servers devote to AI, and each estimate draws the line elsewhere, as set out in the Database entry on AI in data centres :

  • accelerated servers (IEA, 2024): the servers alone, without cooling, some of which do scientific computing and not AI;
  • AI-focused data centres (IEA, 2025 and 2030): whole data centres, where these servers dominate;
  • the AI server fleet (GreenIT, 2025): about 13 million GPUs, assumed to be used at 69% of their capacity all year.

What drives the rise of the 2 curves

The 2 curves do not rise for the same reasons. Bitcoin's consumption does not depend on the number of transactions: according to Cambridge's method, it follows the computing power that miners judge profitable to commit, and therefore the bitcoin price, the electricity price and the efficiency of the machines. AI's consumption follows the number of servers shipped and their use: the IEA bases its projection on shipments of accelerator chips, which it sees multiplying by 2.2 from 2025 to 2030.

4.

Mining sites are being leased to AI

According to the Cambridge report, miners have what AI is looking for: experience of large computing centres, electricity contracts already signed and sites that adapt faster than new ones can be built. In June 2024, they still devoted almost everything to bitcoin: 98.5% of the power reported by the miners surveyed, against 0.46% to high-performance computing. The block reward had just been divided by 2, in April 2024, for the 4th time. The same report puts a figure on the gap that is pushing the change:

  • a megawatt-hour earns $80 to $151 in mining, $120 to $400 in AI server hosting and $1,600 to $4,000 when the company sells the computing itself;
  • it requires an investment of $0.24 to $1.2 million per megawatt in mining, $9 million in hosting and $40 million in computing sold.
Aerial view of a bitcoin mining site: dozens of metal containers lined up on gravel, connected to transformers, next to a car park
The Hut 8 mining site at Medicine Hat, Alberta, in October 2018: containers of machines each connected to its own transformer. These are the connections that AI is coming for.Photo Curtis Huisman for Hut 8, CC BY 4.0, cropped, via Wikimedia Commons.

At Lake Mariner, 83% of revenue already comes from computing rental

TeraWulf mines bitcoin at its Lake Mariner site in New York State, where it signed in August 2025 2 contracts of 10 years with Fluidstack, a computing provider for AI: more than 200 MW of IT load, for about $3.7 billion, of which Google guarantees $1.8 billion in rent. In the 3rd quarter of 2026, this rental made up 83% of its revenue, with 102 MW leased and 336 MW under construction; the company writes that part of its mining infrastructure is being repurposed.

For the 2 curves, the consequence is simple: a repurposed megawatt moves from the bitcoin column to the AI column, and it does not disappear. Bitcoin's consumption, for its part, falls only if the network's computing power falls, which depends on the miners that remain active, wherever they are.

5.

Our view

The comparison gives the right order of magnitude: in 2025, bitcoin and AI each consume about a third of the electricity of France. What separates them is the trajectory. Bitcoin's follows its price and the efficiency of the machines; AI's follows the servers shipped, and the IEA sees it more than tripling by 2030, partly on sites that mining frees up. Our analysis of the French grid shows that the question also arises in terms of power and location, and our comparison with aviation puts it in terms of CO2. Faced with a figure that pits bitcoin against AI, ask 3 questions:

  1. is AI counted in servers, in whole data centres or in the installed fleet?
  2. is bitcoin an annual average or a rate on a given date?
  3. is the year estimated after the fact or projected?
Caveat

Bitcoin is given as an annualised rate at 2 dates in 2024, AI as estimates for a year or as a projection, with different scopes: the crossover is dated to within 1 year. The IEA figures for cryptocurrencies count all of them, bitcoin included.

Guillaume Pakula
The authorsGuillaume PakulaEditorial director of AI Impact

He holds a doctorate from École polytechnique and an engineering degree from ESPCI Paris, and co-founded Projet Celsius, which he chairs. He is a lead trainer in Bilan Carbone® and life cycle assessment at the Institut de Formation Carbone.

His page and articles →Contact him →LinkedIn ↗
École polytechniqueInstitut de Formation CarboneProjet Celsius
Clément Reynaud
Clément ReynaudCo-founder of Projet Celsius

He holds a PhD in nanophysics from Aix-Marseille Université and an engineering degree from the Institut d'Optique, and co-founded Projet Celsius, where he heads the Marseille office.

His page and articles →Contact him →LinkedIn ↗
The AI Impact monthly newsletterWritten by Guillaume, Clément, Sébastien and Alexandre. New figures, explained and discussed.

Sources

10 documents

Every figure was read in its source; the hub's methodology is described in Methodology and sources.

Cite this analysis

Guillaume Pakula and Clément Reynaud, Does bitcoin use more electricity than AI?, AI Impact, Projet Celsius, 19 November 2026. https://projetcelsius.com/en/ai/analyses/bitcoin-vs-ai-electricity/

You may also like

The 17 pieces in this topic →

A question about a figure?

An error, a source to add, a methodology question, a press request: write to us. Guillaume Pakula, Clément Reynaud, Sébastien Pierfederici and Alexandre Veilly will reply.

Write to us →

Projet Celsius, which runs this hub, also helps companies measure and reduce the footprint of their AI use.

Accounting for AI in your Bilan Carbone® ↗
Projet Celsius, environmental strategy consultancy

We support companies that account for AI in their Bilan Carbone®

Visit Projet Celsius ↗