AnalysisElectricity18 November 2026

Fouju data center: how much electricity and water will it use?

The Campus IA project in Seine-et-Marne, read in its impact assessment, the opinion of the environmental authority and the orders of 29 July 2026

By Clément Reynaud and Sébastien Pierfederici
Published on 18 November 2026 · 13 min read
The entrance to the village of Fouju, in Seine-et-Marne, on departmental road 57: the village sign, houses and a field, in October 2015

The entrance to the village of Fouju, in October 2015. The Campus IA project is being built on 89 hectares of the commune's farmland, at the place called Les Bordes. Photo Cyrille Largillier, CC BY-SA 4.0, via Wikimedia Commons.

At full power, the data centre campus planned at Fouju, in Seine-et-Marne, would consume about 10.5 TWh of electricity a year according to the environmental authority, as much as 16% of the consumption of Île-de-France and 2.3% of that of France in 2025. It is due to ramp up until 2038, and its actual consumption will depend on the share of its power that it draws: at the average rate RTE measures today, 22%, it would be about 2.7 TWh. Air-cooled, it will not withdraw water from the environment to cool its first phase; its chillers will contain 514 tonnes of a fluid from the PFAS family.

Contents

Fouju is a village of 631 inhabitants, 40 km south-east of Paris; farmland occupies 87% of its area. At the place called Les Bordes, near the A5 motorway, the company Campus IA, owned by the Emirati fund MGX, Bpifrance, Mistral AI and Nvidia, is building on about 89 hectares of farmland what the Île-de-France environmental authority calls the "largest data centre campus in Europe" (our translation):

  • 11 data centre buildings 20 metres high, for 848 MW of IT capacity;
  • a 9.4-hectare electrical substation, connected to a 400,000-volt line;
  • 613 backup generators and 680 rooftop chillers.

The prefect issued the environmental authorisations on 29 July 2026, including the one to operate the first 3 buildings. Work on the first phase began in September, and these buildings are due to enter service in early 2028, according to the timetable published by the community of communes. Mistral AI, the first announced customer, has reserved up to 200 MW of computing capacity there. The next infographic sets the consumption of the finished campus against that of the region and the country.

Infographic. How much electricity will the Fouju campus consume? About 10.5 TWh a year at full power, 16% of the electricity consumed in Île-de-France in 2025 (66.3 TWh), and 2.3% of that of France (451 TWh). At the current utilisation rate of data centres, 2.7 TWh a year. Squares of proportional area place the campus within the square of Île-de-France; a small map locates Fouju in Seine-et-Marne, south-east of Paris.
Consumption at full power is the environmental authority's figure: 1,200 MW drawn all year, or 10.5 TWh, excluding auxiliaries and losses. At the current rate, we apply the 22% that RTE measures on the centres connected to the transmission grid to the 1,400 MW of connection capacity, or 2.7 TWh: the 2 values do not start from the same power. The shares are our calculation, on the 2025 consumption figures corrected for weather: 66.3 TWh for Île-de-France, 451.2 TWh for France (RTE). The area of the squares follows the TWh.Sources: opinion of the environmental authority of Île-de-France, 8 April 2026; RTE, Bilan électrique 2025, national and regional; Projet Celsius calculation. Infographic Projet Celsius, CC BY 4.0.
1.

At full power, about 10.5 TWh a year

The project file does not give a single value. 3 figures are in circulation, and they do not count the same thing.

Consumption per yearWhat it countsSource
9.7 TWh848 MW of IT load, multiplied by a PUE of 1.3, all yearimpact assessment, cited by the environmental authority
10.5 TWh1,200 MW drawn for 8,760 hours, excluding auxiliaries and lossesenvironmental authority, opinion of 8 April 2026
12.3 TWh1,400 MW, the maximum connection capacity planned with RTE, all yearour calculation

The whole campus built, at full power. PUE is the ratio of a centre's total electricity to that of its servers; the developer announces 1.18 to 1.3 depending on the building.

The hub uses about 10.5 TWh a year at full power, the environmental authority's value, within a range of 9.7 to 12.3 TWh. It is the value used in our analysis of contested projects, which compares Fouju with 2 other French projects. Set against 2025 consumption, it equals 16% of that of Île-de-France, according to RTE's regional footprint, and 2.3% of that of France (our calculation). It is also about 2 times the consumption in 2024 of all French data centres on dedicated sites, 4 to 5 TWh according to RTE, and more than 12 times the energy consumed in 2022 by the community of communes where the campus is being built.

A unit error in the opinion

The opinion states that the project will increase the energy consumption of the area by "9,657 MWh" (our translation). It should read GWh: 848 MW multiplied by a PUE of 1.3 and by 8,760 hours gives 9,657 GWh, or 9.66 TWh, to the digit (our calculation). The accompanying note keeps the same unit for the area, whereas elsewhere the opinion gives 841 GWh for its 2022 consumption. The ratio of 1,422% it draws, the 9,657 of the project against the 679 targeted in 2030 by the area's climate plan, does not depend on the unit.

The other figures in circulation

  • "200,000 households" (our translation): the opinion compares more than 10 TWh with the consumption of 200,000 households, counting 4,800 kWh per household. With this assumption, 10 TWh corresponds to about 2 million households (our calculation).
  • "17% of Île-de-France consumption" (our translation) : a written question to the Senate relates 10 TWh to Île-de-France. Of the 66.3 TWh of 2025, 10 TWh make 15%.
2.

Actual consumption depends on the pace of construction and on utilisation

The campus will not run at full power for a long time. The contract signed with RTE on 26 January 2026, the first application of the accelerated connection procedure, provides for 240 MW by the end of 2027, 700 MW before the end of 2029, then up to 1,400 MW eventually. The developer's reply memorandum, of 24 April 2026, staggers the commissioning of the 11 buildings from 2027 to 2038.

StepBuildingsPower drawnEnd of commissioningPer year, at 22%Per year, at 100%
Phase 1DC1, DC2, DC4, DC11466 MW20300.9 TWh4.1 TWh
Phases 1 and 2and DC8, DC9, DC10802 MW20341.5 TWh7.0 TWh
Whole campusand DC3, DC5, DC6, DC71,258 MW20382.4 TWh11.0 TWh

Power drawn per building and start-of-operation dates: Campus IA reply memorandum, table 1, added up by us. Energy over the year: our calculation, cumulative power multiplied by the utilisation rate and by 8,760 hours. The environmental authority notes inconsistencies between the timetables in the file.

Only 3 buildings are currently entitled to operate. The orders of 29 July 2026 authorise the operation of DC1, DC2 and DC4, 346 MW between them 3; at full power all year, they would consume 3 TWh (our calculation). The operation of the 8 other buildings is not yet authorised.

Utilisation rate, the main unknown

A data centre does not draw its connection capacity continuously. According to RTE's Bilan électrique 2025, the centres connected to the transmission grid use on average today 22%, with a long ramp-up; RTE reports that operators expect about 80% in 10 to 15 years. Applied to the 1,400 MW of maximum connection capacity, these rates give consumption ranging from 1 to 4.5.

Annual consumption of the campus at 1,400 MW of connection capacity, by utilisation rate (our calculation).

22%, current average rate2.7 TWh80%, rate expected by operators9.8 TWh100%, all year12.3 TWh

The utilisation rate weighs as much as the number of buildings built, and the file states neither the expected rate nor the intended use of the machines: model training, answering users' questions or hosting. The 22% is measured on existing centres; a campus devoted to training could run closer to its capacity. Our analysis on the electricity shortage explains why reserved power matters as much, for the grid, as the energy consumed over the year.

3.

No water withdrawn to cool the first buildings

The first buildings will be air-cooled. Their rooftop chillers compress a refrigerant in a closed circuit and reject the heat into the outside air, without evaporating water. The developer justifies this choice by the sensitivity of the Champigny aquifer, whose water distribution zone covers the commune. It pays for it in electricity: according to its reply memorandum, air cooling consumes slightly more than evaporative cooling, hence a PUE of 1.18 to 1.3, which the environmental authority judges to be below current industry standards.

An air-cooled chiller on the roof of a building, its compressors visible behind a grille
An air-cooled chiller on a roof. The Fouju campus plans 680, 38 or 76 per building, which reject the heat of the servers into the air without evaporating water.Photo Saud, CC BY-SA 4.0, via Wikimedia Commons.

The order authorising DC1 draws its rules from it. The building is connected to the public drinking water network for sanitary uses, the fire reserve and watering, and no withdrawal from local resources is authorised for its cooling. Groundwater is pumped only during construction, to dry out the excavations: from 0 to less than 200,000 m³ a year between 2026 and 2035, according to the same order.

Air cooling does not settle the whole water question:

  • for the later phases, the file indicates that some buildings could use mixed cooling, which consumes water; the environmental authority then asks for the impact assessment to be updated;
  • the water evaporated by the power plants that produce the campus's electricity is not counted in the file. Our analysis of AI's water use explains why this indirect water often exceeds that of the sites; the hub does not yet put a figure on it for France.

514 tonnes of refrigerant

Dry cooling relies on a refrigerant. The campus's chillers will contain 514.3 tonnes of R-1234ze, according to the opinion of the environmental authority. This fluid does not attack the ozone layer and its direct greenhouse effect is very low, but it belongs to the PFAS family: as it breaks down in the atmosphere, it forms trifluoroacetic acid, which is hard to remove from water, and it leads to the production of HFC-23, a greenhouse gas 14,800 times more powerful than CO2.

Annual refrigerant leaks estimated by the impact assessment15 tonnes

3% a year of the campus's 514.3 tonnes, according to the impact assessment cited by the environmental authority.

The impact assessment judges these micro-leaks not significant. The environmental authority asks for a health risk assessment of these leaks, breakdown products included, and notes that the file's greenhouse gas footprint counts the leaks, 9.8 ktCO2e over 50 years, without their breakdown in the atmosphere. The developer replies that the fluid circulates in a closed, sealed circuit, and that only accidental micro-leaks are possible.

4.

Our view

Fouju's consumption reads as a range: from 2.7 TWh a year at the current utilisation rate to 10.5 TWh at full power, depending on a rate the developer does not publish. On water, dry cooling spares the aquifer; the trade-off is a fluid from the PFAS family and a slightly higher PUE. The file would benefit from publishing the expected utilisation rate and the cooling method of the 8 buildings whose operation remains to be authorised. Our questions about a data centre project apply to Fouju, and our analysis of how data centres are hosted raises the question of hosting them at the scale of France. 3 questions remain open:

  1. what utilisation rate does the developer expect, and for what uses?
  2. how will the buildings of phases 2 and 3 be cooled?
  3. how will refrigerant leaks be measured and published?
Caveat

The consumption figures on this page are values from the project file or our calculations; none is measured. Power is not energy: 1,400 MW of connection capacity amount to 12.3 TWh only if the campus draws it all year.

Clément Reynaud
The authorsClément ReynaudCo-founder of Projet Celsius

He holds a PhD in nanophysics from Aix-Marseille Université and an engineering degree from the Institut d'Optique, and co-founded Projet Celsius, where he heads the Marseille office.

His page and articles →Contact him →LinkedIn ↗
Sébastien Pierfederici
Sébastien PierfedericiLCA and eco-design specialist

An engineer from UTBM and life cycle assessment trainer at the Institut de Formation Carbone, he carries out the life cycle assessments at Projet Celsius.

His page and articles →Contact him →LinkedIn ↗
The AI Impact monthly newsletterWritten by Guillaume, Clément, Sébastien and Alexandre. New figures, explained and discussed.

Sources

11 documents

Every figure was read in its source; the hub's methodology is described in Methodology and sources.

Cite this analysis

Clément Reynaud and Sébastien Pierfederici, Fouju data center: how much electricity and water will it use?, AI Impact, Projet Celsius, 18 November 2026. https://projetcelsius.com/en/ai/analyses/fouju-data-center-electricity-and-water/

You may also like

The 17 pieces in this topic →

A question about a figure?

An error, a source to add, a methodology question, a press request: write to us. Guillaume Pakula, Clément Reynaud, Sébastien Pierfederici and Alexandre Veilly will reply.

Write to us →

Projet Celsius, which runs this hub, also helps companies measure and reduce the footprint of their AI use.