Packaging eco-design: costs and lead times for PPWR 2030

Recyclability, recycled content and the empty space ratio apply from 1 January 2030 at the earliest. With redesign taking 18 to 24 months, decisions need to be prepared as supplier specifications are negotiated.

Sébastien Pierfederici
By Sébastien Pierfederici, LCA and eco-design specialist at Projet Celsius, PEF expert and IFC trainer. He helps manufacturers assess product environmental footprints.
August 2026
Updated August 2026 · 9 min
Replacing plastic with cardboard, reducing packaging weight or switching to a mono-material: these decisions often rely on a single criterion because there is no basis for comparison. The European regulation sets the deadline at 1 January 2030, and packaging redesign takes 18 to 24 months. The assessment needs to establish where the impact lies, how two options compare and what the assessment itself costs.
Key takeaways
  • 1Packaging accounts for a minority of a product's impact, unless it lets the product deteriorate.
  • 2Reused glass may perform better or worse, depending on rotations and washing distance.
  • 3Avoided extended producer responsibility (EPR) fees form part of the business case for packaging redesign.
  • 4Bpifrance Diag Éco-conception: 60 to 70% funded, with a remaining cost from €5,400 excl. VAT.

Almost all the requirements converge on 1 January 2030 under the European packaging regulation, the Packaging and Packaging Waste Regulation (PPWR). Recyclability of all packaging, minimum recycled plastic content, banned formats in Annex V, an empty space ratio capped at 50% and the first reuse targets: these obligations share a target date, which is the earliest possible date for recyclability, recycled content and the empty space ratio.

Packaging redesign moves at the pace of supplier contracts. You need to qualify an alternative, validate its ability to protect the product, use up stocks already ordered and sometimes modify a packaging line. Each step takes months, extending the overall lead time.

1Redesign lead times depend on supplier qualification

A portfolio inventory takes three to four months, because packaging data is scattered across procurement, quality and production, often in files that are not linked. Assessing the key packaging types takes another four months, and qualification with the supplier six to twelve months.

That means 18 to 24 months before the first packaging type changes specification. Starting in 2026 leaves a comfortable margin and allows you to work through the portfolio in stages. Starting in 2028 leaves little room for manoeuvre: decisions then lack a basis for comparison, and the choice falls to whichever supplier is available.

Industrial sequence · from decision to placing on the market

Two years between the decision and the first modified reference

Three workstreams that follow one another, and a fixed deadline of 1 January 2030. Durations depend on supplier contracts and qualification cycles.

013 to 4 months
Consolidated packaging inventory

References, materials, weights, volumes, tonnages.

024 months
LCA on 3 to 5 key references

The impact contributors and the quantified gains of a redesign.

036 to 12 months
Supplier qualification

Specification, performance tests, industrial validation.

Total: 18 to 24 months

Between the decision and the placing on the market of the first modified reference.

Deadline1 January 2030everything takes effect on the same day
RecyclabilityRecycled plastic contentBanned formatsEmpty space ratio capped at 50%First reuse targets
Durations observed on packaging eco-design projects carried out by Celsius; deadlines: Regulation (EU) 2025/40.

Retailers are also bringing the timetable forward. They adjust their specifications ahead of the regulation, to avoid being left with packaging types they cannot sell. Several retailers already require a recyclability data sheet when listing a product, bringing the practical deadline forward to 2028 for companies selling through major retailers.

Need support?

The regulation's obligations do not all apply to every type of packaging or to everyone placing it on the market.

2Packaging protection shapes the overall environmental impact

For a food product, a life cycle assessment (LCA) (in French) shows that packaging accounts for a minority of the total impact. The contents dominate, sometimes by a wide margin, and this balance determines the choices that follow.

Even with that minority share, packaging can increase or reduce the overall impact. Inadequate packaging lets the product deteriorate, and the lost product carries its entire production impact with it. ADEME (the French Agency for Ecological Transition) makes this point: for some products, a little more packaging may be the option with the lowest impact, provided it prevents the contents from being lost.

Reducing material without monitoring breakage may therefore worsen the overall result. Reducing the weight of packaging that provided adequate protection by 15%, while the breakage rate rises from 0.5% to 2%, is enough to cancel out the gain once the packaged product's impact exceeds roughly ten times that of its packaging.

The four main sources of impact

  • Raw material production, almost always the largest source of impact for single-use packaging, and the one most affected by recycled content.
  • The weight transported, which depends much more on density and the number of units per pallet than on distance travelled.
  • Empty space, long overlooked in assessments and now regulated: it means extra lorries and more void-fill material.
  • End of life, whose effect depends less on the material specified than on the waste management system available where the product is sold.

Their ranking changes with the product. For a beverage bottle, material and weight outweigh everything else. For an e-commerce parcel, empty space comes first: an oversized box increases both void fill and transported volume. A first product LCA (in French) starts by establishing this ranking.

Four impact contributors, three packaging profiles

The four impact contributors, and why their order changes

The same four contributors appear everywhere, but their hierarchy depends on the product being packaged. Switch profile to see the ranking reorder.

1
Raw material productiondominant

The largest contributor on almost any single-use packaging, and the one that recycled content shifts the most.

2
Transported weightdominant

Determined by density and the number of units per pallet, much more than by the distance travelled.

3
End of lifesecondary

Depends less on the stated material than on the end-of-life route that actually exists where the product is sold.

4
Empty spacemarginal

Long invisible in footprint assessments, now regulated, it is paid for in lorries and in void-fill material.

Qualitative orders of magnitude. The actual ranking for a given piece of packaging is determined by an LCA on its own data.

Impact contributors drawn from the Celsius packaging eco-design method.

Reusable glass and single-use packaging

ADEME examined this question through fourteen scenarios in its environmental assessment of deposit return for reuse in France. Its findings depend on specific conditions: return rate, packaging weight and distance between the collection point and the washing facility. Reuse becomes favourable when it completes many rotations and is washed nearby, and its advantage diminishes as the logistics loop lengthens. The framework for reuse targets sets a direction, but does not remove the need to assess your own loop.

Compostable packaging is not necessarily recyclable

The word "compostable" describes the ability to break down under controlled conditions. ADEME points out that compostable plastics are not a miracle solution: this packaging rarely reaches a composting facility, as operators remove it upstream because they cannot distinguish it from other plastics. Composting is not recycling, as most of the material becomes CO2. Compostable packaging retains a role in targeted uses, typically packaging soiled by biowaste.

Mono-material packaging and barrier performance

Mono-material packaging meets the 2030 recyclability criteria most readily, while multilayer composites face the highest penalties under eco-modulation. The barrier preserves the product for its intended shelf life: substituting material without requalification shifts the impact from packaging waste to product waste. Mono-materials with enhanced barriers are available today for several dry product categories. The obstacle often lies elsewhere: the existing packaging type has already been qualified, it works and nobody has a mandate to revisit it.

For the same product, a change in washing distance or return rate can reverse the ranking of two packaging options.

3An inventory establishes the scope and cost of assessment

The inventory comes before the LCA. Few companies fully understand their packaging portfolio before consolidating the data, and assessment is meaningless when the scope is uncertain. Our 7-step eco-design process (in French) sets out the general approach; what follows applies it specifically to packaging.

The most underestimated cost is still internal staff time. Finding the exact weight of a packaging type sometimes means weighing it, calling a supplier again or reopening a technical data sheet from 2019. Allow three to six full-time-equivalent months, spread across the project and shared between procurement and quality teams.

Quality inspection on a bottle filling and packaging line in an industrial facility
Supplier qualification and performance trials on the line are often the longest stage of redesign.

What the engagement covers and costs

  • Consolidated packaging inventory, around 3 months: packaging types, materials, weights, volumes and declared tonnages. €15,000 to €30,000.
  • Packaging LCA for 3 to 5 key packaging types, around 4 months: those responsible for the tonnage, rather than those prompting internal debate. €20,000 to €50,000.
  • Eco-design plan and supplier specifications: quantified scenarios, target weight, recycled content rate and an enforceable recyclability criterion.

These ranges cover assessment and the eco-design plan, which is the work we carry out. Performance trials, supplier qualification and conformity testing remain with your teams and suppliers, with their own lead times. Our article on the cost of a product LCA (in French) examines the budget in more detail.

Avoided EPR fees contribute to the business case

Eco-modulation adjusts the EPR fee (éco-contribution) paid to the producer responsibility organisation (PRO, éco-organisme in French) according to the packaging's characteristics: bonuses for reduction, incentives for incorporating recycled material and penalties for recycling disruptors. In France, Citeo describes a progressive fee schedule that may rise from 10% to 100% of the fee over several years.

This cost applies to recurring annual tonnages, making it a factor in profitability that is rarely quantified in decision papers. For future planning, Citeo expects the harmonised European recyclability score to supersede part of the national fee schedules by 2028-2030. Decisions are therefore better based on physical parameters, weight, materials and recyclability, which will remain valid after harmonisation.

Funding and further uses for the assessment

In France, Bpifrance (the French public investment bank) offers the Diag Éco-conception (eco-design diagnostic), funded by ADEME, covering 60 to 70% of an engagement budgeted at €18,000 excl. VAT: scoping, product LCA and an eco-design plan. The remaining cost is €5,400 excl. VAT for fewer than 50 employees, or €7,200 excl. VAT for fewer than 250, for small and medium-sized enterprises (SMEs) under the European definition, including micro-enterprises, in all sectors. Projet Celsius is approved under this scheme and handles the application with you. Other grants may be combined with it (in French).

The database created for this work has further uses: it supports the Digital Product Passport (in French) and eco-design requirements under the Ecodesign for Sustainable Products Regulation (ESPR) (in French), whose timetable largely overlaps (in French) with that for packaging. This is the approach we use in our work on textile eco-design (in French), where a single database supports four obligations.

The output of this work must be enforceable against a supplier. A report limited to general recommendations leaves packaging types unchanged. Specifications setting a target weight, a recycled content rate and a verifiable recyclability criterion give the supply chain binding requirements.

4Key takeaways

  • 5 obligations target 1 January 2030: banned formats and the first reuse targets on that date, with recyclability, recycled content and the empty space ratio applying from that date at the earliest (full timetable).
  • 18 to 24 months separate the decision from the first specification change, allowing time for the inventory, assessment and supplier qualification.
  • Packaging accounts for a minority of a product's impact, but poorly judged weight reduction causes the contents to be lost, as ADEME has documented.
  • Reusable glass, compostable packaging and mono-materials: every comparison depends on measurable conditions, rather than the material alone.
  • Diag Éco-conception funds 60 to 70% of an engagement budgeted at €18,000 excl. VAT, with a remaining cost from €5,400 excl. VAT. Projet Celsius is approved under this scheme.
Further resources

Frequently asked questions

No. Assessing the whole portfolio would be expensive and delay decisions. In practice, you examine 3 to 5 packaging types that account for most of the tonnage and cover the main material families, then use analogous cases to extrapolate to the rest. Marginal packaging types are addressed at the end, using parameters already validated. Our article on the first product LCA (in French) explains how to scope this selection.
It depends on the product, the barrier required and the logistics. Cardboard benefits from a mature recycling system and wide acceptance, but often weighs more for equivalent performance and withstands moisture poorly. A cardboard composite with an inner film may be less recyclable than a plastic mono-material. The choice depends on the function the packaging needs to fulfil and the system available in the destination market, rather than the material itself.
No. ADEME points out that composting a compostable plastic is not recycling: most of the material becomes CO2 without being incorporated into a new product. This packaging also rarely reaches a composting facility, as operators remove it because they cannot distinguish it from other plastics. Compostable packaging remains relevant for targeted uses, particularly packaging soiled by biowaste, but does not meet the 2030 recyclability requirements.
A standard redesign takes 18 to 24 months from the decision until the first modified packaging type is placed on the market. The consolidated inventory takes 3 to 4 months, assessment of the key packaging types 4 months and supplier qualification 6 to 12 months, depending on how critical the product is. Sectors with food-contact or medical-device requirements are at the upper end of this range, because of the stability trials needed.
It covers an engagement budgeted at €18,000 excl. VAT, corresponding to a pilot scope: a product or packaging family, its LCA and the resulting eco-design plan. A complete range is addressed in several waves, with the first wave funding the method and parameters reused in later waves. Other available grants (in French) allow the scope to be extended.
It may no longer be placed on the European market. Before that date, the effect is mainly economic: eco-modulation penalties increase, and some retailers adjust their specifications ahead of the regulation. The regulation guide explains the penalties and competent authorities.
For a food product, packaging accounts for a minority of the total impact, with the contents sometimes dominating by a wide margin. That balance can shift in either direction: inadequate packaging lets the product deteriorate, and the lost product carries its entire production impact with it. ADEME therefore stresses that, for some products, a little more packaging may be the option with the lowest impact. Reducing packaging weight by 15% while breakage rises from 0.5% to 2% is enough to cancel out the gain once the product's impact exceeds roughly ten times that of its packaging. The ranking of impact sources varies with the product, and an initial assessment establishes it.
A consolidated packaging inventory costs €15,000 to €30,000 for around 3 months of work, and an LCA of 3 to 5 key packaging types costs €20,000 to €50,000 for around 4 months. These ranges cover assessment and the eco-design plan, including supplier specifications. Performance trials, supplier qualification and conformity testing remain the responsibility of the company and its suppliers. Allow a further 3 to 6 full-time-equivalent months internally. Bpifrance's Diag Éco-conception, funded by ADEME, covers 60 to 70% of an engagement budgeted at €18,000 excl. VAT.
Mono-material packaging meets the recyclability criteria, applicable from 1 January 2030 at the earliest, more readily. Multilayer composites face the highest penalties under eco-modulation. This criterion alone is not enough to decide, as the barrier preserves the product for its intended shelf life: replacing a composite without requalifying the packaging shifts the impact from packaging waste to product waste. Mono-materials with enhanced barriers are already available for several dry product categories. The obstacle is often organisational: the existing packaging type has been qualified and nobody has a mandate to revisit it.
Yes, through eco-modulation, which adjusts the fee paid to the producer responsibility organisation according to the packaging's characteristics: bonuses for material reduction, incentives for incorporating recycled material and penalties for recycling disruptors. Citeo describes a progressive fee schedule that may range from 10% to 100% of the fee over several years. As the EPR fee applies to recurring annual tonnages, the saving accumulates year after year. Citeo expects a harmonised European recyclability score to supersede part of the national fee schedules by 2028-2030, which is why weight, materials and recyclability are useful parameters.
or: [email protected]

More articles to read

View all →
French environmental cost label for clothing: what changed on 1 October 2026
Regulation

French environmental cost label for clothing: what changed on 1 October 2026

6 min read
Which garments can display an environmental cost in France? Timeline and thresholds, 2025-2027
Regulation

Which garments can display an environmental cost in France? Timeline and thresholds, 2025-2027

10 min read
Removable batteries and battery passports: who is affected in 2027?
Regulation

Removable batteries and battery passports: who is affected in 2027?

14 min read

No two situations are exactly alike.

Tell us about yours: your situation, deadline and budget. A senior consultant will reply within 24 working hours with an honest assessment.

Let us discuss it within 24 hours →
Our toolkit

A full range of free assessment tools

Cost estimator, obligation and eligibility checkers, footprint calculator.

Estimate costs and impacts
Réf. 2026·BC·0184RAPPORT · EXERCICE 2026Bilan Carbone®complet 1·2·3Restitution Comex · Plan d'action 2027SOMMAIRE01Synthèse exécutivep. 402Périmètre et méthodologiep. 1203Émissions par scopep. 2404Plan d'action 2027p. 5605Annexes méthodologiquesp. 78VOLUME84 pages · ConfidentielRÉFÉRENTIELISO 14064 · GHG ProtocolDEVIS · BC.2026.0184Émis 05·05·2026 · Validité 30 jCabinet Celsius · Paris 3eCHIFFRAGE INDICATIFVotre entrepriseETI · 180 collaborateurs · CSRD 2027PRESTATIONBilan Carbone®Périmètre 1·2·3 · 13 semainesAIDE BPIFRANCE · - 60 %FOURCHETTE INDICATIVE HT16 800à 22 400 €DÉTAIL DE LA MISSION01 · CADRAGE3 sem.~ 4 200 €02 · MODÉLISATION8 sem.~ 9 800 €03 · RESTITUTION2 sem.~ 4 800 €Estimation indicative · Affinée après cadrageSIRET 891 234 567 00012

Bilan Carbone® cost estimator

Your price range in 1 minute, based on 2026 market rates and public funding.

1 minStart
Estimate costs and impacts
EMPREINTE IA · USAGE MENSUELVOTRE EMPREINTE TOTALE4,2 kgCO₂eq sur 1 000 prompts type · Mai 2026COMPARAISON DES MODÈLES · 1 000 PROMPTS TYPEGPT-4oOpenAI6,8 kgClaude OpusAnthropic2,1 kgGemini ProGoogle4,5 kgMistral LargeMistral AI · FR1,6 kg

AI carbon footprint calculator

The climate impact of your AI queries, by model and task. Ecologits methodology.

3 minStart
Check an obligation
DIAGDÉCARBON'ACTIONACCÉLÉREZ LATRANSFORMATIONÉNERGÉTIQUE ETÉCOLOGIQUE DEVOTRE ENTREPRISEDISPOSITIF OFFICIEL · BPIFRANCE × ADEMESIMULATEUR · ÉLIGIBILITÉÉLIGIBLEVous remplissez les 3 critères du Diag Décarbon'Action.VOTRE FINANCEMENT10 000 € HT6 000 €HTReste à charge après subvention BpifranceRÉPARTITION DU FINANCEMENTBPIFRANCE 40%VOUS 60%4 000 €6 000 €DISPOSITIF SUBVENTIONNÉ PAR

Diag Décarbon'Action eligibility

Check in 30 seconds whether your business is eligible for Bpifrance funding covering 40% of a Bilan Carbone® assessment.

30 secStart
Check an obligation
RÉPUBLIQUE FRANÇAISEMinistère de la Transition ÉcologiqueOBLIGATION LÉGALEBilan d'Émissions deGaz à Effet de SerreArticle L.229-25 du Code de l'environnementDécret 2022-982 · publié 1er juillet 2022PÉRIODICITÉ · 4 ANSDÉPÔT · ADEMESIMULATEUR · OBLIGATION BEGESASSUJETTI720 salariés · obligation BEGESSANCTION ENCOURUE50 000 €amende max si non-réalisationart. R.229-50RÉFÉRENCE OFFICIELLE

BEGES checker

Does the BEGES requirement apply to you? An immediate answer, with the deadline and penalty.

30 secStart
Check an obligation
9:42SCANSCANNING DPP...DPP IDENTIFIÉT-shirt coton bioSKU TX-CB-220 · Lot L-26-04781CONFORME ESPR42 DATA POINTS · 5 SECTIONSORIGINEInde · GOTSCoton bioEMPREINTE5,2 kg CO₂eqACV ISO 14040RECYCLABILITÉ85%Filière cotonRÉPARABILITÉ7,5 / 10Pièces accessiblesFIN DE VIEFilière TLC · Bordeaux/FRRécupérateur agréé RefashionUE · ESPR 2024/178112.05.2026

DPP checker

Is your product covered by the Digital Product Passport?

1 minStart
Check an obligation
COÛTENVIRONNEMENTAL386POINTS257POUR 100 GMéthode officielleEcobalyse, v7.0.0SIMULATEUR · AFFICHAGE ENVIRONNEMENTALÉLIGIBLETextile · affichage volontaireCOÛT ENVIRONNEMENTAL386 ptst-shirt 150 g · 257 pts pour 100 gExemple : FAQ du ministère de la Transition écologique

Textile environmental labelling 2026

Voluntary labelling, but third parties can publish it from October 2026: where do you stand?

1 minStart