- 1ADEME recommends 7 points, from the project team through to communication.
- 2The NF X30-264 standard, revised in July 2025, describes the method behind these points.
- 3The Diag Écoconception leaves an SME to pay €5,400 or €7,200 excl. VAT.
- 4Turnover rises, but the return has to be managed.
To set up an eco-design process, ADEME (the French Agency for Ecological Transition) recommends 7 points: bring together a team backed by management, train it, choose a reference product, assess it across its whole life cycle, improve it, reassess it, then communicate. The NF X30-264 standard, revised in July 2025, describes the method.
The 7 steps of an eco-design process
Choose a step: what is done there, what comes out of it and who can help.
Assess, improve, communicate: the loop starts again on other products.
1. Bring together a team backed by management
What you do
Bring together marketing, purchasing, design, production, R&D, CSR and quality. The team can be opened up to suppliers or customers along the value chain.
What you end up with
A cross-functional project team, and the level of skill targeted: what the company wants to do itself in the long run.
Support and guidance
ADEME sees management backing as a major success factor.
An engineering consultancy that can lead the project team.
The process involves the whole company, not only the life cycle assessment (LCA) that measures its impact. Carrying out an LCA is covered in a separate guide; this one deals with organisation, budget and what the process brings in return.
1What is an eco-design process?
ADEME defines it as a multicriteria approach that reduces the impacts of a product, a production process or a service across its whole life cycle, while maintaining its performance in use. It runs in 3 stages that repeat in a loop: assess, improve, then communicate the performance achieved.
2 standards to frame it
NF X30-264, published by AFNOR (the French standards body) in July 2025, sets out the principles and the method for implementation; it replaces the 2013 edition. ISO 14006, in its 2020 version confirmed in 2025, builds eco-design into an environmental management system. Neither of the 2 is mandatory, but they give teams and service providers a common vocabulary.
Where French companies stand
The 2025 ADEME barometer, carried out among 1,107 companies, shows a widespread but rarely structured practice. 82% carry out eco-design actions, but only 22% include the reduction of their impacts in a long-term roadmap. And 88% of those that have done so want to continue.
Regulation pushes in the same direction. The EU Ecodesign for Sustainable Products Regulation (ESPR) allows eco-design requirements to be imposed product family by product family, and our timeline for regulatory eco-design sets out the deadlines already known.
2Where should you start, depending on your situation?
Point 1 of the ADEME method is human: eco-design involves marketing, purchasing, design, production, R&D, CSR (corporate social responsibility) and quality. A cross-functional project team, backed by management, is according to the agency a major success factor. The team may be opened up to suppliers or customers along the value chain.

Next comes the choice of a reference product. ADEME advises a strategic product, a project sized to the resources available, outcome targets defined in advance, and a look at customer expectations and competitors' positions. The right starting point also depends on what triggers the process: a customer request, forthcoming regulation, a plan to make an environmental claim or costs to reduce.
Where should you start an eco-design process?
Choose what triggers your process and the size of your company.
left to pay excl. VAT with the Diag Écoconception
Out of €18,000 excl. VAT, LCA and action plan included.
A planned claim, in particular, calls for solid evidence before any communication, as explained in our guide to proving an environmental claim. Training teams in LCA and the digital product passport can also guide the choice.
3What are the 7 steps of the process?
The methodology recommended by ADEME comes down to 7 points, which draw on NF X30-264:
- Step 1 brings the team together around the project, with management, and sets the level of skill targeted according to what the company wants to do itself in the long run.
- Step 2 trains the team in the issues and methods: the Pôle Éco-conception, for example, offers 4 online modules, 10 hours in all.
- Step 3 chooses the reference product, process or service, with its objectives and its market context.
- Step 4 carries out a first environmental assessment across the whole life cycle and on several criteria, to avoid burden shifting from one stage to another.
- Step 5 proposes, prioritises and implements improvement options, with tools such as the Brezet Wheel or the EU Ecolabel specification.
- Step 6 reassesses the product once it has been eco-designed, checks for burden shifting and weighs the results against the company's other constraints.
- Step 7 communicates the improved performance to customers, users and partners, as the result of a structured process.
The loop then starts again on other products. The assessment in steps 4 and 6 often takes the form of an LCA, whose European method is described in our guide to the Product Environmental Footprint (PEF). An LCA carried out with method remains possible on a small budget.
An assessment that changes no decision about the product is not yet an eco-design process.
Each sector applies these steps in its own way: packaging, clothing, cosmetics, buildings and mattresses each have their own levers.

4How much does an eco-design process cost, and who funds it?
For an SME, the public reference point is the Diag Écoconception of Bpifrance (the French public investment bank), funded by ADEME. It covers 18 days of consultancy, spread over 10 months, with an expert referenced by Bpifrance, in 5 phases:
- Analysis of the company's context, scope and issues.
- Raising awareness among the teams and training an in-house eco-design lead.
- An environmental assessment based on the LCA of the product or service.
- Identification and costing of levers, while controlling the risk of burden shifting.
- Preparation of the action plan, with a first technical and economic costing.
The total cost is €18,000 excl. VAT. After the subsidy, the amount left to pay is €5,400 excl. VAT for a small business, with 1 to 49 employees and turnover under €10 million. It is €7,200 excl. VAT for a medium-sized business, with 50 to 249 employees. Products judged too complex when the application is reviewed are not eligible.
Beyond the diagnostic, ADEME supports the eco-design studies of companies of all sizes, then roll-out investments, depending on the size and ambition of the project. The price of a more detailed study is set out in how much an LCA costs, and the other schemes in the overview of transition funding.
To choose the engineering consultancy, ADEME gives 4 criteria:
- It masters environmental assessment and life cycle assessment methods, with the tools that go with them, to measure the product before and after the improvement.
- It can lead the project team and collaborative innovation sessions, where most eco-design levers are found.
- It knows the company's sector, and so understands its practices without discovering them during the engagement.
- It can train people, so that the company can take over part of the assessments in time, as point 1 of the method provides.
For the Diag Écoconception, the expert must also be referenced by Bpifrance. The eligibility conditions, the application and what follows the Diag are set out in our article on the Diag Écoconception.
5What does eco-design bring a company?
Financially, the 2022 ADEME study followed 25 companies that had been involved for several years, including Groupe SEB, Sidel and Terreal. It observes a systematic rise in turnover, but also a rise in variable costs, and an operating result that varies from case to case. In this panel, the effort almost always goes into raw materials, more rarely into processes or use.
Average change in 6 criteria after an eco-design process
Average of the 25 companies followed by ADEME, scored from −3 to +3 against the starting position.
The 4 case studies presented below show where companies act first: materials at Besson, the whole product life at Laudescher, the wheat supply chain at CRC, logistics at Azade. Azade's case can be costed. Its project cost €12,123, including €7,414 of ADEME funding, and the film avoided saves about €333 a month. According to a calculation based on the ADEME case sheet, the amount left to pay is recovered in about 14 months, not counting the time spent training the teams.
Eco-design projects published by ADEME
Choose a company to read what it changed and what it measured.
-25 to -67%
environmental impact across 4 models
Stage targeted: raw materials
4 shoes assessed with the Product Environmental Footprint (PEF) method, then more cork, more recycled materials and FSC-certified boxes. More than 50 models followed the next season.
The 2020 barometer adds further nuance. Among the companies engaged in eco-design that were able to answer, 30% perceive a rise in their margin, 48% stability and 21% a fall. These answers remain self-reported: nearly half of the engaged companies cannot say what the effect on their margin is, and 79% do not track the return on investment.
6What mistakes make a process fail?
ADEME's recommendations and barometers make it possible to name 5 mistakes that leave a project without follow-up:
- A process driven by a single department, without management or purchasing, produces options that nobody can put into practice.
- An improvement judged on a single criterion, carbon or weight, can shift the impact to water, resources or end of life: ADEME recommends a multicriteria assessment.
- Communicating before the product has been reassessed risks an unsubstantiated claim, and the Empowering Consumers Directive (EmpCo) and the list of banned claims penalise such claims.
- A process without a monitoring indicator cannot say what it brings in return: this is the case for 79% of the engaged companies surveyed by ADEME in 2020.
- A project with no follow-up remains a one-off: ISO 14006 exists precisely to build eco-design into the company's management system.

For us at Projet Celsius, the choice of the reference product decides what follows. A high-volume product, whose supplier data is accessible, gives a useful first assessment and levers that the company can put to use. We carry out the LCA and support the process with the project team, from scoping to the action plan.
7Key takeaways
- An eco-design process reduces a product's impacts across its whole life cycle and on several criteria, while maintaining its performance in use.
- ADEME recommends 7 points, from the project team to communication, drawing on NF X30-264 as revised in July 2025.
- In 2025, 82% of the companies surveyed by ADEME take eco-design action, but only 22% have a long-term roadmap.
- The Diag Écoconception costs €18,000 excl. VAT, leaving an SME €5,400 or €7,200 excl. VAT to pay.
- Turnover rises in the companies followed by ADEME, but so do variable costs: the return has to be managed.
To measure the product itself, see how to carry out a first LCA.
- ADEME, Improve your performance with eco-design, page published on 19 January 2026: 7-point methodology, 2025 barometer figures, funding. Consulted on 17 October 2026.
- ADEME and Pôle Éco-conception, Eco-design barometer 2025, November 2025, 1,107 companies.
- ADEME, Eco-design barometer 2020, Harris Interactive, 394 companies.
- ADEME and I Care, Analysis of the economic benefits of eco-design for companies, October 2022, 25 companies.
- AFNOR, NF X30-264, Environmental management, principles and method for setting up an eco-design process, July 2025; ISO, ISO 14006:2020.
- France Num, Diag Écoconception sheet, updated on 5 January 2026.
- Mission transition écologique, Diag Écoconception sheet: 18 days of consultancy spread over 10 months, expert referenced by Bpifrance. Consulted on 17 October 2026.
- ADEME, case studies: Besson, Laudescher, CRC supply chain, Azade. Consulted on 17 October 2026. The ADEME, AFNOR, France Num and Mission transition écologique pages are in French.




