Skip to content
Get in touchFR
Updated in September 2026
Practical guide

FDES, EPD or PEP: which declaration to publish for your construction product in France?

A decision guide for manufacturers selling into France: publishing an FDES, the French environmental and health declaration for construction products, costs €10k to €15k and takes 6 to 9 months, and for some products it is not the right format.

Sébastien Pierfederici
By Sébastien Pierfederici, LCA and eco-design specialist at Projet Celsius, PEF expert and IFC trainer. He helps manufacturers assess product environmental footprints.
May 2026
Updated September 2026 · 9 min
To have its products accepted in calculations under RE2020, France's environmental regulation for new buildings, a manufacturer must publish verified environmental data. Four formats exist (EPD, FDES, PEP and LCA), and choosing the wrong one costs months and several thousand euros in rework. The FDES (Environmental and Health Declaration Sheet) and the PEP (Product Environmental Profile) are the French forms of the EPD, the first for construction products and the second for plugged-in equipment. A third-party verified individual FDES costs between €12,000 and €19,000 and takes 6 to 9 months. A collective FDES from a trade association worsens your score, and a product outside the scope falls back on default environmental data (DED), with a penalty that reaches +30%.
Key takeaways
  • 1Four formats to choose from: international EPD, FDES for construction products, PEP for equipment, stand-alone LCA.
  • 2A verified individual FDES costs €12,000 to €19,000 excl. VAT and takes 6 to 9 months to produce.
  • 3A collective FDES from a trade association costs a few thousand euros but worsens your RE2020 score.
  • 4Outside the scope, default values apply (DED, default environmental data), with an automatic +30% penalty.

1Every FDES and PEP is an EPD, but not every EPD can be used directly under RE2020

The four acronyms nest inside one another. LCA (life cycle assessment) is the scientific method, and it stops at measurement. EPD (Environmental Product Declaration) is the published format, verified and comparable under ISO 14025. To be used in a calculation under RE2020, France's environmental regulation for new buildings, an EPD must take the form of an FDES (Environmental and Health Declaration Sheet) for construction products or a PEP (Product Environmental Profile) for plugged-in equipment, registered in INIES, the French national database. Every FDES is by definition a valid EPD. The reverse does not hold: a German IBU EPD or an ECO Platform EPD cannot be used directly in an Ic Construction calculation (Ic Construction is the RE2020 indicator of embodied carbon).

Overview · the path of an environmental data point

From the installed product to the RE2020 Ic Construction calculation

These acronyms are not mere synonyms. They trace a path: the method (LCA) generates a published format (EPD), which France breaks down into two sheets (FDES for materials, PEP for equipment), centralised in a database (INIES) that feeds the regulatory calculation (Ic Construction).

Product
The installed item

Concrete, insulation, heat pump, light fitting: any product that goes into the building.

Who · Manufacturer
LCA
The method

Life cycle assessment · ISO 14040/14044. The science that measures impacts.

Who · Consultancy
EPD
The format

Environmental Product Declaration · ISO 14025 + EN 15804+A2. Publishes the verified results.

Who · Third-party verifier
FDES
French sheet · materials

French EPD for construction products (NF EN 15804/CN).

Who · Manufacturer + CSTB
PEP
French sheet · equipment

French EPD for electrical, electronic and HVAC equipment.

Who · PEP ecopassport
INIES
The national database

All FDES and PEP sheets centralised (6,500+ sheets). The only accepted source.

Who · Alliance HQE-GBC
Ic Construction
The verdict

Carbon indicator of the RE2020 calculation. The building permit depends on it.

Who · RE2020 client adviser · design team
À retenirSeven links, one chain:each one builds on the one before.
Celsius · based on INIES, ISO 14025, EN 15804+A2, RE2020 ministerial order of 4 August 2021

For a manufacturer, the first question is therefore not which of the four sheets to publish but which one its customers will accept, in France under RE2020 as elsewhere in Europe. The answer depends on two things only: the physical nature of your product (built in or plugged in) and the market you are targeting (France under RE2020, or Europe in general).

The overview in this section sets out the full path, from the acronyms to the parties in charge.

2FDES or PEP: the line falls between built-in products and plugged-in equipment

FDES covers everything that is anchored, insulated, bonded or built into the building: concrete and mortar, mineral and bio-based insulation, windows and doors (aluminium, timber, PVC), plasterboard and partitions, floor coverings and paints, waterproofing and roofing. In other words, the structural work and the passive finishing work.

Where to draw the line

FDES for what is built in, PEP for what is plugged in

A simple rule for placing each building product in the right family of declaration, and therefore in the right database.

FDES
Construction products
What is anchored, insulated, bonded, built in.
  • Concrete, mortar, aggregates
  • Mineral wool, bio-based insulation
  • Aluminium, timber and PVC windows and doors
  • Plasterboard, partitions
  • Floor coverings, paints
  • Roofing, waterproofing
PEP
Technical equipment
What plugs in, is controlled and consumes during use.
  • Heat pumps, air conditioners
  • Single-flow and dual-flow mechanical ventilation (VMC)
  • LED luminaires, ballasts
  • Boilers, burners
  • Lifts, goods hoists
  • Electrical distribution boards and wiring
À retenirAnchored, insulated, bonded: FDES.Plugged in, controlled, consuming: PEP.
Celsius · based on INIES and the PEP ecopassport programme

PEP covers everything that is plugged in and controlled and that consumes energy in use: heat pumps, single-flow and dual-flow mechanical ventilation (VMC), LED luminaires and ballasts, boilers, lifts, electrical distribution boards and wiring, air conditioning. What sets a PEP product apart is that it consumes energy in modules B6-B7, which brings in use-phase data that an FDES does not have to model.

As a rule of thumb, a product with a power cable or a control panel is a PEP product, and one that takes its final form on site (poured concrete, installed insulation, windows and doors set in place) is an FDES product. There are grey areas (an electric radiator, a motorised blind, built-in home automation), but they are a minority, and when in doubt the product category rules (PCR) for the sector decide.

Construction materials stacked on a building site
Manufacturers have registered more than 6,500 FDES and PEP sheets in INIES, a national asset that shapes the RE2020 market.

3INIES, PEP ecopassport and ECO Platform: only INIES data is accepted as it stands

Whether a sheet is accepted in a RE2020 calculation depends on the database it is registered in. Three databases coexist, each with its own logic.

Who does what in INIES

The national database of environmental data, behind the scenes

Three organisations share responsibility for INIES. Knowing who to talk to when a sheet is missing or a submission is stuck saves weeks.

01
Lead and owner
Alliance HQE-GBC France
Drives the strategy of the database, decides on its development and represents INIES in national and European bodies.
02
CTIB chair
AIMCC
Construction product manufacturers chair the Comité Technique InterBases (inter-database technical committee), the group that rules on technical questions.
03
Technical administrator
CSTB
Runs the platform day to day, processes sheet submissions and maintains the registration and export tools for calculation software.
À retenirIn an RE2020 check, the INIES registration prevails:not the calculation engine of the software.
INIES · Alliance HQE-GBC France statutes · CSTB agreements

INIES is the French national database and, for a manufacturer, the one to target. It holds more than 6,500 sheets (a threshold crossed in July 2025), covering most of the work packages of a building, and it is the only database whose data is accepted as it stands in RE2020 calculation software (Pléiades, Cypebat, Lesosai, Archiwizard). It is led by the Alliance HQE-GBC France (the French sustainable building association); the AIMCC (the trade association of construction product manufacturers) holds the technical chair and the CSTB (the French Scientific and Technical Centre for Building) administers it day to day.

PEP ecopassport is the sector database dedicated to equipment, run by the association of the same name (Gimélec, Ignes, Uniclima, AFAQ). Each PEP is then transferred to INIES under an exchange agreement, so an equipment manufacturer deals with a single entry point (PEP ecopassport), not two.

ECO Platform is the European association of national EPD programmes (IBU in Germany, EPD International, MRPI in the Netherlands). An ECO Platform EPD is valid on the European market, but to be used in a RE2020 calculation it must go through an additional registration in INIES. The CSTB manages the procedure, which takes a few weeks.

4Four questions to decide which declaration suits your product

Four questions guide an R&D or product marketing team through the choice. The format of the sheet depends on the product, the market and the volume.

Interactive tool · for decision-makers

Which environmental declaration for your product?

Three questions to point a manufacturer to the right format (FDES, PEP or EPD), based on its product type, commercial intent and target market. Indicative only: it does not replace a project scoping exercise.

Question 1 of 3
What is the physical nature of your product?

The declaration format depends first on how the product is installed: set in place, plugged in, or outside the scope of the construction industry.

Celsius · synthesis of INIES, PEP ecopassport, ECO Platform, EN 15804+A2

5Individual or collective FDES: cost, lead time and effect on your score

The two formats differ in cost by a factor of 5, and the choice affects the score of your product in RE2020 calculations.

Budget vs representativeness trade-off

How much an FDES costs, and what score you get

Three formats for entering INIES. The entry cost varies by a factor of 5, and the decision is about more than budget: it also involves a trade-off on the final score that will appear in your customers' Ic Construction calculation.

Differentiating
Individual FDES

Your data, your processes, your actual score.

Drafting budget
€12k to €15k
Third-party verification
€2k to €4k
Typical lead time
6 to 9 months
Resulting score
Reflects your performance
Accessible
Collective FDES

Published by your trade association.

Drafting budget
Membership (~€1k to €5k a year)
Third-party verification
Covered by the trade association
Typical lead time
Immediate once you join
Resulting score
Weighted average +10 to 20%
Flexible
Configurable FDES

A declaration that can be parameterised to suit the order.

Drafting budget
€15k to €22k
Third-party verification
€3k to €5k
Typical lead time
8 to 12 months
Resulting score
Reflects catalogue variability
À retenirIf your product performs better than the sector average, an individual FDES pays for itself as early asthe first tender in which Ic Construction is a differentiating factor.
Celsius · fee schedules of CSTB, Bureau Veritas and accredited bodies, 2026

An individual FDES costs between €10,000 and €15,000 for drafting by an accredited body (CSTB, Bureau Veritas and others) and €2,000 to €4,000 for the mandatory third-party verification. The typical lead time is 6 to 9 months from launch to publication, because LCA data has to be collected from your suppliers (modules A1-A2). It suits a manufacturer that wants its sheet to reflect its own performance and to benefit from optimised sourcing or low-carbon processes.

A collective FDES is published by a trade association (UNICEM for aggregates, UNPMF for insulation and so on) and covers a generic product type. It is either free or charged at a few thousand euros when you join. But it includes a conservative safety margin, typically +10% to +20% on the indicators, so as to cover all members. As a result, your product inherits the weighted average score, even if it performs better than the association's average.

For products that stand out from the market, the economics are reversed. If your low-carbon concrete performs 20% better than the generic one, the individual FDES pays for itself on the first public contract where that difference gets you over an Ic Construction threshold.

A configurable FDES is a recent variant: the manufacturer publishes a single sheet, parameterised for each order (thickness, finish, length). It is particularly useful for windows and doors and for coverings, where each product reference in the catalogue does not justify a dedicated FDES. Its cost sits between that of an individual and a collective FDES.

6Regulatory timeline: verification is mandatory and A1 sheets have been withdrawn

The milestones explain the time frames manufacturers have to work to. The body of standards has been built up over twenty years and is still evolving.

Standards framework · 20 years

The milestones that shaped the FDES market

The body of standards was built up over two decades. For a manufacturer, two dates matter: the publication of A2 (which sets the current format) and the end of the transition on 31 December 2025 (which forces the renewal of the catalogue).

2006
ISO 14025
Defines the Type III environmental declaration. The DNA of every EPD.
2012
EN 15804 (v1)
First sector-specific PCR dedicated to construction products.
2019
EN 15804+A2
Integration of the PEF method and its 16 indicators. GWP broken down into fossil / biogenic / land use.
4 August 2021
RE2020 ministerial order
Third-party verification mandatory for eligible FDES. End of self-declared sheets.
31 Dec. 2025
End of A1 transition
A1-format sheets lose their eligibility without weighting. Renewal to A2 is mandatory to stay competitive.
2027-2030
Extension & CSRD
FDES method under discussion for street furniture, roads and civil engineering. CSRD upstream scope (ESRS E1) makes FDES data a selling point for customers.
À retenirRenewing your A1 sheets as A2 isa 2026 catalogue priority.
ISO 14025:2006, EN 15804:2012, EN 15804+A2:2019, ministerial order of 4 August 2021, INIES transition schedule

2006: ISO 14025 sets the principles of type III environmental declarations, the foundation of every EPD. 2012: EN 15804 lays down the PCR for the construction sector. 2019: EN 15804+A2 rewrites the standard. It brings in the European Product Environmental Footprint (PEF) method with its 16 impact categories, and breaks global warming potential (GWP) down into fossil, biogenic and land use components. 4 August 2021: the RE2020 ministerial order makes third-party verification mandatory for eligible FDES, which ends self-declared sheets.

2026: A1-format sheets are withdrawn from the INIES database, on 1 January 2026 for those verified in 2020 and on 1 July 2026 for those verified in 2021 and 2022. Only A2 sheets remain available for a RE2020 calculation.

Looking ahead to 2027-2030: the new European Construction Products Regulation (Regulation (EU) 2024/3110) progressively makes the declaration of product environmental indicators mandatory, starting with climate impact. And upstream scope reporting under the CSRD (Corporate Sustainability Reporting Directive, ESRS E1) makes the availability of FDES data a selling point with project owners that report their product footprint.

7EPD, FDES and PEP side by side: cost, RE2020 eligibility, governance and standard

The table below compares seven dimensions: cost, RE2020 eligibility, governance, standard and format.

Reading guide

EPD, FDES, PEP: where the real differences lie

Six dimensions are enough to place any sheet on any building project.

EPD
International
FDES
Construction · FR
PEP
Equipment · FR
Reference standard
EPDISO 14025
FDESISO 14025 + EN 15804+A2 + NF CN
PEPISO 14025 + EN 15804+A2 + PCR ed. 4
Product scope
EPDAny product
FDESConstruction products
PEPElectrical / HVAC equipment
Filing database
EPDEuropean database (ECO Platform)
FDESINIES
PEPPEP ecopassport → INIES
Third-party verification
EPDRecommended
FDESMandatory since 2017
PEPMandatory from the outset
RE2020 eligible
EPDNo (unless filed in INIES)
FDESYes
PEPYes
Governance
EPDECO Platform · ISO
FDESAlliance HQE-GBC · AIMCC · CSTB
PEPPEP ecopassport Association
Average drafting cost
EPD€10k to €20k + €2k to €5k verification
FDES€10k to €15k + €2k to €4k verification (individual)
PEP€12k to €18k + €2k to €4k verification (individual)
À retenirSame EN 15804+A2 foundation, three ways in.The scope determines the sheet.
Celsius · synthesis based on INIES, ECO Platform, PEP ecopassport

8Key takeaways

The four acronyms are four layers of one stack rather than four competing options for a manufacturer, and only the last two (FDES and PEP) can be used in France. The remaining choice is between an individual and a collective sheet.

Further reading · FDES trilogy

Three angles for mastering environmental declarations in the building sector

This article is part of a series of three publications covering FDES from three complementary angles: understanding the ecosystem, choosing the sheet on the manufacturer side, and operational use on the engineering consultancy side.

A manufacturer that publishes a collective FDES "by default" to avoid the cost of an individual one ends up inheriting its competitors' average score, plus the 10% to 20% safety margin applied by the trade association.

Three actions to decide on this year: (1) map your direct competitors' existing sheets in INIES; (2) check the validity of your current sheets (A1 versus A2, 5 years' validity); (3) work out the return on investment of an individual FDES on the tenders where the Ic Construction criterion is a differentiator.

Further resources

Frequently asked questions

Yes. Since the ministerial order of 4 August 2021, only FDES sheets verified by an independent third party and registered in INIES are accepted in the Ic Construction calculation. A self-declared or unverified sheet has no regulatory value. Where a product has no usable FDES, the calculation falls back on default environmental data (DED), with an automatic 30% penalty that mechanically worsens the score.
In practice, an individual FDES takes 6 to 9 months, in three steps: collecting LCA data from your suppliers (modules A1-A2, often the longest phase), LCA modelling by an accredited body, and third-party verification. Lead times lengthen if your upstream suppliers do not have structured environmental data of their own, so allow a buffer of 2 to 3 additional months for complex supply chains.
Under the regulation, yes: both are accepted. In technical terms, no: a collective FDES includes a conservative safety margin (typically +10% to +20%) that penalises manufacturers performing above the average. For a low-carbon product that stands out from the market, the individual FDES pays for itself on public contracts where the Ic Construction criterion is decisive.
Not directly. A foreign EPD (IBU, EPD International, MRPI, ECO Platform) must go through an additional registration in INIES, following the procedure managed by the CSTB. This step takes a few weeks to a few months, depending on the complexity of the product and the quality of the upstream data. A European manufacturer targeting the French market should plan for this step when scoping the project.
No, not since 1 July 2026. Since 1 November 2022, only the EN 15804+A2 version has been accepted for a new or renewed sheet. At the request of the DHUP (the French housing, urban planning and landscapes directorate), INIES postponed the withdrawal of A1 sheets verified in 2021 and 2022 to that date (those verified in 2020 were withdrawn on 1 January 2026). As a result, renewing A1 sheets as A2 is a catalogue priority for any manufacturer that wants to stay competitive on tenders after 2025.
No, they are two legally distinct databases. INIES is the national database of construction products (led by the Alliance HQE-GBC, administered by the CSTB). PEP ecopassport is the sector database for equipment (run by the PEP association, funded by the trade federations Gimélec, Ignes, Uniclima and AFAQ). An exchange agreement links the two: any PEP published in PEP ecopassport is automatically available on the INIES side for RE2020 calculation software, so there is a single entry point for registration.
It is a cost of access to the market, not a conventional return on investment. The calculation rests on two things: (1) the difference in Ic Construction score against the collective sheet of your trade association (how many fewer gCO2e per functional unit), and (2) the number of public or private tenders where that difference lets you clear a threshold. For a low-carbon concrete that performs 20% better than the UNICEM collective sheet, break-even is often reached on a single major public contract.
or: [email protected]

More articles to read

View all →
French environmental cost label for clothing: what changed on 1 October 2026
Regulation

French environmental cost label for clothing: what changed on 1 October 2026

6 min read
Which garments can display an environmental cost in France? Timeline and thresholds, 2025-2027
Regulation

Which garments can display an environmental cost in France? Timeline and thresholds, 2025-2027

10 min read
Removable batteries and battery passports: who is affected in 2027?
Regulation

Removable batteries and battery passports: who is affected in 2027?

14 min read

No two situations are exactly alike.

Tell us about yours: your situation, deadline and budget. A senior consultant will reply within 24 working hours with an honest assessment.

Let us discuss it within 24 hours →
Our toolkit

A full range of free assessment tools

Cost estimator, obligation and eligibility checkers, footprint calculator.

Estimate costs and impacts
Réf. 2026·BC·0184RAPPORT · EXERCICE 2026Bilan Carbone®complet 1·2·3Restitution Comex · Plan d'action 2027SOMMAIRE01Synthèse exécutivep. 402Périmètre et méthodologiep. 1203Émissions par scopep. 2404Plan d'action 2027p. 5605Annexes méthodologiquesp. 78VOLUME84 pages · ConfidentielRÉFÉRENTIELISO 14064 · GHG ProtocolDEVIS · BC.2026.0184Émis 05·05·2026 · Validité 30 jCabinet Celsius · Paris 3eCHIFFRAGE INDICATIFVotre entrepriseETI · 180 collaborateurs · CSRD 2027PRESTATIONBilan Carbone®Périmètre 1·2·3 · 13 semainesAIDE BPIFRANCE · - 60 %FOURCHETTE INDICATIVE HT16 800à 22 400 €DÉTAIL DE LA MISSION01 · CADRAGE3 sem.~ 4 200 €02 · MODÉLISATION8 sem.~ 9 800 €03 · RESTITUTION2 sem.~ 4 800 €Estimation indicative · Affinée après cadrageSIRET 891 234 567 00012

Bilan Carbone® cost estimator

Your price range in 1 minute, based on 2026 market rates and public funding.

1 minStart
Estimate costs and impacts
EMPREINTE IA · USAGE MENSUELVOTRE EMPREINTE TOTALE4,2 kgCO₂eq sur 1 000 prompts type · Mai 2026COMPARAISON DES MODÈLES · 1 000 PROMPTS TYPEGPT-4oOpenAI6,8 kgClaude OpusAnthropic2,1 kgGemini ProGoogle4,5 kgMistral LargeMistral AI · FR1,6 kg

AI carbon footprint calculator

The climate impact of your AI queries, by model and task. Ecologits methodology.

3 minStart
Check an obligation
DIAGDÉCARBON'ACTIONACCÉLÉREZ LATRANSFORMATIONÉNERGÉTIQUE ETÉCOLOGIQUE DEVOTRE ENTREPRISEDISPOSITIF OFFICIEL · BPIFRANCE × ADEMESIMULATEUR · ÉLIGIBILITÉÉLIGIBLEVous remplissez les 3 critères du Diag Décarbon'Action.VOTRE FINANCEMENT10 000 € HT6 000 €HTReste à charge après subvention BpifranceRÉPARTITION DU FINANCEMENTBPIFRANCE 40%VOUS 60%4 000 €6 000 €DISPOSITIF SUBVENTIONNÉ PAR

Diag Décarbon'Action eligibility

Check in 30 seconds whether your business is eligible for Bpifrance funding covering 40% of a Bilan Carbone® assessment.

30 secStart
Check an obligation
RÉPUBLIQUE FRANÇAISEMinistère de la Transition ÉcologiqueOBLIGATION LÉGALEBilan d'Émissions deGaz à Effet de SerreArticle L.229-25 du Code de l'environnementDécret 2022-982 · publié 1er juillet 2022PÉRIODICITÉ · 4 ANSDÉPÔT · ADEMESIMULATEUR · OBLIGATION BEGESASSUJETTI720 salariés · obligation BEGESSANCTION ENCOURUE50 000 €amende max si non-réalisationart. R.229-50RÉFÉRENCE OFFICIELLE

BEGES checker

Does the BEGES requirement apply to you? An immediate answer, with the deadline and penalty.

30 secStart
Check an obligation
9:42SCANSCANNING DPP...DPP IDENTIFIÉT-shirt coton bioSKU TX-CB-220 · Lot L-26-04781CONFORME ESPR42 DATA POINTS · 5 SECTIONSORIGINEInde · GOTSCoton bioEMPREINTE5,2 kg CO₂eqACV ISO 14040RECYCLABILITÉ85%Filière cotonRÉPARABILITÉ7,5 / 10Pièces accessiblesFIN DE VIEFilière TLC · Bordeaux/FRRécupérateur agréé RefashionUE · ESPR 2024/178112.05.2026

DPP checker

Is your product covered by the Digital Product Passport?

1 minStart
Check an obligation
COÛTENVIRONNEMENTAL386POINTS257POUR 100 GMéthode officielleEcobalyse, v7.0.0SIMULATEUR · AFFICHAGE ENVIRONNEMENTALÉLIGIBLETextile · affichage volontaireCOÛT ENVIRONNEMENTAL386 ptst-shirt 150 g · 257 pts pour 100 gExemple : FAQ du ministère de la Transition écologique

Textile environmental labelling 2026

Voluntary labelling, but third parties can publish it from October 2026: where do you stand?

1 minStart